T And J All In Remodeling designs, permits and builds Menomonee Falls bathroom remodels — moulded units stripped out for tiled showers, garden tubs converted, shared hall baths resequenced, pans membraned and tested. Village permits filed. Fixed written price.
4.9 ★
59 Google reviews
A+
BBB Accredited
30+
Years combined experience
Menomonee Falls at a glance
The Menomonee Falls bathroom being remodelled today was almost always installed as a moulded unit: a one-piece fibreglass tub-shower in the hall bath, and a corner garden tub with a separate glassed cubicle in the master. Both were builder specification, and both have reached the end of it.
Investment
$12k–$45k+
A refresh inside the existing footprint through to a rebuild taken back to the studs.
Out of service
1–5 weeks
Village colonials usually carry a hall bath, a master en suite and a powder room, so at least one stays in service throughout.
Moulded units
The usual starting point
One-piece acrylic and fibreglass units cannot be resurfaced indefinitely. Once the base flexes or the seam opens, the honest answer is replacement.
Our Menomonee Falls scope
T And J rebuilds every part of a Menomonee Falls bathroom: moulded unit removal, tiled showers, garden tub conversions, shared and jack-and-jill layouts, vanities, extract, lighting and accessible fit-outs.
Moulded units
A one-piece fibreglass unit was set before the walls went up, so it comes out in cut sections rather than through the door. Behind it is bare stud and, frequently, no waterproofing of any kind. The alcove is rebuilt properly: cement board, a sloped bed and a bonded membrane, tested before tile.
Removal
Cut out in sections
Alcove
Rebuilt to cement board
Waterproofing
Bonded membrane, then tested
Garden tubs
The 1990s master here gives a large corner tub nobody fills and a 32 inch cubicle nobody enjoys. Removing the tub deck releases a footprint wide enough for a single large tiled shower with a bench, and the plumbing is rerouted into the same wet wall rather than across the room.
Footprint
Tub deck released to the shower
Services
Kept on the same wet wall
Result
One large shower, not two fittings
Shared baths
A shared bathroom between two bedrooms works or fails on separation. Wet area behind a door, basins outside it, and a door swing that does not put two people in the same three feet is the difference between a usable layout and a queue every morning.
Separation
Wet area closed off on its own
Basins
Placed outside the wet zone
Doors
Swings planned against traffic
Full rebuild
Taking a Falls bathroom to studs shows what the schedule allowed in 1988: waste at minimum fall, an extract fan terminating in the joist bay, and particleboard subfloor swollen around the flange.
Reach
Studs and subfloor
Systems
Supply, waste, vent, power
Sign-off
Rough-in before board
Accessibility
In a two-storey colonial the bathroom that matters long term is the one on the main floor. A powder room with an adjoining cupboard can usually take a flush-entry shower, blocking behind the tile, and a wider door.
Entry
Flush or low-profile
Blocking
Behind tile for rails
Fittings
Comfort height, handheld, seat
Fit-out
Builder-grade fans in the Falls were sized to the code minimum and ducted the shortest way, often into a joist bay. New extract is sized to the room volume and run to open air, with lighting wet-rated over the pan.
Extract
Sized to volume, run to open air
Lighting
Wet-rated over the pan
Circuits
GFCI, on its own permit
Finished work
Bathrooms designed, permitted and built by T And J across Menomonee Falls — hall baths, master en suites and main-floor powder rooms.
Unit removed
One-piece fibreglass tub-shower cut out and the alcove rebuilt to cement board
Garden tub gone
Corner tub deck removed and replaced with a single large tiled shower
Shared bath resolved
Jack-and-jill layout reworked so the wet area closes off on its own
Bench built in
Tiled bench and niche set into a converted master shower
Powder upgraded
Main-floor half bath rebuilt as a flush-entry full bathroom
Double vanity
Two basins fitted on a quartz top with a drawer bank between
Extract corrected
Fan run taken to open air instead of into a joist bay
Floor renewed
Swollen particleboard replaced and the flange reset to the finished height
Further Menomonee Falls bathrooms, each membraned, tested and signed off before tile.
