T And J All In Remodeling designs, permits and builds Oconomowoc bathroom remodels: showers added to lake-era rooms that never had one, supply renewed across long runs, clawfoot and period fixtures kept or replaced honestly. Permits filed in the right jurisdiction. Fixed written price.
4.9 ★
59 Google reviews
A+
BBB Accredited
30+
Years combined experience
Oconomowoc at a glance
The bathroom in an Oconomowoc lake-era house was often built for a tub and a basin and nothing else. Adding a proper shower to it means new supply, new waste and a decision about the original fixtures: not a new surround over the old arrangement.
Investment
$12k–$45k+
A careful refresh that keeps period fixtures, through to a rebuild that renews supply back to the riser.
Out of service
1–5 weeks
Large lake-era houses usually have more than one bathroom; the smaller downtown houses often do not, and are sequenced accordingly.
Four jurisdictions
Check before quoting
The City, the Town, the Village of Oconomowoc Lake and the Village of Lac La Belle each permit separately, and an address alone does not decide it.
Our Oconomowoc scope
T And J rebuilds every part of an Oconomowoc bathroom: showers added to tub-only rooms, supply renewed across long runs, period fixtures kept or replaced, pans, vanities, extract, lighting and accessible fit-outs.

Showers
A lake-era Oconomowoc bathroom frequently has no shower at all. Adding one means a new supply branch sized for it, a waste and vent arrangement that suits a pan rather than a tub outlet, and a wall built to carry tile and a valve where there was previously only plaster and a window.
Supply
New branch sized for a shower
Waste
Vented for a pan, not a tub
Wall
Built to carry tile and valve

Pressure
A big house means long pipe runs, and in Oconomowoc those runs are often original galvanised that has closed up from the inside. Pressure at the top floor is measured before anything is specified, because a rain head on a starved riser is a disappointment nobody can fix afterwards.
Measured
Pressure read at the fixture
Renewed
Galvanised replaced back to the riser
Specified
Fittings chosen to the real flow

Period fixtures
A clawfoot tub is worth keeping and worth being honest about. Kept in place it needs a floor that carries it full, a supply and waste arrangement designed for a free-standing tub, and a shower elsewhere in the room rather than a ring and a curtain around it.
Keeping
Floor checked for a full tub
Plumbing
Free-standing supply and waste
Showering
Built separately, not over the tub

Full rebuild
An Oconomowoc bath taken back to framing usually shows plaster on lath over balloon framing, galvanised branches off an old riser, and a floor structure that was never designed for a tiled wet area.
Reach
Lath, studs and subfloor
Systems
Supply, waste, vent, power
Sign-off
Rough-in before board

Accessibility
Where the bedrooms sit at the top of a lake-era staircase, the bathroom worth adapting is on the ground floor. Space usually comes from a rear hall, a pantry or a former service room, all of which are close to the existing stack.
Entry
Flush or low-profile
Blocking
Behind tile for rails
Fittings
Comfort height, handheld, seat

