Menomonee Falls Basements, Dried Out and Finished to Code

T And J All In Remodeling finishes basements across the Village of Menomonee Falls, starting with the question the August 2025 storm left behind: where the water got in, and how to keep it out. Owners Teli and John Karampetsos then file the village permit, book each inspection a day ahead and hold one written price.

Water source found first · Inspections booked a day ahead · One written price

4.9 ★

59 Google reviews

A+

BBB Accredited

30+

Years combined experience

Storm and inspections

Cost, Inspections and the August 2025 Rain in the Falls

Before any layout is drawn, three figures frame a lower level in the Falls: what the finish is likely to cost, how many village inspections it passes through, and how much rain the August 2025 storm dropped on the village, which is why water gets settled first.

Budget range

$20k–$60k+

An open recreation room starts near $20,000. Adding a bathroom, a wet bar or a bedroom with an egress window carries the figure toward and past $60,000.

Village inspections

3

Rough framing, electrical and plumbing in one visit, then insulation before drywall, then a final. Each one needs at least 24 hours notice.

August 2025 rain

12.05 in

National Weather Service total at Menomonee Falls for the August 9 to 10, 2025 storm, when the Menomonee River crested at record levels.

Falls projects

Rooms That Suit a Long Falls Ranch Basement

Most basement calls from Menomonee Falls come down to one of the six projects below. Each is framed on treated bottom plates, insulated with no vapor barrier laid over the masonry, and drawn on the plans the village reviews before a single stud goes up.

Flooring-installation waukesha-wi

Whole lower level

The full level on treated plates

A full finish in a Falls ranch or colonial turns bare block or poured walls into heated living space. Foam insulation goes against the concrete, stud walls sit on treated plates, new circuits feed lighting and outlets, and drywall, trim and flooring follow. The furnace, water heater and sump crock stay reachable, and their locations go on the village plan.

Walls

Foam board, treated bottom plates

Ceiling

Drywall or suspended, shown on plans

Floor

LVP, tile or carpet on a dry slab

Finished basement home theater with leather recliners and recessed lighting

Rec space

A screen at one end, a game table at the other

A long, open basement under a Falls ranch can hold a screen wall at one end and a game table at the other. Speaker, HDMI and network cable is pulled before drywall, recessed lights go on dimmers, and the equipment gets a circuit of its own.

Cabling

Speaker, HDMI and data

Lighting

Recessed LED on dimmers

Layout

Screen, seats and cue room

Finished two-story home addition in Waukesha County, Wisconsin by T&J Remodeling

Guest room

Lower-level bedrooms with legal egress

A bedroom below grade needs an egress window with a clear opening of at least 20 by 24 inches, or an exterior door, plus interconnected smoke and carbon monoxide alarms and a 7 foot ceiling. The village wants those alarm positions drawn on the plan, so T And J marks them before filing.

Egress

Opening cut, window and well set

Alarms

Smoke and CO, shown on plan

Headroom

7 ft finished ceiling

Finished basement bathroom with glass shower and white vanity

Plumbing

Gravity drain or ejector pump

How a basement bathroom drains depends on the depth of the sewer line leaving the house. Below the slab, the floor is cut and new lines run by gravity; above it, an ejector pump lifts waste to the main. In a house that saw a sewer backup in 2025 or 2026, John reviews the floor drain and lateral with you before any fixture is placed.

Drain

Gravity tie-in or ejector

Shower

Membrane behind tile

Exhaust

Fan ducted outdoors

basement remodeling waukesha

Hosting

Bars with the least slab cutting

A bar placed near the existing stack and supply needs the least slab cutting, so its spot is settled on the plan along with any circuit for a fridge or ice maker. Cabinets, a stone top and task lighting then go in exactly as they would in a kitchen upstairs.