What it costs
A Menomonee Falls bathroom remodel costs $12,000 to $45,000 and up. Converting a garden tub sits above a straight hall-bath rebuild, because the deck, its framing and the plumbing behind it all come out first.
7 to 10 days
$12k–$18k
Most Falls jobs
About a month
$20k–$32k
3 to 5 weeks plus review
$45k and up
Price your Menomonee Falls bathroom
Enter the room size and finish level, then bring the figure to a free measure at the house.
Surfaces and vanities
Replacing a moulded unit means choosing surfaces for the first time in the life of the house, so the useful comparison is against what is coming out.
Dense body, no flex underfoot, and a proper membrane beneath it. The standard replacement.
Lighter and cheaper on walls above the splash line, not on the pan.
Real veining on a feature wall. Sealed on a schedule most households forget.
Large panels with no grout, the closest thing to a moulded unit that does not flex.
No sealing, no marking from cosmetics. The default vanity top here.
Bowl cast into the top, common in the original build and still serviceable.
Reads correctly in a Falls colonial, in paint or stain.
Lifts the cabinet clear of the floor and suits a flush-entry layout.
Wet-area surfaces compared for Menomonee Falls bathrooms
| Surface | Versus a moulded unit | Use in a wet pan | Upkeep | Best for in Menomonee Falls |
|---|---|---|---|---|
| Porcelain tile through-body | No flex, no seam to open | Yes | Seal grout once | Hall baths and converted masters |
| Ceramic tile glazed | Lighter, softer body | Walls only | Seal grout once | Walls above the splash line |
| Natural stone marble, slate | Warmer, needs sealing | Away from spray | Reseal every 6–12 months | Feature walls in a master |
| Solid surface acrylic | Panels with no grout at all | Yes | Wipe down only | Shared baths and rentals |
| Quartz top engineered | Replaces cultured marble | n/a | None | Vanity tops throughout |
| Cultured marble cast | What the builder fitted | n/a | Polish occasionally | Powder rooms and second baths |
| Acrylic base moulded | Still a fixed size | Yes | Wipe clean | Quick refits on a budget |
| Glass mosaic kiln-formed | Follows a bench or a curve | Yes | Seal grout once | Niches, benches and bands |
Bathroom sizes
Falls rooms were laid out by builders working to a plan book, so footprints repeat street to street. What changes the layout is which fittings come out, not how many feet there are.
The village standard. A 60 inch alcove takes a tub or a tiled walk-in, vanity opposite.
Deck out, cubicle gone, and the whole wall becomes one large tiled shower with a bench.
Two doors, shared wet area. Works only when the wet zone closes off on its own.
Under 20 square feet. The easiest room to turn into a flush-entry full bath.
Set by drain height. Gravity where a stub exists, a sealed pit and pump where it does not.
Menomonee Falls permits
Yes, once a fixture moves or a circuit is added. A licensed plumber files the plumbing application, and rough-in is inspected before board goes on.
Menomonee Falls is an incorporated village with its own inspection department, so Waukesha County is not involved. Removing a garden tub deck usually moves supply and waste as well as framing, which puts it firmly in permitted territory. T And J files, posts the card and meets the inspector.
Required
Removing a garden tub and its deck
Plumbing and framing both inspected.
Required
Relocating a fixture
Plumbing permit and rough-in inspection.
Required
Adding a circuit or a heated floor
Electrical permit; GFCI required.
Required
Reworking a shared bath layout
Framing inspected where walls move.
Not required
Like-for-like vanity replacement
Services stay where they are.
Not required
New tile on a sound surround
Cosmetic work only.
The build
A full Menomonee Falls bathroom runs three to five weeks plus village review. Removing a moulded unit is the first day, and what is behind it decides the rest of week one.
Free visit · Drawings prepared · ETRAKiT filing handled
First visit
The room is measured, the moulded unit is checked at the base and seam, and the subfloor around the flange is probed so the rebuild is priced against what is actually there.
No charge, at your house
Weeks 1 to 2
Tile, glass, vanity and trim are chosen in one sitting, the bench and niche positions are drawn, and the written quote follows.
No money down
Review time
The plumbing application goes to the village while fixtures and glass are ordered, so the two run side by side.