Fit-out
A lake-era bathroom was ventilated by a window and lit by one fixture. Extract is added and ducted to open air, lighting is layered at the mirror and over the pan, and the circuits are brought up to standard with GFCI protection.
Extract
Added and run to open air
Lighting
Layered, wet-rated over the pan
Circuits
GFCI, on its own permit
Finished work
Bathrooms designed, permitted and built by T And J across Oconomowoc: lake-era houses, downtown foursquares and the west-side subdivisions.
Shower added
Tiled shower built into a lake-era bathroom that had only ever had a tub
Supply renewed
Galvanised branches replaced back to the riser to restore pressure upstairs
Clawfoot kept
Original clawfoot tub retained on a reinforced floor with free-standing plumbing
Period fittings
Cross-handle fittings and a high-level cistern kept in a downtown house
Plaster repaired
Lath and plaster opened for new services and skim-coated back
Ground-floor bath
Full bathroom built from a former service room near the stack
Extract added
Ducted fan fitted in a room ventilated only by a window
Tile detail
Hex floor and capped wainscot set in a rebuilt lake-era bathroom
Further Oconomowoc bathrooms, each membraned, tested and signed off before tile.
What it costs
An Oconomowoc bathroom remodel costs $12,000 to $45,000 and up. Adding a shower where none existed sits above a like-for-like rebuild, because supply, waste and the wall itself are all new work rather than replacements.
7 to 10 days
$12k–$18k
Most Oconomowoc jobs
About a month
$20k–$32k
3 to 5 weeks plus review
$45k and up
Price your Oconomowoc bathroom
Enter the room size and finish level, then bring the figure to a free measure at the house.
Surfaces and vanities
Beside original woodwork and plaster the format matters as much as the material, and weight matters more than either on a lake-era floor.
Period-correct on a lake-era floor and light enough for old joists.
Three by six with a capped edge, set to the height the room was built for.
Modern body in a period format. What most renewals here actually use.
Handsome, heavy and porous. Best as a threshold or a window stool.
Scribes cleanly to plaster that was never straight, and needs no sealing.
Bowl cast into the top, useful in a compact guest bathroom.
Metal legs and an open shelf, correct in a lake-era or downtown house.
Where storage matters more than period accuracy, in paint or stain.
Wet-area surfaces compared for Oconomowoc bathrooms
| Surface | Weight on lake-era floors | Period accuracy | Upkeep | Best for in Oconomowoc |
|---|---|---|---|---|
| Hex mosaic 1 in or 2 in | Light | Correct for the era | Seal grout once | Lake-era and downtown floors |
| Subway tile 3 x 6 with cap | Light | Correct at wainscot height | Seal grout once | Walls to the original height |
| Porcelain tile through-body | Moderate | Period format, modern body | Seal grout once | Full renewals throughout |
| Ceramic tile glazed | Light | Closest to original glaze | Seal grout once | Dry walls and surrounds |
| Natural stone marble, slate | Heaviest option | Correct as a threshold | Reseal every 6–12 months | Saddles and window stools |
| Quartz top engineered | Moderate | Modern; scribes to plaster | None | Vanity tops throughout |
| Cultured marble cast | Light | Modern | Polish occasionally | Compact guest bathrooms |
| Console vanity metal legs | Very light | Correct for the era | Wipe down | Small downtown rooms |
Bathroom sizes
Lake-era rooms are often large by the standards of their day and awkwardly shaped by modern ones. What fits is set by the window position and by the route back to the riser.

Generous floor area, no shower. The work is adding one without losing the room’s character.

Compact and square. Tub or walk-in on one wall, basin and toilet opposite.

Built from a service room or rear hall. Placed by the route to the stack.

West-side rooms with space for a separate shower and two basins.

