T And J All In Remodeling designs, permits and builds Wauwatosa bathroom remodels — cast-iron stacks assessed before layout, original tile matched or replaced honestly, cast tubs cut out through prewar stairs, pans membraned and tested. Permits filed. Fixed written price.
4.9 ★
59 Google reviews
A+
BBB Accredited
30+
Years combined experience
Wauwatosa at a glance
Most Wauwatosa bathrooms being remodelled are the original one — a 1920s or 1930s room with hex floor tile, a four-inch wall tile wainscot, a cast-iron tub and a cast-iron stack behind the wall. What that stack looks like decides how far the job goes.
Investment
$12k–$45k+
A careful refresh that keeps original tile, through to a rebuild that renews the stack behind it.
Out of service
1–5 weeks
A prewar Tosa bungalow or Tudor often has one full bathroom, so the sequence is built around the shortest possible closure.
Cast-iron stack
Common here
Original waste stacks are still in service across Tosa. Sound ones stay; scaled or weeping ones are replaced while the wall is open.
Our Wauwatosa scope
T And J rebuilds every part of a Wauwatosa bathroom: stack assessment and replacement, tile matched or renewed, cast tub removal, showers and pans, vanities, extract, lighting and second-bathroom additions.
Stacks
The original cast-iron stack in a Wauwatosa house is either sound or it is not, and the answer changes the whole job. A scope from the cleanout shows scale, cracking at the hub and weeping at the joints. Sound iron is left in place and tied into with the correct coupling; failing iron is cut out and replaced in PVC while the wall is open.
Assessment
Scoped from the cleanout
Sound iron
Kept and coupled correctly
Failed iron
Cut out while the wall is open
Original tile
Hex floor tile and a four-inch wainscot are worth keeping where they are sound, and honest to replace where they are not. Matching new to old rarely convinces at close range, so the choice offered is a full renewal in a period-correct format rather than a patch that will always read as a patch.
Keep
Where the bed is still sound
Renew
Period-correct hex and subway
No pretending
Patches are not sold as matches
Removals
A cast-iron tub weighs upward of three hundred pounds and will not come down a 1920s Tosa staircase in one piece. It is cut in the room under sheeting, carried out in sections, and the stair, newel and floor below are protected before any of it starts.
Method
Cut in place under sheeting
Protection
Stair and newel wrapped first
Removal
Carried out in sections
Full rebuild
A Tosa bath taken back to studs shows the whole prewar picture at once: galvanised branches off an iron stack, a fan vented nowhere, mud-set tile on wire lath, and a floor that has moved around the flange.
Reach
Studs, subfloor and stack
Systems
Supply, waste, vent, power
Sign-off
Rough-in before board
Second bath
Where a Tosa house still has a single bathroom, the second one usually comes from a back bedroom corner, a stair landing or the space above a rear entry. It is located by where waste can reach the stack, not by which room is least used.
Location
Set by the route to the stack
Footprint
Half bath or a compact full
Framing
Inspected where walls move
Fit-out
Prewar Tosa baths were built with an openable window and no fan at all. A ducted extract is added and run to open air, lighting is wet-rated over the pan, and every receptacle lands on a GFCI protected circuit.
Extract
Added and run to open air
Lighting
Wet-rated over the pan
Circuits
GFCI, on its own permit
Finished work
Bathrooms designed, permitted and built by T And J across Wauwatosa — prewar bungalows, Tudors and the postwar streets north of the village.
Stack renewed
Failing cast-iron waste stack replaced while the bathroom wall was open
Hex renewed
Original hex floor replaced in a period-correct format rather than patched
Cast tub out
Cast-iron tub cut in place and carried out through a 1920s stair
Second bath added
New bathroom fitted off a back bedroom on the existing stack
Wainscot rebuilt
Four-inch wall tile reinstated to the original height with a capped edge
Walk-in shower
Tiled walk-in built into the footprint of the old tub alcove
Extract added
Ducted fan run to open air in a bath that never had one
Tile detail
Niche and pencil trim set into a rebuilt prewar surround
Further Wauwatosa bathrooms, each membraned, tested and signed off before tile.