Water

Near the existing stack

Power

Fridge and ice maker circuit

Counter

Quartz or granite

Basement Remodeling-Waukesha

Utility

A sump you can still reach

Shelving, closets and a finished stair turn leftover square footage into something useful. The sump crock, furnace and water heater keep open service space behind a door, because a pump nobody can reach after a storm is a problem of its own.

Built-ins

Shelving and closets

Stair

Treads, rail, lighting

Service

Sump and furnace reachable

Completed rooms

Photographed at Completion, Not Rendered

These are T And J basements from across Waukesha County, photographed on completion rather than rendered. The in-house crew that works in Menomonee Falls built every one of them.

Theater room

Recliner rows beneath a dark painted ceiling

Games

Pool table set with clear cue space

Accent wall

Stacked stone lit by wall sconces

Bar

Galley bar, light wood and dark counters

Screen room

Projector screen over recliners and recessed lights

More finished lower levels, bathrooms and kitchens from around the county sit in the gallery.

Cost

Budgeting a Falls Basement After Two Wet Seasons

Square footage sets the starting figure for a Falls basement, and plumbing and egress add the most on top. After the 2025 and 2026 storms, some houses also need water work first, such as a new sump pump, drain tile or regrading, which shows as its own line. Everything lands in one fixed written price.

Open finish

Rec Level

From $20k

Most asked for

Finish plus a bathroom

Everyday Level

$20k–$60k

Bedroom, bath and egress

Guest Level

$60k+

Run the numbers first

Multiply your basement’s square footage by the guide’s per-foot ranges, then compare that with John’s figure once he has seen the walls and the sump.

Village-reviewed layers

Materials That Recover If Water Comes Back

Village plan review bars a vapor barrier over insulation on masonry walls and calls for treated bottom plates. After two wet seasons, every material below is also judged on how it recovers if water returns.

Rigid Foam Board

Goes straight onto block or poured walls, with no poly sheet over it.

Closed-Cell Spray Foam

Seals rim joists and rough block where boards cannot sit flat.

Moisture-Resistant Drywall

Mold-resistant panels for bath, bar and laundry walls.

Suspended Drop Ceiling

Lift-out tiles keep valves, cleanouts and wiring within reach.

Luxury Vinyl Plank

A waterproof core, the sensible default for basement living areas.

Porcelain Tile

Shrugs off standing water in baths, bars and laundry corners.

Carpet and Pad

Warm in bedrooms and theaters, but only where the slab stays dry.

Egress Window Wells

Galvanized or composite wells sized to each new egress opening.

Floor options compared

Floor type

If water returns

Comfort

Good for

Vinyl plank

Waterproof core

Firm, mildly warm

Family and rec rooms

Porcelain

No harm from water

Cool unless heated

Baths, bars, laundry

Carpet on pad

Usually replaced

Soft, warm

Bedrooms, theaters

Engineered wood

Limited; dry slab only

Real wood feel

Dry rooms with vapor control

Coated concrete

High

Hard, cool

Gyms, shops, storage

Solid hardwood stays off a below-grade slab. After August 2025, soaked flooring sat at Falls curbs for weeks, so plank or tile is the safer choice near the sump and the floor drain.

After annexation

What Six Annexations Built Above Falls Basements

Six annexations beginning in October 1958 turned a village of roughly two square miles into one of about 32, and the building that followed shaped the basements T And J sees today. Census estimates put about 35 percent of Falls housing in the 1950s and 1960s, roughly 17 percent in the 1970s and 1980s, about 42 percent from 1990 on, and under 6 percent before 1950.

Flooring-installation waukesha-wi

Before 1950

Under 6 percent of homes: the old village along the river, plus Hiawatha Heights, begun in 1938 as Wisconsin’s first FHA-approved subdivision. Expect low headroom and older foundation walls.

