Bathroom Remodeling in Greendale, WI

T And J All In Remodeling designs, permits and builds Greendale bathroom remodels: storage let into the stud bays and depth borrowed rather than added, with pans membraned and held under test. Village permits filed. Fixed written price.

Village permits filed  ·  Pans held under test  ·  No deposit

4.9 ★

59 Google reviews

A+

BBB Accredited

30+

Years combined experience

Greendale at a glance

What a Greendale Bathroom Remodel Involves

The bathroom in an original 1938 Greendale house is about 5 by 7 with one window, one door and nowhere to put anything. Nothing can be added to the footprint, so everything has to be found inside the walls that are already there.

Investment

$12k–$35k+

A refresh inside the existing footprint through to a studs-out rebuild with recessed storage throughout.

Out of service

1–4 weeks

An original Greendale house often has only one bathroom, so the sequence is built around the shortest possible closure.

Depth

Found, not added

A stud bay is three and a half inches deep. That is enough for a medicine cabinet, a niche or a recessed roll holder in every wall of the room.

Our Greendale scope

What T And J Builds in Greendale Bathrooms

T And J rebuilds every part of a Greendale bathroom: recessed storage, shallow fixtures, showers and pans, tile, extract, lighting and accessible fit-outs.

bathroom-remodel-scaled.jpg

Recessed

Storage let into the stud bays

Every wall in a Greendale bathroom has three and a half inches of depth hiding behind it. A recessed medicine cabinet, a shower niche between two studs, a recessed roll holder and a shallow linen press let into a partition all add usable storage without taking a single inch of floor.

Depth

Three and a half inches per bay

Rule

Never cut into an exterior wall

Result

Storage with no floor lost

Bathroom Remodel Near Menomonee Falls

Shallow

Fixtures that give back the floor

A standard vanity is 21 inches deep and eats a small room. An 18 inch or 16 inch vanity, a wall-hung basin with a shelf below, and a compact-projection toilet each give back three to five inches of floor: which in a 5 by 7 is the difference between passing the basin and squeezing past it.

Vanity

16 to 18 in rather than 21

Basin

Wall-hung with a shelf below

Toilet

Compact projection pan

luxury-bathroom-remodel-scaled.jpg

Borrowing

Taking depth from the room next door

Where a stud bay is not enough, depth can sometimes be borrowed from a cupboard or a hall on the other side of a partition. A press taken eight inches into an adjoining wardrobe is invisible from that side and transforms the bathroom: provided the wall is not carrying load and nothing lives in it.

Source

An adjoining cupboard or hall

Check

Load and services traced first

Result

Full-depth storage in a tiny room

Walk-in shower with frameless glass, marble-look tile, a built-in bench and linear drain in a remodeled bathroom

Full rebuild

Back-to-framing bathroom rebuild

Stripping a Greendale Original to studs shows 1938 construction: cloth-covered wiring, galvanised branches, plaster on rock lath and a vent that was never fitted at all.

Reach

Studs and subfloor

Systems

Supply, waste, vent, power

Sign-off

Rough-in before board

Accessible bathroom remodel with a white vanity, wide doorway and slip-resistant floor

Showers

Getting a shower into a 5 by 7

The original Greendale bathroom has a built-in tub and no shower. Converting the alcove gives a 30 by 60 tiled shower with a niche, a bench where the width allows, and a glass panel rather than a door so nothing swings into the room.

Footprint

30 by 60 in the tub alcove

Niche

Recessed between the studs

Glass

Fixed panel, nothing to swing

Double vanity with a white quartz top, undermount sinks and matte black faucets

Fit-out

Extract, lighting and fixtures

A 1938 bathroom was ventilated by opening the window, which does nothing in January. A ducted extract, wet-rated lighting over the pan and GFCI-protected circuits bring the room up to a standard it never had.

Extract

Added and ducted to open air

Lighting

Wet-rated over the pan

Circuits

GFCI, on its own permit

Finished work

Bathrooms We Have Finished in Greendale

Bathrooms designed, permitted and built by T And J across Greendale: the original 1938 village and the postwar streets beyond it.

Cabinet recessed

Medicine cabinet let into the stud bay above the basin

Niche built

Shower niche recessed between two studs in the wet wall

Depth borrowed

Linen press taken eight inches into an adjoining wardrobe

Vanity slimmed

18 inch vanity fitted to give back floor in a 5 by 7

Tub converted

Built-in tub alcove converted to a 30 by 60 tiled shower

Panel fitted

Fixed glass panel used so nothing swings into the room

Extract added

Ducted fan fitted in a bathroom that only ever had a window

Wiring renewed

Cloth-covered wiring replaced and the room recircuited

Further Greendale bathrooms, each membraned, tested and signed off before tile.

What it costs

How Much Does a Bathroom Remodel Cost in Greendale?

