T And J All In Remodeling designs, permits and builds Merton bathroom remodels: primary suites enlarged into the space next door, with the wet wall economics worked out first and pans held under test. Village permits filed. Fixed written price.
4.9 ★
59 Google reviews
A+
BBB Accredited
30+
Years combined experience
Merton at a glance
Merton houses built from the 1990s onward are generous everywhere except the primary bathroom, which usually sits beside an oversized wardrobe or a bonus room nobody uses. Taking space from next door is the most common request here.
Investment
$15k–$60k+
A refresh inside the existing footprint through to a rebuild that takes in the room next door.
Out of service
1–6 weeks
Houses here carry two or three bathrooms, so one stays in service throughout.
Wet wall
Where the cost sits
Fixtures kept near the existing stack cost a fraction of fixtures moved across a room. That single fact shapes every enlargement.
Our Merton scope
T And J rebuilds every part of a Merton bathroom: suite enlargements, wet wall planning, showers and pans, cabinetry, tile, extract and lighting.
Enlarging
An oversized wardrobe, a bonus room over the garage or a spare bedroom corner is usually where a Merton primary bathroom grows into. The wall between is rarely load-bearing, so the work is framing, services and finishes rather than structure: and the wardrobe that is lost gets rebuilt inside the new plan.
Source
Wardrobe, bonus room or corner
Wall
Usually non-bearing
Trade-off
Storage rebuilt in the new plan
Wet wall
Moving a toilet ten feet across a new bathroom means a new waste run with proper fall, a vent tied back, and often opening the floor below. Keeping the pan and the shower on or near the original wet wall, and spending the new space on the vanity and the tub instead, gets a better room for considerably less.
Near the stack
Toilet and shower stay put
New space
Spent on vanity and tub
Moved fixtures
Priced as their own line
Storage
Enlarging into a wardrobe solves the bathroom and creates a storage problem. A run of fitted cabinetry along the new wall, a linen tower beside the vanity, and a dressing area within the bathroom itself usually give back more than was lost, provided it is planned at the same time rather than afterwards.
Fitted run
Along the new wall
Linen tower
Full height beside the vanity
Dressing
Planned into the room, not bolted on
Full rebuild
Stripping a Merton bathroom to studs shows what the builder allowed: a fan ducted into a joist bay, a vent at the minimum, and a corner garden tub plumbed as an afterthought.
Reach
Studs and subfloor
Systems
Supply, waste, vent, power
Sign-off
Rough-in before board
Showers
Most Merton primary bathrooms have a corner tub nobody fills and a small cubicle nobody enjoys. Removing the tub deck releases enough width for one large tiled shower with a bench, and the plumbing stays on the same wet wall rather than crossing the room.
Footprint
Tub deck released to the shower
Services
Kept on the same wet wall
Result
One good shower, not two compromises
Fit-out
An enlarged bathroom needs its extract resized to the new volume rather than keeping the fan that suited the old room. Lighting is zoned across vanity, shower and dressing area, and every circuit is GFCI protected.
Extract
Resized to the new volume
Lighting
Zoned across the new plan
Circuits
GFCI, on its own permit
Finished work
Bathrooms designed, permitted and built by T And J across Merton: the village and the acreage between Highway 83 and the lakes.
Suite enlarged
Primary bathroom taken into an oversized adjoining wardrobe
Wet wall kept
Toilet and shower left on the original wet wall to control cost
Garden tub gone
Corner tub deck removed for one large tiled shower with a bench
Storage rebuilt
Fitted run and linen tower replacing the wardrobe that was absorbed
Dressing area
Dressing space planned inside the new bathroom footprint
Extract resized
Fan resized to the enlarged room and ducted to open air
Lighting zoned
Vanity, shower and dressing areas lit on separate circuits
Bonus room used
Bathroom extended into unused space over the garage
Further Merton bathrooms, each membraned, tested and signed off before tile.