Handled by T And J
Weeks 1 to 3
The unit or tub deck is cut out, the alcove is rebuilt to cement board, services are renewed, the extract is run to open air, and rough-in is signed before board.
In-house crew
Last weeks
The bed is sloped, the membrane bonded and held under water for a full day, then tile, glass and fit-out follow and the room is handed back under written warranty.
Warranty in writing
4.9
4.9 average from 59 Google reviews of T And J projects across Waukesha County.
Where we work
Bathrooms across northern Waukesha County and the Milwaukee County line, run from the Georges Avenue yard in Brookfield.
Sussex, Lannon, Butler and Germantown.
Brookfield, Elm Grove and Wauwatosa.
Pewaukee, Waukesha and Hartland.
Visit or call
T And J All In Remodeling is based at 985 Georges Avenue in Brookfield, WI, on the I-94 corridor between Milwaukee and Lake Country. Consultations happen in your kitchen.
T And J All In Remodeling
Monday to Friday
8:00 AM to 5:00 PM
Saturday
8:00 AM to 5:00 PM
Sunday
Closed
Water emergencies
24/7
Common questions
Call (262) 352-9525 to talk through a specific Menomonee Falls bathroom.
Between $12,000 and $45,000, with most Falls work in the middle. Twelve to eighteen thousand covers a vanity, pan, taps and floor inside the existing footprint. Twenty to thirty-two thousand covers the moulded unit out, a tiled shower with bench and niche in, and the extract corrected. Above forty-five thousand the room goes back to studs or the garden tub deck comes out. The figure is fixed in writing before demolition.
Yes, and it is the most common request here. The unit was set before the walls were framed, so it is cut out in sections rather than walked through the door. Behind it there is usually bare stud and no waterproofing at all. The alcove is rebuilt to cement board with a sloped bed and a bonded membrane, held under water for a full day, and only then tiled.
In most Falls masters, yes. A corner garden tub takes up the best part of a wall, needs far more hot water than a household will run, and sits beside a 32 inch cubicle that is genuinely unpleasant to use. Removing the deck releases a footprint wide enough for one large tiled shower with a bench, and the supply and waste stay on the same wet wall rather than crossing the room.
By separating the wet area from the basins. Two doors into one room only works when the bath or shower and the toilet close off behind their own door, with the basins outside that zone and reachable from either side. Door swings are planned so two people are never in the same three feet. Where the footprint will not allow it, the honest advice is one door and a proper hall bath.
Between one and five weeks. A refresh inside the existing footprint closes the room for seven to ten working days. A rebuild replacing a moulded unit runs about a month, including the day-long pan test before tile. Studs-out work or a garden tub conversion runs three to five weeks plus village review. Most Falls colonials keep a second bathroom in service throughout.
Yes. Menomonee Falls is an incorporated village with its own inspection department, so permits and inspections are handled there and Waukesha County is not involved. A licensed plumber files the plumbing application. Removing a garden tub deck moves supply, waste and framing together, so it is inspected at rough-in like any structural plumbing work.
Often, and in a two-storey colonial it is the bathroom worth future-proofing. A main-floor powder room already has supply, waste and a vent. Depth for a shower usually comes from an adjoining cupboard or the hall wall behind it. With a flush entry, a widened door and blocking behind the tile, it becomes the bathroom that still works when the stairs stop being an option.
Sussex, Lannon, Butler and Germantown sit around Menomonee Falls, with Brookfield, Elm Grove and Wauwatosa south, and Pewaukee, Waukesha and Hartland west. One crew covers all of them from the Brookfield yard.
More services
Get started
The free visit records the room, the state of the moulded unit and the subfloor beneath it, then a written price follows for the Menomonee Falls bathroom as drawn.
Reply the same working day.
No deposit · No obligation · Details stay with T And J
Request Your Free Consultation
Three short steps. John replies within 24 hours.
No deposit · No obligation · Your details stay private
T&J All In Remodeling
Teli and John quote every job themselves and build it start to finish — no subcontractors, no rotating crews. Tell us what you’re planning and we’ll bring a written, itemised estimate.
Quoted and built by the owners — no subcontractors. We’ll bring a written, itemised estimate.
“The team is reliable, honest, and operates with integrity.”
Maiyer Thao · Google