Finished basement home theater with leather recliners and recessed lighting

1950s and 1960s

About 35 percent. After US 41 opened in 1953, 101 subdivisions were platted in the 1950s alone. Ranches and split-levels, where headroom under ducts and beams is the first measurement.

basement remodeling waukesha

1970s and 1980s

Roughly 17 percent, built in a slower stretch when the village population dipped. Wall type varies, so the sump and floor drain get checked before framing.

Finished two-story home addition in Waukesha County, Wisconsin by T&J Remodeling

1990 and Newer

About 42 percent, including some 3,000 single family lots across 70 subdivisions platted in the 1990s and 2000s. Often the simplest to finish, if drainage held in 2025.

Finished basement bathroom with glass shower and white vanity

What Age Tells John

The build decade hints at wall type, headroom and where the sewer leaves the house. None of that replaces a look: John checks the walls, the sump and the ceiling height in person before a price is written.

Pilgrim Road filing

Does Menomonee Falls Require a Permit to Finish a Basement?

Yes. The village states that kitchen, bathroom and lower level remodels need a building permit, and that one is required whenever drywall comes off or a room, window or door changes size. Electrical, plumbing and HVAC permits are added as the scope requires.

Permits are issued by the Village of Menomonee Falls at Village Hall, W156 N8480 Pilgrim Road, to contractors holding a Wisconsin Dwelling Contractor Certification and Dwelling Contractor Qualifier Certification. For a lower level, the plans must give room dimensions and uses, the ceiling finish, and the positions of the furnace, water heater, sump crock, smoke alarms and carbon monoxide detectors. The village asks for 7 to 10 days once an application is complete. Field inspections are contracted to SAFEbuilt LLC under an arrangement dating to 1985: rough, insulation and final, each requested by the general contractor at least 24 hours ahead and carried out between 9 a.m. and 4 p.m. Village sewage is treated by MMSD; if a house is on a private septic system instead, Waukesha County requires a Preliminary Site Evaluation before a bedroom is added.

Permit

Framing rooms or removing drywall

Building permit; rough, insulation, final.

Permit

New circuits, lights and outlets

Electrical permit, inspected at rough-in.

Permit

Bathroom, bar or ejector pump

Plumbing permit, inspected at rough-in.

Permit

Enlarging a window for egress

Building permit; the window size changes.

Final only

New sump pump or radon fan

The village lists a final inspection only.

Usually none

Paint or flooring, walls left intact

No drywall removed, no sizes changed.

Inspection order

Three Inspections, Each Booked a Day Ahead

An 800 to 1,000 square foot basement runs about six to ten weeks from permit approval to final inspection, and a bathroom adds two to three weeks. In the Falls each inspection is requested a day ahead, so an open wall is not left waiting for a slot.

Water checked · Price fixed · Inspections booked ahead

Week 0

Walkthrough and water history

John measures the basement, reads walls and slab for moisture, finds the sump crock and floor drain, and asks what happened in August 2025.

Free, at the house

Weeks 1–2

Plan drawn, price fixed

Rooms, egress, alarm locations and ceiling finish go on a plan the village can review, with one written price.

No deposit

Before build

Village permit filed

T And J submits the building, electrical and plumbing applications at Village Hall, then orders windows and fixtures during the review.

Filed by T And J

Build

Rough-in, insulation, two inspections

Framing and rough-ins pass the first SAFEbuilt visit, insulation passes the second, and only then does drywall go up.

One in-house crew

Final stage

Finishes and final inspection

Paint, trim, flooring and fixtures go in, SAFEbuilt completes the final, and Teli and John walk the finished level with you.

Owners sign off

Google reviews

4.9

★★★★★

4.9 average from 59 Google reviews of T And J remodeling projects across Waukesha County and southeastern Wisconsin.

River corridor

Up and Down the Menomonee River Corridor

The T And J shop in Brookfield sits just south of the village, and the same crew works along the Menomonee River corridor and across northern Waukesha County into Milwaukee County.

Menomonee River

Germantown upstream and Wauwatosa downstream sit on the same river that crested at record levels in August 2025, so their basements get the same water-first walkthrough.

