Home Remodeling in Elm Grove, WI

T And J All In Remodeling plans whole-home and multi-room remodels for Elm Grove’s postwar colonials and ranches. Owners Teli and John Karampetsos price every room as one fixed figure and plan anything that touches the exterior around the village Building Board from the first visit.

One fixed price for the whole house · Building Board timing planned in · No deposit to start

4.9 ★

60+ Google reviews

A+

BBB Accredited

30+

Years combined experience

Village house basics

Elm Grove Remodeling: House Age, Exterior Work, Inspections

Before any finish is chosen, three facts about the village frame a whole-home project: the age of the house being opened up, which side of the exterior wall the work falls on, and the inspections booked along the way.

House age

Median year 1962

Survey estimates place 44 percent of village homes in the 1950s and 1960s, so plaster, original wiring and closed kitchens are the usual starting point.

Review line

Inside or outside

Interior rooms go straight to a building permit. New windows, doors or trim on the outside go to the Building Board first.

Inspections

Framing, insulation, final

The village’s inspector checks each stage on a visit requested by 4 PM the day before, and T And J makes those calls.

Postwar rooms

Kitchen, Bath and Basement Remodeling in Elm Grove

Most village houses reach a remodel with a closed kitchen, one or two dated bathrooms and an unfinished lower level. T And J treats those rooms as one job with one crew and one schedule, and the larger rooms each have their own service page.

Kitchen island with a veined quartz countertop, dark cabinetry and glass pendant lights

Postwar kitchen

Kitchen and dining room joined

Usually the anchor of an Elm Grove project, because the postwar kitchen sits behind a wall from the dining room and shares plumbing, circuits and venting with the rest of the house. Before demolition, T and J sets up a stand-in kitchen elsewhere in the house so the family keeps cooking.

Scope

Cabinets to full rebuild

Hidden work

Original wiring and waste lines

Range

$25k to $80k+

Bathroom remodel with a green vanity, brass fixtures and a marble tiled shower with niches

Upstairs and down

Family bath and powder room

An upstairs family bath with a powder room below is the common village pattern. When both are in scope, one is finished before the other is opened, and every wet wall gets a membrane before tile.

Scope

Powder room to family bath

Staging

One bath always working

Range

$6.5k to $55k+

Flooring-installation waukesha-wi

Below grade

Basement living space first

Family rooms, guest bedrooms, baths and bars below grade. In a whole-house job the lower level is often finished first, giving the household somewhere to live while the main floor is open. A bedroom needs egress, and cutting that opening is exterior work in this village.

Scope

Family room to guest suite

Code

7 ft ceilings, egress for bedrooms

Range

$20k to $60k+

Finished whole-house renovation interior in Wisconsin by T&J Remodeling

Main-floor flow

Center-hall layout changes

Opening the kitchen to the dining room, widening a living room doorway or reworking a center hall so the main floor flows. In a two-story colonial that wall often carries the floor above, so the load is confirmed, a beam engineered and the ducts, wiring and pipes inside rerouted.

Walls

Removed, moved or widened

Structure

Beam sized, framing inspected

Result

A main floor that connects

interior-remodel-geotagged

Hidden oak

Original oak, new trim and lighting

Many village houses hide original oak under carpet or later flooring, so what is already there is checked before anything new is ordered. Trim, doors, lighting and paint go in once every rough-in has passed inspection, not before.

Flooring

Oak refinished, LVP, tile

Carpentry

Doors, casing, built-ins

Lighting

Recessed, pendant, sconces

Laminated veneer lumber beam installed as a header over a wide opening between a house and a new addition

Behind the walls

Electrical, plumbing and HVAC updates

A 1950s or 1960s house often reaches its first major remodel with a small panel, galvanized or cast-iron lines and ducts sized for a closed plan. Open walls are the cheapest moment to replace them, each under its own village permit and inspection.

Electrical

Panel, circuits, GFCI and AFCI

Plumbing

Supply, waste and vent

HVAC

Ducts for an opened plan

Real jobs

Photos of Completed T And J Home Remodels

Finished rooms from T And J projects around the county, photographed on completion. These are real jobs, not renderings.

Kitchen and living room

Island kitchen opened to the living area

Main-floor remodel

Brick wall by an open kitchen

Primary bathroom

Green vanity with brass faucets

Lower level

Finished basement with theater seating

Kitchen

Stone backsplash over stained cabinets

The T and J gallery groups finished kitchens, bathrooms and basements by room, so you can compare finishes before the Elm Grove walkthrough.

Room-by-room pricing

Elm Grove Home Remodeling Cost by Room and Scope

Pricing starts room by room, then drops the costs those rooms share: one demolition, one permit set, one flooring run. In an Elm Grove house the extra lines are usually original wiring and waste pipes, and any window or door change adds Board drawings to the scope.

