Kitchen Remodeling in Greendale, WI

T And J All In Remodeling designs, permits and builds Greendale kitchen remodels — original Greenbelt kitchens replanned inside their own footprint, cabinetry and stone set by one in-house crew. Village permits filed. Fixed written price before demolition.

Permits filed  ·  Fixed written price  ·  No deposit to start

4.9 ★

59 Google reviews

A+

BBB Accredited

30+

Years building Wisconsin kitchens

Greendale at a glance

What a Greendale Kitchen Remodel Involves

A Greendale kitchen remodel costs $30,000 to $95,000 and takes one to eight weeks. The original village was built in 1938 as a planned Greenbelt town, and those houses have small, efficient kitchens with almost nothing to spare — which makes the plan matter more than the budget.

Permits filed

Two or three

A Greendale kitchen remodel takes building and electrical permits as standard, plus plumbing once a fixture moves. The Village of Greendale issues them, and work on an original house may also need design review.

Our base

16 miles north

985 Georges Avenue in Brookfield. The crew loads out there each morning and runs down Highway 100, so travel never comes out of build time.

Original village

1938 Greenbelt

The Greendale Originals are a designated historic district. Interiors are yours to change; anything visible from outside is not simply yours to decide.

Our Greendale scope

What T And J Builds in Greendale Kitchens

T And J builds every part of a Greendale kitchen: replanning inside a small footprint, cabinetry, stone, electrical, ventilation, flooring and final fit-out. One crew, one contract, one point of contact.

Kitchen with white shaker upper cabinets, stained lower cabinets and a tile medallion above the sink

Footprints

Replanning a Greendale Original kitchen

An original Greendale kitchen is often under eighty square feet with four doorways into it. The gain comes from removing one of those doorways, not from removing a wall: close the redundant opening, and a dead corner becomes a full run of cabinetry.

Doorways

One closed to gain a full run

Corners

Dead space recovered as storage

Walls

Usually stay where they are

Kitchen with stained wood cabinets, speckled granite countertops and a stone backsplash behind the range

Windows

Original steel casements

The original houses have steel casement windows, and on an elevation that faces the street they are part of what the district protects. Cabinetry is planned around the existing opening rather than assuming it can be enlarged, and the sill height decides what can sit under it.

Openings

Planned around, not enlarged

Sill

Sets what fits beneath

Review

Checked before anything is priced

Kitchen island with a veined quartz countertop, dark cabinetry and glass pendant lights

Worktops

Countertop and run lengths

In a room this size every inch of worktop counts, so the layout is drawn to the working triangle and the slab to the millimetre. A shallow return, a 600 mm wide appliance instead of a 750, and a drainer grooved into the stone rather than sitting on it all buy usable space.

Stone

Quartz, granite, quartzite

Drainer

Grooved in, not fitted on

Basins

Single bowl to keep run length

Remodeled kitchen with blue-gray shaker cabinets, a stainless range hood and a professional gas range

Full rebuild

Studs-out kitchen rebuild

A studs-out rebuild in a Greendale Original exposes 1938 construction: cloth-covered wiring, a vent that was never fitted, and plaster on rock lath that has to be cut carefully because there is no spare wall to lose.

Depth

Framing and subfloor

Services

Wiring, plumbing, ventilation

Filings

Village building, electrical, plumbing

Open-concept kitchen with a large island opening to a living room under vaulted beams

Storage

Getting more into a small room

A small kitchen gains far more from better storage than from more square footage. Cabinetry to the ceiling, deep drawers instead of base cupboards, a pull-out larder in a 300 mm gap and the space over the door used for what you reach for twice a year.

Height

Carried to the ceiling

Below

Drawers, never cupboards

Gaps

300 mm pull-outs used

Remodeled kitchen with warm wood cabinets, under-cabinet lighting and a stainless gas range

Fit-out

Floors, lights and appliances

Compact appliances do real work here: a 600 mm range, a slimline dishwasher and an integrated fridge all buy back run length. Lighting goes under the cabinets and into the ceiling, because a pendant in a room this size is in the way.

Floors

Continuous, no threshold strips

Lights

Recessed and under-cabinet only

Wiring

Village inspection before closing

Finished work

Kitchens We Have Finished in Greendale

Kitchens designed, permitted and built by T And J across Greendale — the original village and the postwar streets beyond it.

Doorway closed

Redundant doorway closed to gain a full run of cabinetry

Ceiling used

Cabinetry carried to the ceiling in an original Greendale kitchen

Drawers fitted

Base cupboards replaced with deep drawer banks throughout

Casement kept

Cabinetry planned around an original steel casement window

Larder squeezed

Pull-out larder fitted into a 300 mm gap beside the range

Compact appliances

600 mm range and slimline dishwasher fitted to buy back run length

Wiring renewed

Cloth-covered wiring replaced and the kitchen recircuited

Floor run through

One floor material run from kitchen into the dining space

Every Greendale kitchen above was permitted with the Village and built by the T And J crew.

