T And J All In Remodeling finishes Hartland basements, from older homes on the village streets along the Bark River to the newer subdivisions: moisture read first, permits filed with the right office, and one written price from owners Teli and John Karampetsos.
Village or town permit sorted · Moisture read first · No deposit
4.9 ★
59 Google reviews
A+
BBB Accredited
30+
Years combined experience
Hartland by decade
Before a layout is drawn, three figures frame most Hartland conversations: the budget band T And J works in, how much of the village was built from 1970 on, and the penalty the village applies when work starts ahead of the permit.
Budget band
$20k–$60k+
About $20,000 buys an open rec room. A bathroom, wet bar or bedroom with egress pushes toward $60,000 and beyond, mostly through plumbing and foundation work.
Built 1970 or later
85%
Roughly 85 percent of village housing units went up from 1970 onward, per Census estimates, so most lower levels date from the subdivision decades.
Starting early
2× fee
The Village of Hartland doubles the total permit fee when work begins before a permit is issued, emergencies aside. T And J files first, then the crew starts.
Foundation inward
Whatever the room becomes, the job starts at the foundation and works inward: water control, then foam and framing, then electrical, plumbing and duct rough-ins, and the surfaces last. One in-house crew carries that sequence under one written price.
Start to finish
In a Hartland ranch from the 1970s or a newer two-story off Merton Avenue, the order is the same: foam insulation on the foundation, studs held off the concrete, new circuits and lighting, then drywall, trim and flooring. The furnace, water heater and sump stay reachable behind a door.
Walls
Foam board, studs off the concrete
Ceiling
Drywall, or tiles at valves
Floor
Vinyl plank, carpet or tile
Rec space
A screening room is cabled before board goes up: speaker, HDMI and network runs to the screen wall, recessed lights on dimmers, and a circuit reserved for the equipment. For a pool table, the room is sized to the table so every shot has cue room.
Cabling
Speaker, HDMI and data
Lighting
Recessed LED on dimmers
Layout
Cue and seating space
Guest room
A basement bedroom needs a code egress window or exterior door, interconnected smoke and CO alarms, and 7 feet of ceiling. The new opening changes the outside of the house, so T And J confirms with the Village of Hartland what it needs beyond the building permit before the layout is fixed.
Egress
Foundation cut, window and well set
Alarms
Linked smoke and CO
Exterior
Village review checked first
Second bath
Homes inside the village drain to municipal sewer treated at the Del-Hart plant in Delafield, and the depth of the house lateral decides how a lower-level bath drains. Where it leaves below the slab, the floor is saw-cut and fixtures fall by gravity; where it leaves higher, an ejector pit or up-flush unit lifts the waste. The fan vents outdoors.
Drainage
Gravity tie-in or ejector pit
Shower
Membraned pan and walls
Exhaust
Fan run to open air
Entertaining
Placing the bar sink close to the existing stack and supply keeps the plumbing short, so its spot is settled at the planning stage along with any circuit for a beverage fridge or dishwasher. Cabinetry, tops and under-cabinet lights go in to the same standard as a T And J kitchen.
Water
Near the existing stack
Power
Fridge and ice maker circuits
Tops
Quartz or granite slab
Order
Closets, shelving and under-stair storage turn clutter into order. Stairs in older village-core houses near the Bark River can be steep and short on headroom, so treads, handrail and lighting are brought up to code, and the furnace, water heater and panel keep their clearances.
Storage
Closets and under-stair space
Stairs
Treads, rail and light
Mechanicals
Furnace and panel clearances
Project photos
Photos of finished T And J basements from jobs around Waukesha County, not renderings. The same in-house crew that comes to Hartland built each one.
Theater
Recliner rows beneath a dark painted ceiling
Billiards
Pool table given clear cue room all around
Stone wall
Stacked stone accent wall lit by sconces
Bar
Galley wet bar, light wood and dark tops
Screen room
Projection screen over recliners and recessed lights
The gallery holds more T And J basements, plus bathrooms and kitchens, from around the county.
Rec room to suite
A Hartland lower level starts around $20,000 as an open rec room and reaches $60,000 or more as a full suite. Square footage sets the base. Plumbing and a new egress opening are the big steps, and a basement with a history of seepage may need drainage work before framing. Every figure is fixed in writing.