Single room

Single-Room Remodel

$6.5k–$80k+

Shared scope

Two to four rooms

Multi-Room Remodel

Priced per scope

Plus Board review if needed

Whole-House Renovation

Priced at the walkthrough

Rough out the budget first

Enter every room you plan to change and pick a finish level for each. The calculator total gives John a starting point when he walks your Elm Grove house.

Matched millwork

Remodel Finishes That Match Elm Grove's Original Millwork

Choosing flooring, trim, doors and lighting once for every room in scope lets a postwar house read as one design instead of a patchwork of decades. Where original millwork survives, new casing can be matched to it.

Oak Hardwood Flooring

Original oak refinished where it survives, new oak or maple where it does not.

Luxury Vinyl Plank

A waterproof plank for the kitchen, back hall and lower level.

Porcelain Tile

Bath floors, laundry rooms and the side entry.

Interior Doors and Trim

Casing and base matched to the profiles already in the house.

Recessed LED Lighting

Dimmable layouts on circuits added under the electrical permit.

Quartz Surfaces

Kitchen counters, vanity tops and a bar top from one slab family.

Built-In Cabinetry

Mudroom lockers by the back door, media walls in the family room and pantry storage off the kitchen.

Paint Systems

A single palette carried room to room, with washable paint on hall walls and stairwells.

Flooring options side by side

Flooring

Where it suits

Handles water

In a postwar house

Solid hardwood

Living and dining rooms, bedrooms

Low

Often already there, refinish first

Engineered hardwood

Where old oak cannot be matched

Moderate

Real wood where solid is impractical

Luxury vinyl plank

Kitchens, back halls, basements

High

Continuous from kitchen to back hall to lower level

Porcelain tile

Baths, laundry, side entries

Unaffected

Suits heated floors in baths

Carpet

Upstairs bedrooms

Low

Soft underfoot, quiet overhead

Before a new floor is priced, John lifts a corner of the old one, because oak under the carpet changes the plan.

Housing stock

Remodeling Postwar Elm Grove Homes by Era

Elm Grove incorporated in 1955 and filled in quickly. American Community Survey figures put 44.1 percent of homes in the 1950s and 1960s, 20.3 percent before 1950, 18.2 percent in the 1970s and 17.4 percent from 1980 on, and each era reaches a remodel with different problems.

Bathroom remodel with a green vanity, brass fixtures and a marble tiled shower with niches

1970s Colonial or Ranch

18.2 percent of the village. Layouts are closer to modern but still closed, so the usual job is a kitchen opened to the family room, dated baths rebuilt and one floor run through.

DJI_20240607_112545_361-scaled.jpg

Mid-Century Colonial or Ranch

44.1 percent, the core of Elm Grove. A closed kitchen beside the dining room, original circuits and cast-iron waste lines, and often oak under the carpet that is worth refinishing.

Two storey house with new light grey vinyl lap siding and white trim and corners

Post-1980 Build

17.4 percent, including replacement houses on existing lots. Layouts usually work, so finishes and baths are updated in place, and any exterior change still goes before the Board.

Kitchen-Remodeling-Services-Muskego-wi

Pre-1950 Home

20.3 percent, from the village’s early commuter decades and before. These houses bring plaster walls and compact rooms, and any original wiring found once the walls are opened gets replaced in the same phase.

interior-remodel-geotagged

Whole-House Renovation

Every main room done together and phased so the family stays put, with any window or door change submitted to the Board early so it never holds up the interior.

Building Board

Elm Grove Remodeling Permits and Building Board Review

Two questions decide the route: does the work change anything inside the walls, and does it change anything a neighbor can see from outside? A yes to the second adds the Building Board.

The Village of Elm Grove issues remodeling permits through its Zoning and Planning Department, with separate electrical, plumbing and HVAC permits as needed. Window, door, trim and railing changes go to the Building Board, with scaled elevations, cut sheets and color samples due 14 days before a first or third Tuesday meeting, plus the code of conduct sign.

Permit

Opening a wall between rooms

Building permit, sized beam, framing inspection.

Permit

Adding circuits or a larger panel

Electrical permit, inspected at rough-in.

Permit

A sink, toilet or shower drain moved to a new spot

Plumbing permit filed by a licensed plumber.

Board and permit

Replacing or resizing windows

Building Board review with scaled elevations.

Usually none

Paint and refinishing existing floors

Repairs with no structural or exterior change.

Confirm first

Same-spot cabinet or fixture replacement

The village lists kitchen and bath remodels as permit work.

Board first

Our Elm Grove Remodeling Process and Board Timeline

Anything that changes the outside is submitted to the Building Board first, because its meeting calendar sets the earliest start. Inside, structure comes before systems and systems before finishes, with the village inspector signing each layer before it is covered.

Walkthrough at no charge · Board filings prepared · Stages paid as they finish

First visit

Every room and the exterior walked

John walks each room in scope, lifts a corner of flooring, opens the panel, and notes any window, door or trim change that would send the job to the Board.

No charge, at the house

Weeks 1–3

Drawings, selections, one price

Layouts, finishes and room order are settled, elevations are drawn if the exterior changes, and the whole scope gets one written figure.