What it costs

How Much Does a Kitchen Remodel Cost in Greendale?

A Greendale kitchen remodel costs $30,000 to $95,000. A small room does not mean a small price — the same trades attend, and 1938 wiring and plumbing usually need replacing before anything new goes in.

1 to 2 weeks

Surface update

From $30k

Most Greendale jobs

3 to 5 weeks

Standard rebuild

$45k–$70k

5 to 8 weeks plus permits

Full Rebuild

$95k and up

Price your Greendale kitchen

Enter your room size and finish level. Bring the figure to a free measure at your Brookfield home.

Worktops and cabinets

Which Surfaces Suit a Greendale Kitchen?

In a room under eighty square feet the surface choice is about keeping the space light and the joints few.

Engineered quartz

One colour with no busy movement keeps a small room calm. Never sealed.

Natural granite

Heavy patterning can crowd a small kitchen. Best in a quieter stone.

Quartzite

Pale, hard and forgiving where every surface is a working surface.

Butcher block

Warm and period-appropriate on a short return. Oil regularly.

Slab fronts

Flat panels with integrated handles, so nothing projects into a narrow aisle.

Shaker fronts

Correct for a 1938 house, in paint rather than stain.

Ceiling-height runs

The single biggest storage gain available in an original Greendale kitchen.

Compact appliances

600 mm range, slimline dishwasher, integrated fridge. Each one buys run length.

Worktops and cabinetry compared for small Greendale kitchens

Worktops and cabinetry compared for small Greendale kitchens on run length, visual weight and upkeep
MaterialKeeps the room lightBuys run lengthUpkeepBest for in Greendale
Quartz
engineered
Yes in a plain colourGrooved drainer saves spaceNoneOriginals and postwar alike
Quartzite
natural stone
Pale and hardSingle bowl keeps the runReseal yearlyEveryday working kitchens
Granite
natural stone
Heavy patterning crowdsNeutralReseal every 12–18 monthsLarger postwar kitchens
Butcher block
wood
Warms a small roomShort returns onlyOil every 6–8 weeksPeriod-correct returns
Slab fronts
integrated handle
Nothing projectsKeeps a narrow aisle clearWipe downGalley layouts
Shaker fronts
face frame
Correct for 1938Costs a little widthWipe downGreendale Originals
Ceiling-height run
tall cabinetry
Draws the eye upAdds a whole tierWipe downEvery original kitchen
Compact appliances
600 mm range
YesBuys back 150 mmStandardRooms under 80 sq ft

Home eras

Which Greendale Homes Are We Working In?

Greendale splits sharply between the planned 1938 village and everything built around it afterwards, and the two need different approaches.

Transitional kitchen with white cabinets, a dark island and pendant lighting

1938 Originals

Greenbelt houses in the historic district. Small kitchens, steel casements, rock lath.

Contemporary galley kitchen with dark flat-panel cabinets and a black backsplash

1950s to 1960s

Postwar ranches beyond the original village, with a slightly larger kitchen.

Galley kitchen with white cabinets, a custom range hood and granite countertops

1970s to 1980s

Colonials and splits with a closed kitchen and a separate dining room.

Kitchen range wall with a stainless hood, gas cooktop and open shelving beside the refrigerator

1990s onward

Later subdivisions, already open-plan, where the work is cabinetry and stone.

Kitchen with stained wood cabinets, a matching wood range hood and a marble-look backsplash

Condominiums

Compact plans with shared services and association rules on work hours.

Greendale permits

Do You Need a Permit for a Kitchen Remodel in Greendale?

Yes, for anything past finishes. The Village of Greendale issues building, electrical and plumbing permits and runs its own inspections.

On an original Greendale house, anything that changes what is visible from the street can also need design review. Interior replanning generally does not, but a window or an exterior door does, so that is established before the work is priced rather than after.

Required

Closing a redundant doorway

Framing inspected before board.

Required

Moving the sink or the range

Plumbing permit; rough-in inspected.

Required

Replacing 1938 kitchen wiring

Electrical permit; GFCI at the worktop.

Check first

Altering a street-facing window

Design review in the historic district.

Not required

Replacing a worktop in place

Nothing structural moves.

Not required

Floors, paint and handles

Finish work only.

The build

How a Greendale Kitchen Build Runs

A full Greendale kitchen runs five to eight weeks plus permit time. In a room this size the sequence matters more than usual, because two trades cannot work in it at once.

Free visit  ·  Fixed price  ·  Brookfield permits filed

First visit

Measure and doorway assessment

The kitchen is measured to the inch, the doorways are counted, and the one that can be closed to gain a full run of cabinetry is identified before anything else is decided.

No charge, at your house

Weeks 1 to 2

Layout, selections and pricing

The plan is drawn to the working triangle, appliance sizes are chosen to suit the run, and the written quote that follows is the price the job is built at.