What it costs
A Merton bathroom remodel costs $15,000 to $60,000 and up. What moves the figure is not floor area but how far the fixtures travel from the existing wet wall, which is why the layout is settled before the finishes are.
7 to 10 days
$15k–$20k
Most Merton jobs
About a month
$25k–$40k
4 to 6 weeks plus review
$60k and up
Price your Merton bathroom
Enter the room size and finish level, then bring the figure to a free measure at the house.
Surfaces and vanities
In an enlarged room the runs get longer, so how a surface behaves across distance matters as much as how it looks on a sample.
Large format with few joints across a long floor. The default here.
Movement that suits a big room. Reseal on a schedule.
Hard-wearing and bright where the room takes real daily use.
Formed surrounds with no grout, useful across a wide shower.
Never sealed, and holds a long vanity run in one or two pieces.
Built to the new wall, replacing the wardrobe the bathroom absorbed.
Full height beside the vanity, which is where the lost storage goes.
Worth fitting across a larger floor while the bed is being laid anyway.
Surfaces and storage compared for enlarged Merton bathrooms
| Surface | Distance from the stack | Cost impact | Upkeep | Best for in Merton |
|---|---|---|---|---|
| Fixtures kept in place same wet wall | None | Lowest | Standard | Most enlargements |
| Vanity moved supply only | Short run | Low | Standard | Almost always worth it |
| Shower relocated new waste and vent | Moderate | Medium | Standard | Where the layout demands it |
| Toilet relocated new waste and vent | Longest run | Highest | Standard | Only when nothing else works |
| Garden tub removed deck and framing out | Same wet wall | Moderate | Standard | Nearly every primary suite |
| Fitted cabinetry new wall | n/a | Medium | Wipe down | Replacing an absorbed wardrobe |
| Linen tower full height | n/a | Low | Wipe down | Beside the vanity |
| Heated floor in the bed | n/a | Low while open | None | Any enlarged floor |
Bathroom sizes
Merton houses have the space. What decides the plan is how far the fixtures have to move from the existing stack to use it.
Corner tub, small cubicle, double vanity. Everything on one wet wall.
Wall taken out into a wardrobe or bonus room. Vanity and tub get the new space.
Straightforward 5 by 8. Tub or a tiled walk-in with a single vanity.
Over the garage, so insulation and a long waste run both matter.
Under 20 square feet. Still needs a properly ducted fan.
Merton permits
Yes, once plumbing moves or circuits are added. The Village of Merton issues the permits; properties outside permit through the Town of Merton.
Taking a wall out between a bathroom and the room next door is framing work and is inspected before board, and relocating a toilet or a shower needs the new waste and vent signed off at rough-in. T And J confirms the jurisdiction, files and meets each inspector.
Required
Opening a wall into the room next door
Framing inspected before board.
Required
Relocating a toilet or shower
New waste and vent inspected at rough-in.
Required
Removing a garden tub and its deck
Plumbing and framing both inspected.
Required
Adding a circuit or a heated floor
Electrical permit; GFCI required.
Not required
Like-for-like vanity replacement
Services stay where they are.
Not required
New tile on a sound surround
Cosmetic work only.
The build
A full Merton bathroom runs four to six weeks plus review. Where a wall is coming out, the framing and its inspection lead everything else.
Free visit · Drawings prepared · ETRAKiT filing handled
First visit
The bathroom and the space next door are measured together, and the stack is located from below, because the distance from it sets what the enlargement will actually cost.
No charge, at your house
Weeks 1 to 2
Fixture positions are settled against the wet wall before finishes are chosen, and the quote issued afterwards is the number the job is built to.
No money down
Review time
The application goes to whichever office has jurisdiction while cabinetry and glass are ordered.
Handled by T And J
Weeks 1 to 4
Both rooms come apart, the wall is removed and framed, services are run to the new positions, and rough-in is signed before board.
