Kitchen Remodeling in Elm Grove, WI

T And J All In Remodeling designs, permits and builds Elm Grove kitchen remodels, from cabinetry and countertops to studs-out rebuilds. One in-house crew runs the job, permits filed with Village Zoning and Planning, written price fixed before demolition.

Village permits filed  ·  Fixed written price  ·  No deposit to start

4.9 ★

59 Google reviews

A+

BBB Accredited

30+

Years building Wisconsin kitchens

Elm Grove at a glance

What an Elm Grove Kitchen Remodel Involves

Elm Grove is a small village with its own Building Board and a settled housing stock of mid-century colonials on wooded lots. Both affect how a kitchen job is scheduled.

Village permit

Zoning & Planning

Elm Grove issues its own permits from Village Hall on Juneau Boulevard rather than through a county office.

Board calendar

1st & 3rd Tuesday

Exterior changes go before the Building Board, which meets twice a month. Interior kitchen work does not, but anything touching the outside does.

Lead time

Two weeks

Building Board submittals are due two weeks ahead of the meeting, so exterior elements are planned early rather than late.

Our Elm Grove scope

What T And J Builds in Elm Grove Kitchens

T And J builds every part of an Elm Grove kitchen: cabinetry, countertops, islands, flooring, lighting and studs-out renovation. Mid-century colonials and ranches make up most of the village stock.

Kitchen with white shaker upper cabinets, stained lower cabinets and a tile medallion above the sink

Cabinets

Cabinetry for mid-century plans

Elm Grove kitchens were built as separate rooms with a dining room beside them. Cabinet runs are set against original plaster, so boxes are templated after demolition rather than ordered off the old plan.

Walls

Plaster, rarely square

Refacing

Fronts and hardware only

Storage

Pantry bank where the door was

Kitchen with stained wood cabinets, speckled granite countertops and a stone backsplash behind the range

Worktops

Countertop replacement

Village kitchens run shorter counters than the newer subdivisions nearby, so a single slab usually covers the job. Cabinets are levelled first because mid-century floors seldom are.

Stone

Quartz, granite, quartzite

Levelling

Corrected before templating

Basins

Undermount, apron front

Kitchen island with a veined quartz countertop, dark cabinetry and glass pendant lights

Layout

Opening the kitchen to the dining room

The most requested Elm Grove job is taking out the wall between kitchen and dining room. In a colonial that wall usually carries load, so it needs an engineered beam and a framing inspection.

Walls

Load-bearing in most colonials

Beams

LVL or steel, engineered

Island

Added once the wall is out

Remodeled kitchen with blue-gray shaker cabinets, a stainless range hood and a professional gas range

Full rebuild

Studs-out kitchen rebuild

Taking an Elm Grove kitchen to studs is where original 1950s and 1960s wiring and cast-iron waste lines get replaced instead of worked around. The village inspects the rough-in before anything closes.

Depth

Framing and subfloor

Services

Wiring, plumbing, ventilation

Filings

Village building, electrical, plumbing

Open-concept kitchen with a large island opening to a living room under vaulted beams

Exterior

Windows and doors on the kitchen wall

Changing a kitchen window or adding a garden window is an exterior alteration in Elm Grove, which goes to the Building Board with scaled elevations and material samples. T And J prepares and submits that package.

Review

Building Board, twice monthly

Drawings

Scaled elevations all sides

Samples

Materials and colours

Remodeled kitchen with warm wood cabinets, under-cabinet lighting and a stainless gas range

Fit-out

Floors, lights and appliances

Original oak floors often run under the kitchen lino in Elm Grove houses and are checked before anything new goes down. Added circuits are inspected by the village before closing.

Floors

Original oak checked first

Lights

Recessed and under-cabinet

Wiring

Village inspection before closing

Finished work

Kitchens We Have Finished in Elm Grove

Kitchens designed, permitted and built by T And J in Elm Grove. Finished jobs, photographed on completion.

Dining wall out

Colonial kitchen opened to the dining room

Plaster rebuilt

Original walls squared before cabinetry

Garden window

Board-approved window over a new sink run

Painted cabinetry

Two-tone boxes in a 1950s colonial

Pantry bank

Storage built where the back door was

Ranch update

Single-storey kitchen rebuilt in place

Range wall

Hood and slab splashback under a beam

Worktop detail

Stone run over levelled mid-century cabinets

More finished kitchens from Elm Grove and the surrounding county.