What it costs
A Wauwatosa bathroom remodel costs $12,000 to $45,000 and up. The cast-iron stack is what moves a job between bands: sound iron keeps the work cosmetic, failing iron makes it structural.
7 to 10 days
$12k–$18k
Most Wauwatosa jobs
About a month
$20k–$32k
3 to 5 weeks plus review
$45k and up
Price your Wauwatosa bathroom
Enter the room size and finish level, then bring the figure to a free measure at the house.
Surfaces and vanities
In a prewar room the surface has to sit right beside original millwork and plaster, so format and edge detail matter as much as the material itself.
One-inch or two-inch hexagon on a sheet. The period-correct floor, and still the best underfoot.
Three by six with a bullnose cap, set to the original wainscot height.
Modern body in a period format. What most Tosa renewals actually use.
Marble thresholds and saddles read correctly. Sealed on a schedule.
Takes a scribed back edge against plaster that is never straight.
Cast with the bowl in place, useful in a compact second bathroom.
Metal legs and an open shelf, correct for a 1920s or 1930s room.
The practical alternative where storage beats period accuracy.
Wet-area surfaces compared for Wauwatosa bathrooms
| Surface | Period accuracy | Use in a wet pan | Upkeep | Best for in Wauwatosa |
|---|---|---|---|---|
| Hex mosaic 1 in or 2 in | Correct for 1920s floors | Yes | Seal grout once | Prewar bathroom floors |
| Subway tile 3 x 6 with cap | Correct at wainscot height | Yes | Seal grout once | Wall tile to the original line |
| Porcelain tile through-body | Period format, modern body | Yes | Seal grout once | Full renewals throughout |
| Ceramic tile glazed | Closest to original glaze | Walls only | Seal grout once | Dry walls and wainscot |
| Marble saddle natural stone | Correct at the doorway | Threshold only | Reseal yearly | Thresholds and window stools |
| Quartz top engineered | Modern, scribes to plaster | n/a | None | Vanity tops throughout |
| Cultured marble cast | Modern | n/a | Polish occasionally | Compact second bathrooms |
| Console vanity metal legs | Correct for the era | n/a | Wipe down | Small prewar rooms |
Bathroom sizes
Prewar Tosa rooms are small and squarely built. What fits is set by the stack position and by the window, which in a 1920s bath is usually in the wall you most want to tile.
Common in a bungalow. A tub alcove or a walk-in, a compact vanity, nothing more.
The Tosa standard. Tub on the short wall, basin and toilet opposite.
Found in the Tudors and the larger Highlands houses. Room for a separate shower.
Located by the route to the stack. Often a half bath or a compact full.
Sloped ceiling over the fixtures, and a long waste run back to the stack.
Wauwatosa permits
Yes, once a fixture moves, a stack is altered or a circuit is added. A licensed plumber files the plumbing application and rough-in is inspected before board.
Wauwatosa is a city in Milwaukee County and runs its own building inspection department. Replacing a cast-iron stack is permitted plumbing work, not a repair, and it is inspected before the wall closes. T And J files, posts the card and meets the inspector rather than leaving it with the homeowner.
Required
Replacing a cast-iron waste stack
Plumbing permit; inspected before board.
Required
Relocating a fixture
Plumbing permit and rough-in inspection.
Required
Adding a second bathroom
Plumbing and framing both inspected.
Required
Adding a circuit or an extract fan
Electrical permit; GFCI required.
Not required
Regrouting sound original tile
Nothing behind the wall moves.
Not required
Like-for-like vanity replacement
Services stay where they are.
The build
A full Wauwatosa bathroom runs three to five weeks plus review. The stack is scoped in the first days, because that single answer sets the scope and the price band for everything after it.
Free visit · Drawings prepared · ETRAKiT filing handled
First visit
The room is measured, the waste stack is scoped from the cleanout, and the original tile bed is sounded so the keep-or-renew decision is made on evidence rather than on appearance.
No charge, at your house
Weeks 1 to 2
Format, trim height and fittings are chosen to sit correctly against the existing millwork, and the written quote follows with the stack decision already made.
No money down
Review time
The plumbing application goes to the city while fixtures and tile are ordered, so the two run alongside each other.