In-house crew
Last weeks
The bed is sloped, the membrane bonded and held under water for a full day, then tile, cabinetry and fit-out follow and the room is handed back under written warranty.
Warranty in writing
4.9
4.9 average from 59 Google reviews of T And J projects across Waukesha County.
Where we work
Bathrooms across northern and western Waukesha County, run from the Georges Avenue yard in Brookfield.
Hartland, Sussex, Lannon and Chenequa.
Nashotah, Delafield, Okauchee and Oconomowoc.
Pewaukee, Waukesha and Brookfield.
Visit or call
T And J All In Remodeling is based at 985 Georges Avenue in Brookfield, WI, on the I-94 corridor between Milwaukee and Lake Country. Consultations happen in your kitchen.
T And J All In Remodeling
Monday to Friday
8:00 AM to 5:00 PM
Saturday
8:00 AM to 5:00 PM
Sunday
Closed
Water emergencies
24/7
Common questions
Call (262) 352-9525 to talk through a specific Merton bathroom.
Between $15,000 and $60,000. A refresh runs $15,000 to $20,000. A rebuild with the garden tub out, one large tiled shower in and fixtures kept on the existing wet wall runs $25,000 to $40,000. Opening the wall into the room next door and relocating fixtures starts around $60,000. What moves the figure is fixture travel, not floor area. Fixed in writing before demolition.
In most Merton houses, yes. The wall between a primary bathroom and an adjoining wardrobe or bonus room is rarely load-bearing, so it comes out with framing rather than structure. That is checked from the attic and the basement at the free visit. The wardrobe that disappears gets rebuilt as fitted cabinetry inside the new bathroom, so the storage is not simply lost.
Because a toilet needs a three or four inch waste with continuous fall back to the stack, plus a vent. Ten feet across a room means opening the floor, running the new line within the joist depth without cutting anything you should not, and often working from the ceiling below. Keeping the pan on the original wet wall and spending the new space on the vanity and the tub gets a better room for far less.
Into the bathroom, planned at the same time rather than afterwards. A fitted run along the new wall, a full-height linen tower beside the vanity and a proper dressing area inside the room usually give back more usable storage than the wardrobe held: because a wardrobe is mostly hanging space, and what the household actually needed was shelving and drawers.
One to six weeks. A refresh closes the room for seven to ten working days. A rebuild with the garden tub out runs about a month, including the full day the pan sits under test. Opening the wall and relocating fixtures runs four to six weeks plus review. Houses here carry two or three bathrooms, so the household is never without one.
In most Merton primary bathrooms, yes. A corner tub takes the best part of a wall, needs more hot water than a household will run, and sits beside a cubicle that is genuinely unpleasant. Removing the deck releases enough width for one large tiled shower with a bench, and the plumbing stays on the same wet wall instead of crossing the room.
Usually not, but it is checked rather than assumed. Joist direction from the basement and the attic tells you what the wall is carrying. Where it is non-bearing, the work is framing, services and finishes. Where it does carry load, a beam sized to the span replaces it with the point loads taken down to a footing: which is a different budget and is priced as its own line.
Hartland, Sussex, Lannon and Chenequa sit around Merton, with Nashotah, Delafield, Okauchee and Oconomowoc west, and Pewaukee, Waukesha and Brookfield south. One crew covers all of them from the Brookfield yard.
More services
Get started
The free visit measures both rooms and locates the stack before anything is drawn, then a written price follows for the Merton bathroom as drawn.
Reply the same working day.
No deposit · No obligation · Details stay with T And J
Request Your Free Consultation
Three short steps. John replies within 24 hours.
No deposit · No obligation · Your details stay private
T&J All In Remodeling
Teli and John quote every job themselves and build it start to finish — no subcontractors, no rotating crews. Tell us what you’re planning and we’ll bring a written, itemised estimate.
Quoted and built by the owners — no subcontractors. We’ll bring a written, itemised estimate.
“The team is reliable, honest, and operates with integrity.”
Maiyer Thao · Google