Home Additions in Elm Grove, WI

T And J All In Remodeling designs and builds home additions for Elm Grove’s postwar colonials and ranches, from rear family rooms and bump-outs to second stories, sunrooms and in-law suites. Owners Teli and John Karampetsos draw each one for the village Building Board, whose approval comes before any permit.

Board package prepared · Setbacks checked · Fixed written price

4.9 ★

60+ Google reviews

A+

BBB Accredited

30+

Years combined experience

Village limits

Elm Grove Addition Limits: Building Board, Setbacks, Coverage

An addition changes what neighbors see, so the Village of Elm Grove reviews it more closely than interior work. Every addition goes before the Building Board ahead of any permit, and its size is capped by yard setbacks and by how much of the lot is already under roof and pavement.

Building Board

Decision first

The village states that all addition projects need Building Board approval before any permit, and the Board sits on the first and third Tuesday.

Yards

50 / 25 / 20 ft

Single-family districts keep building 50 feet back from the street, 25 feet from the rear line and 20 feet from each side.

Lot coverage

20% footprint

Most village districts cap building footprint at 20 percent of the lot and hard surfaces at 30 percent, while RS-4 allows 25 and 40.

Which wall

Which Additions Fit an Elm Grove House and Lot?

Most village houses date from the 1950s and 1960s and sit on lots of 15,000 square feet or more, so yard space is rarely the limit. The real questions are which wall faces the room you need and whether the Board will accept where the new roofline meets the old one.

Close view of a sunroom addition gable with angled glass panels over sliding doors and new tan lap siding

Rear of the house

Rear family room additions

A family room, primary suite, office or larger kitchen on its own foundation, usually off the back where the 25 foot rear yard leaves the most room. T and J pours the footings, frames against the existing wall and carries the roof pitch and siding across so the addition reads as original.

Typical spot

Behind the house, into the rear yard

Foundation

Slab, crawlspace or basement

Seam

Roofline and siding matched

Exterior of a Wisconsin home with a small single storey bump out addition, matching siding, a shed roof and new windows

Inside the setbacks

Bump-out additions for closed kitchens

A few feet added to a kitchen, bath or breakfast nook, cantilevered off the floor joists or set on a short foundation. In a village colonial with a closed kitchen, a rear bump-out can make room for an island while staying well clear of the 20 foot side yards.

Depth

A few feet, one wall

Carried by

Joists or a short foundation

Suits

Closed postwar kitchens

Wisconsin house with a new second story addition framed and sheathed over the original ranch with wrap on

No new coverage

Second stories on village ranches

Where a single-story ranch has used up its footprint allowance, a second floor adds space without adding coverage. An engineer confirms the existing foundation and walls can take the load, the village’s 36 foot height limit is checked, and a stair is fitted into the plan below.

Load

Engineer-checked

Height

Under the 36 ft limit

Suits

Ranches at their footprint cap

Exterior of a four season sunroom addition on the back of a Wisconsin house with walls of windows and a patio

Year-round light

Sunroom additions

A glass room facing the back yard and the mature trees many village lots carry. Four-season versions get insulation and heat that meet the energy code so they work in January, and three-season versions skip both. Because glazing, frame color and roof shape all show from outside, the Board sees material samples before it decides.

Season

Three or four

Board review

Glass, frame and roof samples

Heat

Ducted or ductless

Exterior of an in law suite addition with its own covered private entry door, a paved walk and matching siding

Family nearby

Sewered in-law suites

A parent or adult child gets a bedroom, a bathroom and a sitting room, and sometimes a kitchenette and a private entry. Village homes drain to public sanitary sewer, so the plumbing plan centers on reaching the existing stack or lateral, and the village’s sewer lateral form is added if the lateral is altered.

Rooms

Bedroom, bath, sitting room

Extras

Kitchenette, own entrance

Plumbing

Tied to the sewer lateral

Mudroom addition entry with a bench, cubbies, hooks and a tiled floor with a door to the garage

Back door

Driveway entry additions

A small entry off the driveway or garage with a bench, lockers, a closet and a tile floor for snow and salt. On a village lot the added footprint and any new walk count toward the hard-surface limit, so both are measured on the survey.

Storage

Bench, lockers, closet

Floor

Tile or LVP for winter boots

Often with

Laundry or half bath

Two-storey home addition under construction with drywall hung and a carpenter working at the window wall

Picture it

Picturing an Addition on an Elm Grove House

Each tile shows one addition type. Only the family room is a finished T and J project, built in Hartland. The other four photos illustrate the type and were not taken in Elm Grove, and the gallery holds more completed work.

Family room addition

Open living room addition, Hartland

Primary suite

Bedroom suite with ensuite bath and closet

Kitchen bump-out

Island and seating gained from a few feet

Four-season sunroom

Glass-walled room facing the trees

In-law suite

Kitchenette and sitting area by its own door

Browse completed additions and remodels from across the county in the T And J gallery.