No money down

Lead time

Village permits and cabinetry

Permit review and cabinet shop time are started the same week, with any design review begun alongside them.

Handled by T And J

Weeks 1 to 6

Strip out and rebuild

The kitchen comes out, the doorway is closed and framed, wiring and plumbing are renewed and inspected, then cabinetry, stone and floors follow.

In-house crew

Last week

Sign-off and handover

Final inspections are signed, the snag list is cleared, and the kitchen is handed over with a written warranty.

Warranty in writing

Google reviews

4.9

★★★★★

4.9 average from 59 Google reviews of T And J projects across Waukesha County.

Where we work

Where Else Do We Work Near Greendale?

Kitchens across southern Milwaukee County and over the Waukesha County line, reached from the Brookfield yard.

Next door

Greenfield, Franklin, Hales Corners and Oak Creek.

North

West Allis, Wauwatosa and Milwaukee.

West

Muskego, New Berlin and Waukesha.

Visit or call

Where Is T And J Located?

T And J All In Remodeling is based at 985 Georges Avenue in Brookfield, WI, on the I-94 corridor between Milwaukee and Lake Country. Consultations happen in your kitchen.

T And J All In Remodeling

985 Georges Avenue
Brookfield, WI 53045

Monday to Friday

8:00 AM to 5:00 PM

Saturday

8:00 AM to 5:00 PM

Sunday

Closed

Water emergencies

24/7

Common questions

Greendale Kitchen Remodeling FAQ

Questions about a specific Greendale kitchen are answered on the phone: (262) 352-9525.

What does a kitchen remodel cost in Greendale?

A Greendale kitchen remodel costs $30,000 to $95,000. A surface update in the existing footprint sits near $30,000. A replanned rebuild with cabinetry to the ceiling, deep drawers throughout and new circuits runs $45,000 to $70,000. Studs-out work with a doorway closed and services renewed starts at $95,000. A small room does not mean a small price, and the figure is fixed in writing before demolition.

Rarely by moving a wall, and usually by removing a doorway. An original Greendale kitchen often has four ways in, which leaves four dead corners and no continuous run. Closing the doorway nobody uses converts the worst of those corners into a full stretch of cabinetry and worktop. It is framing work rather than structural work, and it changes the room more than an extension would.

Inside, no. Interior layout, cabinetry, wiring and plumbing are yours to change. The district protects what the street sees: the elevation, the roofline, the original steel casements and the exterior finishes. So a replanned kitchen is straightforward; a new window on a street-facing wall is a conversation with the village first. That check happens before the work is priced.

On a street-facing elevation, not without review. The steel casements are part of what the historic district protects, and replacement is assessed on a case-by-case basis. The practical approach is to plan the kitchen around the opening that is there — the sill height decides what can sit beneath it, and the existing width decides where the run breaks. Rear elevations are usually more flexible.

Four to seven weeks. In a room under eighty square feet only one trade can work at a time, so the sequence is tighter than the size suggests. Strip-out, doorway framing and rough-in take the first week or two and are inspected before board. Counters are templated once boxes are level and fixed, adding ten to fourteen days for fabrication.

By using height and depth rather than area. Cabinetry carried to the ceiling adds a full extra tier. Deep drawers replace base cupboards, because nothing is lost at the back of a drawer. A 300 mm gap beside the range takes a pull-out larder. The space above a doorway holds what you reach for twice a year. Together those change a small kitchen more than any amount of rearranging does.

The kitchen circuits, yes. Cloth-covered wiring from 1938 has no ground and its insulation is long past its service life, and it was never intended to carry a modern kitchen load. The room is recircuited with GFCI protection at the worktop and dedicated circuits where appliances need them. Anything outside the kitchen is reported rather than quietly left in place.

Greenfield, Franklin, Hales Corners and Oak Creek sit around Greendale, with West Allis, Wauwatosa and Milwaukee north, and Muskego, New Berlin and Waukesha west. One crew covers all of them from the Brookfield yard.

Get started

Book a Free Kitchen Consultation in Greendale

A free measure counts the doorways, measures to the inch and identifies where the run can grow, then returns a written price for the Greendale kitchen as drawn. Nothing is payable to begin.

Send Your Kitchen Details

John replies the same working day.

No deposit  ·  No obligation  ·  Details stay with T And J

Request Your Free Consultation

Three short steps. John replies within 24 hours.

No deposit  ·  No obligation  ·  Your details stay private

T&J All In Remodeling
Free In-Home Estimate

The honest way to
remodel your Kitchen!

Teli and John quote every job themselves and build it start to finish — no subcontractors, no rotating crews. Tell us what you’re planning and we’ll bring a written, itemised estimate.

Quoted and built by the owners — no subcontractors. We’ll bring a written, itemised estimate.

4.9 59 Google reviews · BBB A+ · Licensed & insured
Recent work01 / 04
4.9Google Rating

“The team is reliable, honest, and operates with integrity.”

Maiyer Thao · Google
Kitchen · Waukesha County