A Greendale bathroom remodel costs $12,000 to $35,000 and up. A small room keeps tile and fixture costs down, but 1938 wiring and plumbing usually need replacing before anything new goes in.

7 to 10 days

Surface update

$12k–$16k

Most Greendale jobs

About three weeks

Standard rebuild

$18k–$28k

3 to 4 weeks plus review

Full Rebuild

$35k and up

Price your Greendale bathroom

Enter the room size and finish level, then bring the figure to a free measure at the house.

Surfaces and vanities

Which Wet-Area Surfaces Suit a Greendale Bathroom?

In a room this small the surface has to keep the space light and the joints few, and sit honestly beside 1938 detailing.

Porcelain tile

Pale and low absorption, over a bonded membrane. The default here.

Hex mosaic

Period-correct on a 1938 floor and better underfoot than large format.

Subway tile

Three by six with a capped edge, at the height the room was built for.

Natural stone

Visually heavy in a 5 by 7 and porous. Kept to a threshold at most.

Recessed cabinet

Three and a half inches of depth from a stud bay, for nothing in floor.

Shallow vanity

16 to 18 inches deep, which gives back real floor in a tiny room.

Wall-hung basin

Clears the floor entirely and makes the room read larger.

Fixed glass panel

Nothing swings into a room that has no spare floor to swing into.

Surfaces and storage compared for small Greendale bathrooms

Surfaces and fixtures compared for small Greendale bathrooms on floor given back and storage gained
SurfaceFloor given backStorage gainedUpkeepBest for in Greendale
Recessed cabinet
stud bay
None lost3.5 in of depth freeWipe downAbove every basin
Shower niche
stud bay
None lostBottles off the floorSeal grout onceThe wet wall
Shallow vanity
16–18 in
3 to 5 in backSlightly less than 21 inWipe downRooms 5 by 7 and under
Wall-hung basin
no pedestal
Clears the cornerShelf below onlyWipe downThe tightest rooms
Compact pan
short projection
3 to 4 in backn/aStandardEvery Original bathroom
Fixed glass panel
no door
Nothing swingsn/aSqueegee after useConverted tub alcoves
Hex mosaic
1 in
n/an/aSeal grout oncePeriod-correct floors
Porcelain tile
through-body
n/an/aSeal grout onceWalls and shower

Bathroom sizes

What Fits in a Greendale Bathroom?

Greendale splits between the 1938 Originals and everything built after. The Originals set the hardest problem, and the answers come from the walls rather than the floor.

Powder room with black marble-look porcelain on the walls and floor

5 by 7 Original

The Greendale standard. Tub alcove on the short wall, basin and toilet opposite.

Remodeled bathroom with a wood vanity, black marble-look floor tile and glass shower

Under 5 by 7

Found in the smaller Originals. A shower, a shallow vanity, nothing else.

bathroom-remodel-brookfield-wi-scaled.jpg

Postwar hall bath

Slightly larger, with room for a proper vanity and a linen press.

Bathroom Remodel Waukesha

Powder room

Under 20 square feet. A wall-hung basin with a shelf beats a pedestal.

Long bathroom remodel with a glass walk-in shower, green vanity and marble-look floor

Condominium bath

Compact plan with shared services and association rules on working hours.

Greendale permits

Do You Need a Permit for a Bathroom Remodel in Greendale?

Yes, once plumbing moves or circuits are added. The Village of Greendale issues the permits and a licensed plumber files the plumbing application.

Interior work in an original house is yours to do; anything that changes what the street sees can need design review. Recessing storage into an interior partition is fine, but never into an exterior wall where insulation belongs. T And J establishes both before quoting.

Required

Converting the tub alcove to a shower

Plumbing permit; rough-in inspected.

Required

Recessing storage into a partition

Framing inspected where studs are cut.

Required

Replacing 1938 bathroom wiring

Electrical permit; GFCI required.

Required

Adding a ducted extract fan

Building and electrical; termination inspected.

Not required

Like-for-like vanity replacement

Services stay where they are.

Not required

New tile on a sound surround

Cosmetic work only.

The build

How a Greendale Bathroom Build Runs

A full Greendale bathroom runs three to four weeks plus village review. In a room this small only one trade fits at a time, so the sequence is tighter than the size suggests.

Free visit  ·  Drawings prepared  ·  ETRAKiT filing handled

First visit

Measure and find the depth

The room is measured to the inch and every wall is checked for what is behind it, because in a Greendale bathroom the storage has to come out of the walls rather than the floor.

No charge, at your house

Weeks 1 to 2

Selections and fixed price

Fixture depths, recessed storage and tile are chosen together against the measured room, and the quote issued afterwards is the number the job is built to.

No money down

Review time

Village filing

The plumbing application goes in while fixtures and glass are ordered, so the two run side by side.