Village line items

What Drives the Cost of an Elm Grove Addition?

Every addition is priced on its footprint, foundation, roof tie-in and plumbing. Elm Grove adds its own line items, including a stamped survey, Board drawings and, when village staff or the Board request one, a grading and drainage plan reviewed by the village’s consulting engineer, with review costs billed back to the owner.

Least structure

Bump-Out

One wall pushed out

Ground floor

New footprint

Room Addition

One new room

Structure checked

Second Story or Suite

A full level

Set a budget first

Multiply your planned square footage by the guide’s Wisconsin per-square-foot ranges and bring that number to the lot walk.

Board-ready materials

Elm Grove Addition Materials for Frost and Board Review

An addition has to stand up to Wisconsin frost and snow, and in this village it also has to satisfy the Building Board, which rules on exterior appeal before a permit. Materials are chosen for both jobs.

Concrete Footings Below Frost

Poured below the frost line and inspected at footing and foundation stage.

Engineered I-Joists

Long, flat spans so new and old floors meet level.

LVL Headers and Beams

Span the opening cut through the original back wall.

Roof Trusses

Pitch set so the Board sees one roofline.

Wrap and Flashing

Lapped over the joint between old and new walls.

Matched Siding and Trim

Profile, color and trim read as one house.

Energy-Code Windows

Sized for light and egress, with cut sheets for review.

Ductless Mini-Split

Conditions the new room when the existing furnace cannot take more ductwork.

Foundation options compared

Foundation

Cost level

Space below

Where it fits

Slab on grade

Lowest

None

Sunrooms and mudrooms off a ranch

Crawlspace

Moderate

Room to run pipes and ducts

Additions meant to sit flush with the main floor

Full basement

Highest

Extra finishable space

Colonials already on a basement

Matching the existing foundation type keeps old and new floors at one height. On lots near Underwood Creek, grades and drainage are checked before a basement is chosen.

Village housing

Elm Grove Colonials, Capes and Ranches: Addition Options

Elm Grove incorporated in 1955, the median village house dates to 1962, and about half were built between 1940 and 1969. Detached single-family homes make up roughly three in four dwellings, so most additions join a postwar colonial, cape or ranch.

Postwar Colonials and Capes

The largest group, built in the 1950s and 1960s. A rear family room or a primary suite over a new basement usually works, with the addition roof pitched to match the main gable.

Village Ranches

Single-story homes on wooded lots. Spreading out uses the footprint allowance quickly, so a second floor or a modest rear room is often the better fit.

1970s and Later Homes

A little over a third of the stock, including replacement houses. Plans are larger, so additions are usually sunrooms, mudrooms or suites.

Pre-1950 Homes

About one in five houses, from the commuter decades before the village incorporated. Older foundations are checked for load before anything is added.

District Setback and Coverage Limits

RS-1 through RS-4 share the same yard setbacks, but lot size and coverage limits differ, so T And J confirms your district with Zoning and Planning before drawing.

Village approvals

Elm Grove Addition Permits and Building Board Approval

An addition enlarges the footprint, so the village asks for a stamped survey showing footprint and impervious area before and after, scaled elevations of all sides, floor plans of the affected rooms drawn at no less than 1/8 inch to the foot, and a landscaping plan with species, count and size.

The Building Board approves every addition before Zoning and Planning issues a permit. The full package, 14 copies on 11×17 sheets plus a digital set, is due at least 21 days before a first or third Tuesday meeting. The code of conduct sign and a DPW-approved culvert also come before the permit. T and J files all of it.

Required

Building Board approval

Exterior appeal judged before any permit.

Required

Stamped parcel survey

Footprint and impervious area, before and after.

Required

Building and trade permits

Structure, electrical, plumbing and HVAC.

Required

Code of conduct sign

Purchased before the permit issues.

If requested

Grading and drainage plan

Reviewed by the village’s consulting engineer.

If needed

Driveway, culvert or sewer lateral

Right-of-way work or an altered sewer lateral.

The build

Elm Grove Addition Steps, Board to Final

The Board calendar sets the earliest start, so drawings and the survey are finished before anything else. After approval the order is foundation, shell, systems and finishes, with the village inspector signing each stage.

Free site visit · Board package prepared · Stages paid as they finish

First visit

Lot, house and district

John measures the house, walks the yards against the 50, 25 and 20 foot lines, and asks about any past water from Underwood Creek.

At no charge

Design

Drawings and one price

Elevations from every side, floor plans and structure are drawn, then the whole addition is priced as one written figure.

Nothing paid up front

Approvals

Board, survey, permits

The Board package goes in three weeks before a meeting; permits and the code of conduct sign follow approval.