Entry level
From $20k
Most chosen
Finish with plumbing added
$20k–$60k
Bedroom, bath and egress
$60k+
Run your square footage
Put your basement’s square footage through the per-square-foot guide and bring the figure to John’s Hartland walkthrough.
Layer by layer
Foundation walls stay cool all year and slabs can pass vapor, so in a Hartland basement every layer is picked for how it copes with damp before how it looks.
Closed-cell panels on the foundation that will not wick moisture.
Seals rim joists and rough block or stone in one coat.
Mold-resistant panels at the bath, bar and laundry.
Lift-out panels over shutoffs, cleanouts and junction boxes.
Waterproof core planks for rec rooms and family space.
Shrugs off water in baths, bars and laundry corners.
Soft underfoot in bedrooms and screening rooms once the slab is dry.
Steel or composite wells matched to the new opening.
Floors compared below grade
Floor
Water
Comfort
Use it in
Vinyl plank
Waterproof core
Firm, mildly warm
Rec and family rooms
Porcelain
Water has no effect
Cold without heat
Baths, bars, laundry
Carpet and pad
Fails if soaked
Soft, warm
Bedrooms, screening rooms
Engineered wood
Fair on a dry slab
Warm, true wood
Dry rooms with vapor barrier
Coated concrete
Very high
Hard, cool
Gym, shop, storage
Solid hardwood is left off below-grade slabs. Where John’s moisture reading on a Hartland slab comes back damp, a vapor barrier or subfloor panel goes down first.
Mill town to suburb
Hartland began as a mill settlement on the Bark River, where a grain mill went up in 1842, and incorporated as a village in 1892. Its population more than doubled between 1970 and 1980, and Census estimates for 2019 to 2023 place 30 percent of village housing in that decade alone. Each era hands a finishing project a different starting point.
About 4 percent of village housing. Victorians and farmhouses in the old core near the Bark River, which may sit on stone or early concrete, with low headroom and moisture to manage first.
About 11 percent. Ranches and capes filling the blocks around the village center, many from the 1950s, when the population grew by 75 percent. Block walls and duct runs often decide the layout.
More than half the stock, with 30 percent from the 1970s boom alone. Usually fuller headroom, though original sump and drain setups deserve a close look.
About 28 percent, including subdivisions off Merton Avenue and around Nagawaukee. Taller pours are typical, and some builders already set an egress window.
The decade tells John what the wall is made of, how much headroom the ducts leave and how much water work comes first. He confirms all three in your basement before a price goes on paper.
Cottonwood Avenue
Inside the village, the Department of Building Inspection at Village Hall, 210 Cottonwood Avenue, handles it. Building, electrical, plumbing and HVAC permits are issued separately, and inspections are carried out by the building inspector the village contracts.
Plans submitted to the village must describe the work and meet the Wisconsin Uniform Dwelling Code along with Hartland’s own ordinances. If construction starts before a permit is issued, the village doubles the total fee unless it was an emergency. Homes inside the village are served by municipal sewer through the Del-Hart plant, so the county septic evaluation rarely comes up there. A Hartland mailing address in the Town of Merton is different: permits are filed at Merton Town Hall, and where the home runs on a private septic system, a Waukesha County Preliminary Site Evaluation comes before the remodeling permit. Town of Delafield parcels use that town’s contracted inspector. T And J checks the parcel, then files.
Permit
Framing rooms and partition walls
Village building permit; framing inspected.
Permit
New circuits, lights and outlets
Separate electrical permit, rough-in checked.
Permit
Bathroom, bar sink or ejector pit
Plumbing permit, rough-in inspected.
Permit
Extending ductwork into new rooms
HVAC permit, issued on its own.
Permit + check
Cutting a new egress opening
Building permit; exterior rules checked first.
Usually none
Paint or new flooring only
No framing or systems change.
Stage by stage
Five stages take a Hartland basement from bare concrete to finished rooms, and the village inspector signs off each covered layer before the next goes on. Permit review at Cottonwood Avenue and window lead times usually decide the start more than the build does.
No-cost visit · Written fixed price · Village permits filed
Week 0
John measures the basement, reads walls and slab for moisture, notes duct heights, confirms whether the parcel is village or town, and checks the floodplain map near the river.
Free, on site
Weeks 1–2
Rooms, egress, bath location and finishes are laid out and priced as a single written number.