Nothing paid up front

Before the build

Board, permits and ordering

Board packages go in two weeks before a first or third Tuesday meeting, permits are filed, beams engineered and long-lead items ordered.

Filed by T And J

Construction

Framing, systems, inspections

Walls come out, beams go in, wiring and pipes are renewed, and rough framing and insulation inspections pass before drywall.

One in-house crew

Handover

Finishes and final inspection

Floors, trim, tile and paint are completed room by room, the village final is passed, and Teli and John walk the house with you.

Closed out by an owner

Google reviews

4.9

★★★★★

4.9 average from 60+ Google reviews of T And J remodeling projects across Waukesha County and southeastern Wisconsin.

Nearby

Home Remodeling in Communities Near Elm Grove

T And J’s Georges Avenue headquarters in Brookfield is a few minutes from the village, and the same crew takes on whole-house work on every side of it. The Building Board covers only Elm Grove, so each neighbor below runs its own approval path.

Around the village

Brookfield wraps around Elm Grove, with New Berlin, Menomonee Falls and Muskego beyond. Each issues its own remodeling permits, so the village Board step does not follow you there.

East of 124th Street

Wauwatosa, West Allis, Milwaukee, Greendale and Franklin lie across the county line in Milwaukee County, each with a municipal permit office of its own.

Out along I-94

Pewaukee, Hartland and Oconomowoc to the west, on the same I-94 corridor as T And J’s headquarters.

Visit or call

T And J’s Headquarters Near Elm Grove

T and J’s office sits at 985 Georges Avenue in Brookfield, off I-94, about 4 miles from Elm Grove. Every consultation happens at your house, where John can see the rooms being changed.

T And J All In Remodeling

985 Georges Avenue
Brookfield, WI 53045

Monday to Friday

8:00 AM to 5:00 PM

Saturday

8:00 AM to 5:00 PM

Sunday

Closed

Water emergencies

24/7

Owner questions

Elm Grove Remodeling FAQ

Talk through your own house with John at (262) 352-9525.

How much should I budget to remodel several rooms of an Elm Grove home?

Single rooms run from about $6,500 for a bathroom refresh to $80,000 and up for a full kitchen, and basements start near $20,000. Several rooms, or the whole house, are priced after the walkthrough as one fixed figure, and original wiring and waste lines often move the total.

Yes, in most cases. The village lists kitchen and bath remodels, wall and beam changes, stair work, interior demolition and basement, attic or garage conversions as permit work, while repairs with no structural or exterior change are exempt.

Usually, yes. Replacement windows, doors, trim and railings are exterior alterations for Building Board review, even within the existing footprint. The Board meets the first and third Tuesday at 5:30 p.m. and wants submittals 14 days ahead, so T And J files early.

Permits come from the village Zoning and Planning Department, and the village building inspector handles rough framing, insulation, final and trade inspections. A next-day inspection must be requested by 4:00 p.m., and T And J makes those calls.

Most families do. Many village colonials have a family bath upstairs and a powder room below, so one is kept working while the other is rebuilt. Kitchen downtime is the tougher part, so a stand-in kitchen goes in first and its dates appear in the written schedule.

It can. Downtown Elm Grove flooded repeatedly from Underwood Creek until the 2003 to 2007 flood project added a storage pond and diversion tunnel. John asks about past water on the walkthrough, confirms floodplain status with the village and picks lower-level materials to suit.

Under the village building code, work must start within 60 days of the permit and finish within 24 months. A multi-room remodel fits well inside that, but a house done in stages over several years needs each phase permitted in step with those limits.

One in-house crew builds the job, and Teli or John Karampetsos quotes and oversees every Elm Grove remodel. In Wisconsin the electrical permit goes to a licensed electrical contractor and the plumbing permit to a licensed Master Plumber, so each trade signs for its own work.

Your walkthrough

Book a Whole-House Walkthrough in Elm Grove

John walks every room you want changed, checks what the original walls are hiding, flags anything that needs the Building Board, and sends one fixed written price for the whole house. The visit is free and asks for no deposit.

Your Elm Grove House Details

Expect a reply the same working day.

No deposit  ·  No obligation  ·  Details stay with T And J

Request Your Free Consultation

Three short steps. John replies within 24 hours.

No deposit  ·  No obligation  ·  Your details stay private

T&J All In Remodeling
Free In-Home Estimate

The honest way to
remodel your Kitchen!

Teli and John quote every job themselves and build it start to finish — no subcontractors, no rotating crews. Tell us what you’re planning and we’ll bring a written, itemised estimate.

Quoted and built by the owners — no subcontractors. We’ll bring a written, itemised estimate.

4.9 60+ Google reviews · BBB A+ · Licensed & insured
Recent work01 / 04
4.9Google Rating

“The team is reliable, honest, and operates with integrity.”

Maiyer Thao · Google
Kitchen · Waukesha County