Waukesha County

Lannon, Sussex, Butler and Brookfield, where the same county radon test kits and septic evaluation rule apply as in the Falls.

Milwaukee County

Milwaukee and West Allis, where each city runs its own permits and the Waukesha County services above do not apply.

Visit or call

Where Is T And J Located?

Walkthroughs happen in your Menomonee Falls basement. The T And J office and shop are at 985 Georges Avenue in Brookfield, off I-94 and south of the village.

T And J All In Remodeling

985 Georges Avenue
Brookfield, WI 53045

Monday to Friday

8:00 AM to 5:00 PM

Saturday

8:00 AM to 5:00 PM

Sunday

Closed

Water emergencies

24/7

After the storm

Falls Owners Ask, John Answers

A different question about your basement? Call John at (262) 352-9525.

What does finishing a basement in Menomonee Falls usually cost?

Most Falls basements land between about $20,000 for an open recreation room and $60,000 or more for a level with a bathroom, bar and egress bedroom. Square footage sets the base; plumbing and egress add the most. Any water correction the house needs is priced inside the same fixed written figure.

Often, once the water question is answered. John looks at how it came in, whether through the walls, the floor drain or rising river water, and the fix goes in before framing. If the space is still wet, T And J’s 24/7 water damage crew dries it first.

The village contracts field inspections to SAFEbuilt LLC, formerly Independent Inspections, and has since 1985, while permits still come from Village Hall on Pilgrim Road. Inspections need at least 24 hours notice and run from 9 a.m. to 4 p.m. The general contractor places the requests, so T And J books each one.

Because the pump has to stay serviceable once the room is finished. The village asks lower-level plans to show the furnace, water heater, sump crock, smoke alarms and CO detectors. T And J keeps the crock behind an access panel or in the mechanical room, never buried under flooring.

Usually, if it can meet code. The room needs an egress window with at least a 20 by 24 inch clear opening, or an exterior door, a 7 foot finished ceiling, and interconnected smoke and CO alarms. In older ranches, ducts and beams decide whether that height is reachable, which John measures on the first visit.

Sanitary backups were reported in parts of the Falls in both August 2025 and April 2026. MMSD funds a Private Property Infiltration and Inflow program through the village aimed at cutting basement backups, and Village Hall can explain it. On the walkthrough John notes the floor drain and lateral so the layout leaves room for any protection a plumber recommends.

Yes. Wisconsin DHS estimates about 1 in 10 homes in the state has high radon and uses 4 pCi/L as the action level, and Waukesha County Environmental Health sells test kits. A radon fan in the village needs a final inspection, and its pipe is far easier to hide before drywall.

Plan on about six to ten weeks from permit approval to final inspection for an 800 to 1,000 square foot basement, or ten to twelve for a fuller build-out, plus the village’s 7 to 10 day permit review before work begins.

Water first

Find the Water, Then Finish the Falls Basement

John checks where water has come in, measures the headroom, notes the sump and drains, and follows up with a fixed written price for your Menomonee Falls basement. The visit is free and there is no deposit.

When Was Your House Built?

Tell John the year your house was built.

No deposit  ·  No obligation  ·  Details stay with T And J

Request Your Free Consultation

Three short steps. John replies within 24 hours.

No deposit  ·  No obligation  ·  Your details stay private

T&J All In Remodeling
Free In-Home Estimate

The honest way to
remodel your Kitchen!

Teli and John quote every job themselves and build it start to finish — no subcontractors, no rotating crews. Tell us what you’re planning and we’ll bring a written, itemised estimate.

Quoted and built by the owners — no subcontractors. We’ll bring a written, itemised estimate.

4.9 59 Google reviews · BBB A+ · Licensed & insured
Recent work01 / 04
4.9Google Rating

“The team is reliable, honest, and operates with integrity.”

Maiyer Thao · Google
Kitchen · Waukesha County