What it costs

How Much Does a Kitchen Remodel Cost in Elm Grove?

An Elm Grove kitchen remodel costs $25,000 to $80,000 and up. Village kitchens are compact but the houses are old enough that systems work often drives the figure. Every quote is one fixed written price before demolition.

1 to 2 weeks

Surface update

From $25k

Most Elm Grove jobs

3 to 5 weeks

Standard rebuild

$38k–$65k

5 to 8 weeks plus review

Full Rebuild

$80k and up

Price your Elm Grove kitchen

Enter your room size and finish level, then bring the figure to a free measure at the house.

Worktops and cabinets

Which Surfaces Suit an Elm Grove Kitchen?

Village kitchens are compact and the houses are settled, so the surface choice leans to low upkeep over showpiece slabs. These are what T And J installs in Elm Grove.

Engineered quartz

Forgiving over mid-century walls and never needs sealing.

Natural granite

Quarried stone, worth seeing before it is cut.

Quartzite

Marble look with a harder surface.

Marble

Classic in a colonial, and it will patina.

Shaker fronts

The default in Elm Grove colonials and capes.

Slab fronts

Suits the handful of newer builds in the village.

Factory paint

White through deep green and navy.

Stained grain

Oak and cherry, matched to original trim.

Worktop materials compared

Worktop materials compared for Elm Grove kitchens on sealing, mid-century fit, wear and typical use
MaterialSealingFits mid-century wallsDaily wearTypical Elm Grove use
Engineered quartz
Most chosen
NeverForgiving over old plasterShrugs off family useColonial and cape kitchens
Natural graniteYearlyNeeds a level substrateVery hard faceLarger ranch kitchens
QuartziteYearlyCareful slab layoutHarder than marbleIslands in daily use
MarbleEvery 6 to 12 monthsScribes to a crooked wallEtches from acidsClassic colonial baking runs
Solid surfaceNeverSeamless in a tight cornerSanded out if it marksCompact village kitchens

Home eras

Which Elm Grove Homes Are We Working In?

Elm Grove built out mainly in the two decades after the war, so the village stock is more uniform than its neighbours.

Transitional kitchen with white cabinets, a dark island and pendant lighting

1940s cape

Compact plan, small closed kitchen, often with a back stair beside it.

Contemporary galley kitchen with dark flat-panel cabinets and a black backsplash

1950s colonial

The village standard. Kitchen and dining room side by side with a wall between.

Galley kitchen with white cabinets, a custom range hood and granite countertops

1960s ranch

Single storey on a wooded lot, kitchen at the back with a service door.

Kitchen range wall with a stainless hood, gas cooktop and open shelving beside the refrigerator

1970s to 1980s

Later infill on larger parcels, with bigger kitchens that need cabinetry rather than structure.

Kitchen with stained wood cabinets, a matching wood range hood and a marble-look backsplash

Newer infill

A small number of replacement builds with contemporary plans.

Elm Grove permits

Do You Need a Permit for a Kitchen Remodel in Elm Grove?

Yes. An interior kitchen remodel needs a village building permit plus the electrical, plumbing and HVAC permits the work calls for.

Elm Grove issues its own permits through the Zoning and Planning Department at 13600 Juneau Boulevard, on (262) 782-6700. Interior work is handled over the counter. Anything visible from outside, including a new or enlarged kitchen window, is an exterior alteration and goes to the Building Board, which meets the first and third Tuesday of the month at 5:30. Submittals are due two weeks ahead with scaled elevations and material samples. T And J prepares the package and attends if needed.

Required

Moving plumbing or adding circuits

Village electrical and plumbing permits.

Board review

New or enlarged kitchen window

Exterior alteration, Building Board.

Required

Removing a wall between rooms

Engineered beam and framing inspection.

Counter only

Interior kitchen remodel

Building permit, no Board hearing.

Not required

Replacing a worktop or splashback

Nothing moves.

Not required

Floors, paint and handles

Finish work only.

The build

How an Elm Grove Kitchen Build Runs

A full Elm Grove kitchen runs five to eight weeks of construction, plus Building Board lead time if anything exterior changes.

Free visit  ·  Fixed price  ·  Village permits filed

First visit

Measure and plaster check

John measures the kitchen and checks what is behind the plaster, because mid-century wiring and cast-iron waste set the scope more than layout does.