Under 20 square feet. No shower, still ducted properly to open air.
Oconomowoc permits
Yes, once a fixture moves or a circuit is added. A licensed plumber files the plumbing application and rough-in is inspected before board.
Four municipalities share the Oconomowoc name, the City, the Town of Oconomowoc, the Village of Oconomowoc Lake and the Village of Lac La Belle, and each issues its own permits and runs its own inspections. The parcel is checked before a quote is written, because both fees and review times differ. T And J files with the right office and meets the inspector.
Required
Adding a shower to a tub-only room
Plumbing permit; new branch and vent inspected.
Required
Replacing galvanised supply back to the riser
Plumbing permit and rough-in inspection.
Required
Reinforcing a floor for a full tub
Structural; inspected before the floor closes.
Required
Adding a circuit or an extract fan
Electrical permit; GFCI required.
Not required
Regrouting sound original tile
Nothing behind the wall moves.
Not required
Like-for-like vanity replacement
Services stay where they are.
The build
A full Oconomowoc bathroom runs three to five weeks plus review. Pressure is read and the supply is traced in the first days, because that sets what the fittings can realistically be.
Free visit · Drawings prepared · ETRAKiT filing handled
First visit
The room is measured, pressure is read at the existing fixture, and the supply is traced back toward the riser so the fitting specification matches the flow the house can deliver.
No charge, at your house
Weeks 1 to 2
Format, trim height and fittings are chosen to sit correctly against the existing woodwork, with flow rates checked against the measured pressure, and the written quote follows.
No money down
Review time
The plumbing application goes to whichever of the four offices has jurisdiction while fixtures and tile are ordered.
Handled by T And J
Weeks 1 to 3
Plaster is opened and keyed, galvanised branches are replaced, the new shower branch and vent are run, the floor is reinforced where a full tub needs it, and rough-in is signed before board.
In-house crew
Last weeks
The bed is sloped, the membrane bonded and held under water for a full day, then tile is set to the original heights and the room is handed back under written warranty.
Warranty in writing
4.9
4.9 average from 59 Google reviews of T And J projects across Waukesha County.
Where we work
Bathrooms across western Waukesha County and the Lake Country villages, run from the Georges Avenue yard in Brookfield.
Delafield, Hartland, Okauchee and Nashotah.
Wales, Dousman and the Jefferson County line.
Pewaukee, Waukesha, Sussex and Brookfield.
Visit or call
T And J All In Remodeling is based at 985 Georges Avenue in Brookfield, WI, on the I-94 corridor between Milwaukee and Lake Country. Consultations happen in your kitchen.
T And J All In Remodeling
Monday to Friday
8:00 AM to 5:00 PM
Saturday
8:00 AM to 5:00 PM
Sunday
Closed
Water emergencies
24/7
Common questions
Call (262) 352-9525 to talk through a specific Oconomowoc bathroom.
Between $12,000 and $45,000, with most Oconomowoc work in the middle. Twelve to eighteen thousand covers a vanity, pan, taps and floor with sound original tile kept. Twenty to thirty-two thousand covers adding a shower to a tub-only room, tiling walls and floor, and renewing the supply branch. Above forty-five thousand the room goes back to lath and the galvanised is replaced to the riser. The figure is fixed in writing before demolition.
Almost always, and it is the most common request in a lake-era house. It is new work rather than a swap: a supply branch sized for a shower valve, a waste and vent arrangement suited to a pan instead of a tub outlet, and a wall rebuilt to carry tile and a valve where there was plaster and often a window. Where the window is in the only sensible wall, it is either relocated or the layout turns to face it.
Usually the supply, not the main. Original galvanised closes up from the inside over decades, and a long run to a top floor in a large Oconomowoc house loses most of what it started with. Pressure is read at the fixture before anything is specified, because fitting a rain head or a multi-outlet valve to a starved riser produces a shower nobody can fix afterwards. Where the branch is the problem it is replaced back to the riser.
Often yes, and the decision is structural before it is aesthetic. A cast clawfoot filled with water and a person is a concentrated load on a floor that may never have carried it, so the joists are checked and reinforced where needed. Kept, it wants free-standing supply and waste rather than wall fittings, and a shower built separately in the room: a ring and a curtain around a clawfoot is a compromise that satisfies nobody.
Between one and five weeks. A refresh that keeps sound tile closes the room for seven to ten working days. Adding a shower to a tub-only room runs about a month, including the day-long pan test before tile. A studs-out rebuild with supply renewed to the riser runs three to five weeks plus review. Smaller downtown houses with one bathroom are sequenced to keep that window as short as inspections allow.
Whichever one the parcel sits in. The City of Oconomowoc, the Town of Oconomowoc, the Village of Oconomowoc Lake and the Village of Lac La Belle each run their own permits and inspections, and a shared mailing address settles nothing. Fees and review times differ between them, so the jurisdiction is confirmed before a quote is written rather than after the work is sold.
Usually. In a lake-era house the ground floor often has a service room, a rear hall or a pantry sitting close to the existing stack, and that proximity is what decides the location rather than which room is spare. A half bath is straightforward; a compact full bath needs the waste run, a vent and, in an older floor, a check that the structure carries a tiled wet area.
Delafield, Hartland, Okauchee and Nashotah sit around Oconomowoc, with Wales, Dousman and the Jefferson County line west, and Pewaukee, Waukesha, Sussex and Brookfield east. One crew covers all of them from the Brookfield yard.
More services
Get started
The free visit reads the pressure, traces the supply and records the room, then a written price follows for the Oconomowoc bathroom as drawn.
Reply the same working day.
No deposit · No obligation · Details stay with T And J
Request Your Free Consultation
Three short steps. John replies within 24 hours.
No deposit · No obligation · Your details stay private
T&J All In RemodelingTeli and John quote every job themselves and build it start to finish — no subcontractors, no rotating crews. Tell us what you’re planning and we’ll bring a written, itemised estimate.
Quoted and built by the owners — no subcontractors. We’ll bring a written, itemised estimate.
“The team is reliable, honest, and operates with integrity.”
Maiyer Thao · Google