Handled by T And J

Weeks 1 to 2

Strip out, rough-in, inspection

The room comes back to studs, storage is let into the partitions, wiring and plumbing are renewed, and rough-in is signed before board.

In-house crew

Last weeks

Membrane, test, tile, handover

The bed is sloped, the membrane bonded and held under water for a full day, then tile and fit-out follow and the room is handed back under written warranty.

Warranty in writing

Google reviews

4.9

★★★★★

4.9 average from 59 Google reviews of T And J projects across Waukesha County.

Where we work

Where Else Do We Remodel Bathrooms Near Greendale?

Bathrooms across southern Milwaukee County and over the Waukesha County line, run from the Georges Avenue yard in Brookfield.

Next door

Greenfield, Franklin, Hales Corners and Oak Creek.

North

West Allis, Wauwatosa and Milwaukee.

West

Muskego, New Berlin and Waukesha.

Visit or call

Where Is T And J Located?

T And J All In Remodeling is based at 985 Georges Avenue in Brookfield, WI, on the I-94 corridor between Milwaukee and Lake Country. Consultations happen in your kitchen.

T And J All In Remodeling

985 Georges Avenue
Brookfield, WI 53045

Monday to Friday

8:00 AM to 5:00 PM

Saturday

8:00 AM to 5:00 PM

Sunday

Closed

Water emergencies

24/7

Common questions

Greendale Bathroom Remodeling FAQ

Call (262) 352-9525 to talk through a specific Greendale bathroom.

How much does a bathroom remodel cost in Greendale?

Between $12,000 and $35,000. A refresh runs $12,000 to $16,000. A rebuild with the tub alcove converted to a shower, recessed storage and a shallow vanity runs $18,000 to $28,000. Studs-out work with 1938 supply and waste renewed starts around $35,000. A small room keeps tile and fixture costs down; the wiring and plumbing behind it do not care how small the room is. Fixed in writing before demolition.

Not in footprint, and it does not need to be. The floor area is fixed by walls you would not want to move, but the room can be made to feel and function considerably larger: shallower fixtures give back three to five inches of floor, a wall-hung basin clears the corner entirely, and everything that used to sit on the floor or project from the wall goes into it instead.

Out of the walls. Every stud bay gives three and a half inches of depth: enough for a medicine cabinet above the basin, a niche in the shower wall, a recessed roll holder and a shallow press. None of it costs a single inch of floor. Where more depth is needed, it is sometimes borrowed from a cupboard on the other side of a partition.

Interior partitions, yes. Exterior walls, no: that depth is insulation, and cutting into it in a Wisconsin house trades storage for a cold spot and a condensation risk. Before anything is cut, the wall is checked for load and traced for wiring, waste and vent, because a stud bay with a stack in it is not available however convenient it looks.

Two to four weeks. A refresh closes the room for seven to ten working days. A rebuild with the alcove converted runs about three weeks, including the full day the pan sits under test. Studs-out work runs three to four weeks plus village review. Many original Greendale houses have only one bathroom, so the sequence is tightened as far as the inspections allow.

Yes. The built-in tub alcove is almost exactly 30 by 60, which is a perfectly good tiled shower footprint. The tub comes out, the alcove is rebuilt to cement board with a sloped bed and bonded membrane, a niche goes in between the studs, and a fixed glass panel replaces the curtain so nothing swings into a room that has no floor to spare.

Not inside. The district protects what the street sees: the elevation, the roofline, the original steel casements and the exterior finishes. Layout, fixtures, tile, wiring and plumbing inside the bathroom are yours. The one place it intersects is a window: altering a street-facing one needs review, so the plan is drawn around the opening that is there.

Greenfield, Franklin, Hales Corners and Oak Creek sit around Greendale, with West Allis, Wauwatosa and Milwaukee north, and Muskego, New Berlin and Waukesha west. One crew covers all of them from the Brookfield yard.

Get started

Book a Free Bathroom Visit in Greendale

The free visit measures to the inch and finds the depth hiding in the walls, then a written price follows for the Greendale bathroom as drawn.

Send Your Details

Reply the same working day.

No deposit  ·  No obligation  ·  Details stay with T And J

Request Your Free Consultation

Three short steps. John replies within 24 hours.

No deposit  ·  No obligation  ·  Your details stay private

T&J All In Remodeling
Free In-Home Estimate

The honest way to
remodel your Kitchen!

Teli and John quote every job themselves and build it start to finish — no subcontractors, no rotating crews. Tell us what you’re planning and we’ll bring a written, itemised estimate.

Quoted and built by the owners — no subcontractors. We’ll bring a written, itemised estimate.

4.9 59 Google reviews · BBB A+ · Licensed & insured
Recent work01 / 04
4.9Google Rating

“The team is reliable, honest, and operates with integrity.”

Maiyer Thao · Google
Kitchen · Waukesha County