No charge, at your house

Weeks 1 to 2

Plans and pricing

Cabinetry, slab and fixtures are chosen together on one itemised proposal, priced before anything is ordered.

No money down

Lead time

Village permits and materials

Permits are filed at Village Hall, any Board package is submitted, and cabinetry is ordered while approval runs.

Handled by T And J

Weeks 1 to 6

Strip out and rebuild

The crew strips the kitchen, squares the old walls, completes rough-in, then sets cabinetry, slab and appliances.

In-house crew

Last week

Sign-off and handover

Village inspections pass, then Teli and John walk the finished kitchen with you before the job closes.

Signed off by the owners

Google reviews

4.9

★★★★★

4.9 average from 59 Google reviews of T And J projects across Waukesha County.

Where we work

Where Else Do We Work Near Elm Grove?

T And J remodels kitchens across Waukesha County from a Brookfield shop, minutes from Elm Grove.

Next door

Brookfield surrounds the village and Wauwatosa sits just east.

West

Pewaukee, Waukesha and Delafield, a short run on I-94.

South

New Berlin, Greenfield and the Milwaukee County line.

Visit or call

Where Is T And J Located?

T And J All In Remodeling is based at 985 Georges Avenue in Brookfield, WI, on the I-94 corridor between Milwaukee and Lake Country. Consultations happen in your kitchen.

T And J All In Remodeling

985 Georges Avenue
Brookfield, WI 53045

Monday to Friday

8:00 AM to 5:00 PM

Saturday

8:00 AM to 5:00 PM

Sunday

Closed

Water emergencies

24/7

Common questions

Elm Grove Kitchen Remodeling FAQ

Ask about your own Elm Grove kitchen at (262) 352-9525.

How much does a kitchen remodel cost in Elm Grove?

An Elm Grove kitchen remodel costs $25,000 to $80,000 and up. Village kitchens are compact, so cabinetry runs shorter than in neighbouring subdivisions, but the houses are old enough that wiring and waste lines often drive the figure more than the finish level does.

Only if something changes on the outside. A new or enlarged kitchen window, a replaced service door, or any change to materials visible from the street is an exterior alteration and needs Building Board review. A purely interior kitchen remodel is handled over the counter.

The Building Board meets the first and third Tuesday of the month at 5:30. Submittals are due two weeks ahead, with scaled elevations from all sides, material samples and hard copies. T And J prepares that package and builds the lead time into the schedule rather than discovering it late.

The Village of Elm Grove issues its own permits through the Zoning and Planning Department at 13600 Juneau Boulevard, on (262) 782-6700. T And J files the building permit and the electrical, plumbing and HVAC permits the job calls for.

Usually. In an Elm Grove colonial that wall generally carries load, which means an engineered LVL or steel beam sized for the span, a village permit and a framing inspection. Opening the kitchen to the dining room is the most requested job in the village.

Often, in the working area. Elm Grove built out mainly in the 1940s to 1960s, and original circuits rarely carry a modern kitchen. What is inside the walls being opened is replaced and inspected on the electrical permit.

Frequently, yes. Mid-century Elm Grove houses often have original oak running under later kitchen flooring. T And J checks before ordering anything new, because refinishing what is there is usually cheaper and better than covering it again.

Construction runs one to two weeks for a surface update, three to five for a standard rebuild and five to eight for a studs-out job. Add two weeks of Building Board lead time if anything exterior is changing.

Get started

Book a Free Kitchen Consultation in Elm Grove

John Karampetsos measures your Elm Grove kitchen, files the village permits, and sends one fixed written price. No deposit. No charge for the visit.

Send Your Details

Reply the same working day.

No deposit  ·  No obligation  ·  Details stay with T And J

Request Your Free Consultation

Three short steps. John replies within 24 hours.

No deposit  ·  No obligation  ·  Your details stay private

T&J All In Remodeling
Free In-Home Estimate

The honest way to
remodel your Kitchen!

Teli and John quote every job themselves and build it start to finish — no subcontractors, no rotating crews. Tell us what you’re planning and we’ll bring a written, itemised estimate.

Quoted and built by the owners — no subcontractors. We’ll bring a written, itemised estimate.

4.9 59 Google reviews · BBB A+ · Licensed & insured
Recent work01 / 04
4.9Google Rating

“The team is reliable, honest, and operates with integrity.”

Maiyer Thao · Google
Kitchen · Waukesha County