Filed by T And J

Shell

Footings to roof

Footings and foundation are inspected, the frame is tied to the house, and roof, wrap and siding close it in.

One in-house crew

Finish

Systems, rooms and opening

Wiring, plumbing and insulation are inspected before drywall, then trim and flooring go in, and the original wall comes down at the very end.

Walked with Teli and John

Wisconsin home exterior with a detached garage and a T and J All In Remodeling truck on site

Google reviews

4.9

★★★★★

4.9 average from 60+ Google reviews of T And J remodeling projects across Waukesha County and southeastern Wisconsin.

Nearby

Additions in Towns Around Elm Grove

T and J’s Georges Avenue headquarters in Brookfield is a few minutes from the village, so the same crew stays on an Elm Grove addition from footings to final. Neighboring communities run their own permit offices and zoning, so the checks change once you cross the village line.

Brookfield

The City of Brookfield borders most of Elm Grove, and additions there follow city zoning and permits rather than village rules.

Wauwatosa and West Allis

Wauwatosa sits just east across 124th Street, with West Allis to the southeast, each with its own city permit office.

Pewaukee, Delafield, Hartland, Oconomowoc

Pewaukee, Delafield, Hartland and Oconomowoc lie west along I-94 from the Brookfield headquarters, and each applies its own addition rules.

Visit or call

Visit T And J’s Brookfield Headquarters

T and J’s headquarters is at 985 Georges Avenue in Brookfield, off I-94, about 4 miles from Elm Grove. Addition planning starts at your house, since John needs to measure the lot and see where the new roof meets the old one.

T And J All In Remodeling

985 Georges Avenue
Brookfield, WI 53045

Monday to Friday

8:00 AM to 5:00 PM

Saturday

8:00 AM to 5:00 PM

Sunday

Closed

Water emergencies

24/7

Board questions

Answers for Elm Grove Owners Planning an Addition

Call (262) 352-9525 with your address and John can talk through your lot.

Does every Elm Grove addition need Building Board approval?

Yes. The village’s additions guidance says every addition needs Building Board approval before any permit is issued. The Board judges whether the exterior is compatible with neighboring homes in scale, proportion and materials, and its decision is reported in writing. T And J draws to that standard.

The complete package, a digital set plus 14 copies on 11×17 sheets, is due to the Zoning and Planning Administrator by 4:30 PM at least 21 days before a first or third Tuesday meeting. T And J builds that lead time into the schedule from the first visit.

In the RS-1 to RS-4 districts the house must stay 50 feet from the street, 25 feet from the rear line and 20 feet from each side line. T And J checks those distances on your updated survey before design starts.

Most single-family districts cap the building footprint at 20 percent of the lot and all hard surfaces at 30 percent, while RS-4 allows 25 and 40. Driveways and patios count, so the survey totals both before and after.

It can. The village zoning code includes floodway and floodplain fringe overlay districts, and Underwood Creek flooded parts of the village repeatedly until the 2003 to 2007 flood project. John confirms with the village whether your parcel falls in an overlay before an addition or basement is drawn.

Often, if the structure allows. A second floor adds space without adding footprint, which matters on a lot near its coverage cap. An engineer checks the foundation and walls, the house must stay under the 36 foot height limit, and the Board reviews the new elevations.

Generally no. Village homes are on public sanitary sewer, so the Waukesha County septic evaluation for added bedrooms applies to septic properties, not sewered Elm Grove homes. If the sewer lateral is altered, T And J files the village’s lateral disturbance form.

Village code requires work to start within 60 days of the permit and finish within 24 months, with grading and landscaping done within six months after occupancy. A long phased addition is planned around those limits.

Book the walk

Start Your Elm Grove Addition With a Lot Walk

John walks the lot against the village setbacks, looks at how the roofline could tie in, explains the Building Board step and sends one fixed written price. The lot walk is free, and starting requires no deposit.

Elm Grove Addition Request

Requests get a reply from John the same working day.

No deposit  ·  No obligation  ·  Details stay with T And J

Request Your Free Consultation

Three short steps. John replies within 24 hours.

No deposit  ·  No obligation  ·  Your details stay private

T&J All In Remodeling
Free In-Home Estimate

The honest way to
remodel your Kitchen!

Teli and John quote every job themselves and build it start to finish — no subcontractors, no rotating crews. Tell us what you’re planning and we’ll bring a written, itemised estimate.

Quoted and built by the owners — no subcontractors. We’ll bring a written, itemised estimate.

4.9 60+ Google reviews · BBB A+ · Licensed & insured
Recent work01 / 04
4.9Google Rating

“The team is reliable, honest, and operates with integrity.”

Maiyer Thao · Google
Kitchen · Waukesha County