Nothing due up front
Before work
Permits go to the village Department of Building Inspection, egress questions are settled, and windows and fixtures are ordered.
T And J files it
Build
Moisture control, foam and studs come first, then wiring, plumbing and ducts, each signed off by the inspector before board.
One crew start to finish
Final stage
Board, paint, trim, flooring and fixtures go in, the village final passes, and Teli and John walk the finished space with you.
Closed out by an owner
4.9
4.9 average from 59 Google reviews of T And J remodeling projects across Waukesha County and southeastern Wisconsin.
Up the Bark River
T And J runs one crew out of a Brookfield shop on the I-94 corridor and finishes lower levels up and down the Bark River, across Lake Country and through eastern Waukesha County.
Merton upstream and Delafield downstream, where the river feeds Nagawicka Lake. Homes near the water get a floodplain map check and a moisture reading before any layout.
Nashotah, Chenequa, Okauchee and Oconomowoc, where the parcel’s sewer or septic status is confirmed before a lower-level bedroom is drawn.
Pewaukee, Sussex, Waukesha and Brookfield, the stretch between Hartland and the T And J shop.
Visit or call
T And J All In Remodeling works from 985 Georges Avenue in Brookfield, just off I-94. Hartland basement consultations take place at your house, down in the space being finished.
T And J All In Remodeling
Monday to Friday
8:00 AM to 5:00 PM
Saturday
8:00 AM to 5:00 PM
Sunday
Closed
Water emergencies
24/7
Parcel questions
John takes basement questions at (262) 352-9525.
Hartland addresses cross municipal lines. Inside the Village of Hartland, the Department of Building Inspection on Cottonwood Avenue issues the permits. A parcel in the Town of Merton files at Merton Town Hall instead, and a Town of Delafield parcel goes through that town’s contracted inspector. T And J confirms the parcel before quoting.
Usually, once the water question is settled. In August 2025 the village told residents along the Bark River to watch for rising water when the Merton Millpond dam upstream reached an emergency level. John checks your lot on the FEMA floodplain map, tests walls and slab, and fixes drainage before framing.
T And J basements run from about $20,000 for an open rec room to $60,000 and up for a suite with a bedroom, bath and bar. In a Hartland house, square footage, any drainage work and whether a new egress opening is needed move the figure most. It is fixed in writing.
Often yes, but the county gets involved first. For work that adds bedrooms to a home on a private septic system, Waukesha County requires a Preliminary Site Evaluation, meaning a soil test and tank capacity check, before permits are issued. Homes on village sewer skip it. T And J raises it at the first visit.
A new opening changes the outside of the house, and the village runs an Architectural Board that reviews exterior remodeling. Whether a basement egress window on your elevation needs anything beyond the building permit is confirmed with the village before the layout is fixed, so it cannot stall the job later.
The village doubles the total permit fee when construction begins before a permit is obtained, emergencies excepted. It is an avoidable cost. T And J submits plans and pulls the building, electrical, plumbing and HVAC permits first, and the crew starts only once they are issued.
Yes. Wisconsin DHS estimates high radon in about 1 in 10 homes statewide and uses 4 pCi/L as the action level, and test kits are sold by Waukesha County Environmental Health. Testing before drywall means any mitigation pipe can be routed while the framing is still exposed.
Once the permit is approved, an 800 to 1,000 square foot lower level typically reaches final inspection in 6 to 10 weeks, or 10 to 12 for a fuller build-out. Add 2 to 3 weeks for a bathroom and 1 to 3 for a wet bar.
Upstairs too
Book a visit
John comes out to your Hartland basement, tests it for moisture, measures headroom, confirms village or town jurisdiction and sends back one fixed written price. No deposit and no fee for the visit.
Every request goes to John.
No deposit · No obligation · Details stay with T And J
Request Your Free Consultation
Three short steps. John replies within 24 hours.
No deposit · No obligation · Your details stay private
T&J All In Remodeling
Teli and John quote every job themselves and build it start to finish — no subcontractors, no rotating crews. Tell us what you’re planning and we’ll bring a written, itemised estimate.
Quoted and built by the owners — no subcontractors. We’ll bring a written, itemised estimate.
“The team is reliable, honest, and operates with integrity.”
Maiyer Thao · Google