Handled by T And J
Weeks 1 to 3
The stair is protected, the cast tub is cut out in sections, galvanised branches and any failing iron are replaced, and rough-in is signed before board goes on.
In-house crew
Last weeks
The bed is sloped, the membrane bonded and held under water for a full day, then tile is set to the original wainscot height and the room is handed back under written warranty.
Warranty in writing
4.9
4.9 average from 59 Google reviews of T And J projects across Waukesha County.
Where we work
Bathrooms across the Milwaukee County suburbs and over the Waukesha County line, run from the Georges Avenue yard in Brookfield.
Milwaukee, West Allis and Elm Grove.
Brookfield, New Berlin and Waukesha.
Greenfield, Greendale and Franklin.
Visit or call
T And J All In Remodeling is based at 985 Georges Avenue in Brookfield, WI, on the I-94 corridor between Milwaukee and Lake Country. Consultations happen in your kitchen.
T And J All In Remodeling
Monday to Friday
8:00 AM to 5:00 PM
Saturday
8:00 AM to 5:00 PM
Sunday
Closed
Water emergencies
24/7
Common questions
Call (262) 352-9525 to talk through a specific Wauwatosa bathroom.
Between $12,000 and $45,000, with most Wauwatosa work in the middle. Twelve to eighteen thousand covers a vanity, pan, taps and floor with sound original tile kept and regrouted. Twenty to thirty-two thousand covers the cast tub out, a tiled walk-in in, hex and wainscot renewed and galvanised branches replaced. Above forty-five thousand the stack is replaced or a second bathroom is added. The figure is fixed in writing before demolition.
Not automatically. Cast iron installed in the 1920s often has decades left in it. It is scoped from the cleanout: light scale and sound hubs mean it stays and is tied into with the correct coupling. Cracking at a hub, weeping at a joint or heavy internal scale means it comes out while the wall is open, because reaching it again later costs the bathroom a second time.
Sound original hex can be kept and regrouted, and it usually looks better than anything sold today. Where the mud bed has failed or the field is broken up, it is replaced in a period-correct format rather than patched. New tile will not match eighty-year-old glaze at close range, so a patch is never presented as a match — the honest choice is keep the whole floor or renew the whole floor.
In pieces. A cast-iron tub weighs over three hundred pounds and will not turn on a 1920s stair. It is scored and broken in the room under sheeting, with ear protection and the stair, newel post and floor below wrapped first, then carried out in sections. The alternative — walking it out whole — damages plaster, trim and backs, so it is not offered.
Between one and five weeks. A refresh that keeps sound tile closes the room for seven to ten working days. A rebuild with a tiled walk-in runs about a month, including the day-long pan test. Replacing the stack or adding a second bathroom runs three to five weeks plus review. Where the house has one bathroom, the sequence is planned to shorten that window as far as the inspections allow.
Usually yes, and it is the change that most improves a prewar Tosa house. The location is decided by the route to the existing stack rather than by which room is least used — a back bedroom corner, a stair landing or the space over a rear entry are the common answers. A half bath needs little; a compact full bath needs the waste run and a vent, both permitted and inspected.
Because it was built with an openable window instead. That satisfied the standard of the day and does nothing in a Wisconsin January, which is why prewar Tosa bathrooms show paint failure and plaster staining above the tile line. A ducted extract sized to the room volume and run to open air — not into the attic or a joist bay — is added as part of any rebuild.
Milwaukee, West Allis and Elm Grove border Wauwatosa, with Brookfield, New Berlin and Waukesha west, and Greenfield, Greendale and Franklin south. One crew covers all of them from the Brookfield yard.
More services
Get started
The free visit scopes the stack, sounds the original tile and records the room, then a written price follows for the Wauwatosa bathroom as drawn.
Reply the same working day.
No deposit · No obligation · Details stay with T And J
Request Your Free Consultation
Three short steps. John replies within 24 hours.
No deposit · No obligation · Your details stay private
T&J All In Remodeling
Teli and John quote every job themselves and build it start to finish — no subcontractors, no rotating crews. Tell us what you’re planning and we’ll bring a written, itemised estimate.
Quoted and built by the owners — no subcontractors. We’ll bring a written, itemised estimate.
“The team is reliable, honest, and operates with integrity.”
Maiyer Thao · Google