Brookfield at a glance
A Brookfield basement finish is planned around three things, the budget band, the ceiling height the space can keep and how long the build runs, and T and J measures all three at the free walkthrough.
Investment
$20k–$60k+
Open recreation space sits at the bottom of the range. Adding a bath, bar or bedroom suite lifts the cost, driven mainly by drain work and the egress opening.
Habitable ceiling
7 ft
Seven feet from finished floor to finished ceiling is the Uniform Dwelling Code minimum for living space, with some allowance under beams and ducts.
Build time
3 to 6 weeks
Most Brookfield finishes take three to six weeks on site once permits are issued, with a bathroom or egress window adding time.
Basement finishing services
T and J finishes Brookfield basements as complete living levels or room by room, from family and media rooms to bedrooms with egress, bathrooms, wet bars and built-in storage, with moisture control first, an inspection between each layer and one fixed price for all of it.

Full finish
Complete basement finishing turns a bare Brookfield lower level into heated living space in one project. T and J insulates the walls with rigid or closed-cell foam, frames them off the concrete, adds lighting circuits, drywall, trim and flooring, and keeps the mechanical room reachable behind a door.
Walls
Foam board, framed off the concrete
Ceiling
Drywall or a lift-out grid
Floor
Vinyl plank, carpet or tile on a subfloor

Recreation
T and J builds Brookfield basement family, media and game rooms around how they will be used. Media rooms are prewired for speakers, HDMI and network with dimmable recessed lights, and game rooms are laid out to real clearances, such as the cue space a pool table needs.
Wiring
Speakers, HDMI, network
Lighting
Dimmable recessed LED
Layout
Seating and table clearances

Sleeping room
A Brookfield basement room counts as a legal bedroom once it has an egress window, interconnected smoke and CO alarms and code headroom. T and J saws the foundation for the window and well, frames the room around them and books the inspection, so the bedroom adds usable, listable space.
Egress
Foundation opening and well installed
Alarms
Interconnected smoke and CO
Result
Legal bedroom, inspected

Plumbing
T and J adds full and half bathrooms to Brookfield basements as part of the finish, placed where the drain can reach so the layout and price are set at the walkthrough. Showers get a waterproofed pan and walls, and a ducted fan keeps moisture out of the finished rooms.
Layout
Placed where the drain reaches
Shower
Waterproofed pan and walls
Venting
Ducted exhaust to exterior

Entertaining
A basement wet bar or kitchenette from T and J is placed near existing plumbing during design, then fitted with cabinets, quartz or granite counters, a sink and lighting like a small kitchen, with its own circuit for a beverage fridge or dishwasher.
Plumbing
Sink supply and drain
Power
Beverage fridge, dishwasher
Surfaces
Quartz or granite counters

Function
T and J finishes the parts that make a Brookfield basement work day to day, from built-in storage and closets to a refinished staircase with code headroom, a rail and lighting, and a mechanical room that keeps service clearance around the furnace, water heater and panel.
Storage
Built-ins, closets, shelving
Stairs
Treads, handrail, lighting
Mechanicals
Service clearance kept open
Finished work
Photographs of finished T and J basements, not renderings, each framed, wired and inspected before the finishes went on.
Media room
Stepped theater seating below an open black ceiling
Game room
Billiards room sized for a full cue stroke
Feature wall
Lit stacked-stone feature wall
Wet bar
Wood bar cabinets under a dark counter
Family room
Bright family room with recessed lights
See more lower levels, baths and kitchens in the T and J gallery.
What it costs
Finishing a basement in Brookfield typically costs $20,000 to $60,000 and up: $20,000 to $40,000 for an open recreation room, $40,000 to $60,000 for a living level with a bathroom or wet bar, and $60,000 or more for a lower-level suite with a bedroom and egress window.
Open finish
$20k–$40k
Most requested
Finish plus plumbing
$40k–$60k
Plus permits and egress
$60k+
Price your basement first
Use the basement cost-per-square-foot guide for a first number, then bring it to the free Brookfield walkthrough.
Walls and floors
Closed-cell foam, moisture-resistant drywall and waterproof-core vinyl plank belong in a Brookfield basement, because below-grade walls stay cold and slabs can carry moisture vapor.
Closed-cell boards on the concrete that will not soak up water.
Seals rim joists and irregular block walls against air leaks.
Mold-resistant board where baths, bars and laundry add humidity.
Lift-out panels that leave pipes, valves and wiring reachable.
Rigid planks that shrug off spills, the default for basement living space.
The pick for baths, wet bars and laundry, where floors see water.
Warm and quiet for bedrooms and media rooms over a dry slab.
Steel or composite, sized to the opening it serves.
Basement flooring compared
Flooring
Water tolerance
Feel underfoot
Best fit
Luxury vinyl plank
Waterproof core
Firm, slightly warm
Most basement living areas
Porcelain tile
Unaffected by water
Cold without heat
Bathrooms, bars, laundry
Carpet over pad
Poor if flooded
Soft and warm
Bedrooms and media rooms
Engineered wood
Moderate, only on a dry slab
Warm, real wood
Dry slabs with a vapor barrier
Sealed or coated concrete
High
Hard and cool
Gyms, workshops, storage
Skip solid hardwood below grade. Where the slab reads damp, a vapor barrier or raised subfloor panels go down first.
Home eras
Most Brookfield basements are postwar. About 41.5 percent of homes were built from 1970 to 1999 and 40.5 percent from 1940 to 1969, so full-footprint basements worth finishing are the norm and pre-war stone foundations are rare.

40.5 percent of Brookfield. Expect concrete block, close to seven feet of clearance, and a furnace or water heater mid-floor that may need relocating.

The largest group at 41.5 percent: poured concrete, generous ceilings and frequently a capped bathroom rough-in in the slab.

Built since 2000, about 15.5 percent of Brookfield homes, with tall pours, deep footings and often a builder-installed egress window.

Just 2.5 percent. Rare in Brookfield, and where they exist they need the most moisture work and have the lowest headroom.

Wall construction drives the moisture and insulation plan, while headroom decides soffits versus a drop ceiling, and both are measured at the walkthrough.
Brookfield permits
Yes. The City of Brookfield lists rec rooms among projects needing a building and an electrical permit, plus a plumbing permit when a bath or bar goes in. Inspection Services is at (262) 796-6646.
Wisconsin’s Uniform Dwelling Code, SPS 320 to 325, governs the work, with plumbing under SPS 382 to 384. For a bedroom, the egress opening must give 5.7 square feet net clear, measure at least 24 inches high and 20 wide, and sit with its sill no higher than 44 inches. T and J pulls each permit and schedules inspections while walls are still open.
Permit
New walls and rooms framed
Building permit with framing and insulation checks.
Permit
Added circuits, lights and outlets
Electrical permit; wiring checked open.
Permit
A basement bath or wet bar
Plumbing permit; pipes checked before cover.
Permit
Cutting an egress window
Building permit; opening inspected before the well.
Usually none
Paint or a sealed floor
Finish work only.
Usually none
New flooring in an already finished room
Nothing structural or mechanical changes.
The build
Five stages finish a Brookfield basement, and each inspection passes before the next layer covers it. Start dates depend mostly on permit review and material lead times.
No-cost walkthrough · One written price · Permits pulled by T and J
Week 0
John measures the space, checks walls and slab for moisture, notes beam and duct heights and finds where plumbing can drain.
Free, at your house
Weeks 1–2
Rooms, egress, bath location and finishes are drawn up and priced as one written number.
No deposit to start
Lead time
Building, electrical and plumbing permits are filed, and windows and fixtures ordered, before demolition.
Permits filed for you
Build
Insulation and framing go in first, then wiring, plumbing and ducts, and the inspector approves it all before drywall.
Inspected before drywall
Final stage
Drywall, paint, trim, floors and fixtures go in, final inspections pass, and Teli and John tour the finished basement with you.
Owner sign-off
4.9
Across basements, kitchens and baths, T and J holds a 4.9 average from more than 60 Google reviews.
Where we work
With its headquarters on Georges Avenue, T and J calls Brookfield its home city and finishes basements across Southeastern Wisconsin on the same daily schedule.
In Brookfield, New Berlin, Pewaukee, Sussex and Elm Grove, many 1970s to 1990s homes have full-height poured basements that fit a bedroom and bath.
In Milwaukee, Wauwatosa and West Allis, older block or stone foundations often need moisture work and have lower ceilings.
In Oconomowoc, Hartland and Delafield, walkout basements on sloped lots add daylight and an outside door.
Visit or call
T and J All In Remodeling works out of 985 Georges Avenue in Brookfield, close to Calhoun Road, and John walks every Brookfield basement before pricing it.
T And J All In Remodeling
Monday to Friday
8:00 AM to 5:00 PM
Saturday
8:00 AM to 5:00 PM
Sunday
Closed
Water emergencies
24/7
Common questions
Questions about a Brookfield basement? Call (262) 352-9525.
Finishing a basement is usually worth it when the space is dry and has the headroom for living space, because the foundation, walls and roof already exist, so each finished square foot costs far less than an addition. T and J checks both at the free Brookfield walkthrough and fixes any water issue first, since a finish over a damp slab will not last.
Plumbing is usually the most expensive part of finishing a basement, followed by the egress window a bedroom needs. Cutting the slab for a bathroom drain or setting an ejector pit, and sawing the foundation for a window, often cost more than the drywall, trim and flooring combined, so T and J prices both before any wall is framed.
Most basement finishes take three to six weeks of construction once permits are issued, and a bathroom, wet bar or egress window adds time for the extra inspections. T and J files the Brookfield permits and orders windows and fixtures before demolition, so the crew works straight through framing, rough-in and finishes.
Yes, any water problem is fixed before a basement is finished. T and J checks the walls and slab for moisture at the walkthrough, the source is corrected first by regrading soil, extending downspouts, sealing cracks or adding interior drain tile and a sump where needed, and the walls are then insulated with foam that will not absorb water.
Yes. The Wisconsin Department of Health Services recommends radon testing in every home, and a finish is the easiest time to route a mitigation pipe if levels come back high, so T and J plans the layout around your result before drywall closes the walls.
Usually, yes. Finished living space raises a home’s assessed value, and in Brookfield the City or Town assessor sets the new amount after the work, so it is worth budgeting for alongside the finish itself.
More services
Get started
John walks your Brookfield basement, tests it for moisture, measures ceiling heights and sends one fixed written price. The visit costs nothing, and no deposit is taken.
John replies the same working day.
No deposit · No obligation · Details stay with T and J
Request Your Free Consultation
Three short steps. John replies within 24 hours.
No deposit · No obligation · Your details stay private
T&J All In RemodelingTeli and John quote every job themselves and build it start to finish — no subcontractors, no rotating crews. Tell us what you’re planning and we’ll bring a written, itemised estimate.
Quoted and built by the owners — no subcontractors. We’ll bring a written, itemised estimate.
“The team is reliable, honest, and operates with integrity.”
Maiyer Thao · Google