T And J All In Remodeling designs, permits and builds Okauchee bathroom remodels: lake-side bathrooms detailed for wet feet, sand and swimsuits, with pans membraned and held under test. Town permits filed. Fixed written price.
4.9 ★
59 Google reviews
A+
BBB Accredited
30+
Years combined experience
Okauchee at a glance
A bathroom in an Okauchee lake house does a job no suburban bathroom does. From May to September it takes wet feet, sand, towels and swimsuits straight off the water, and the bathroom nearest the lake door takes almost all of it.
Investment
$12k–$45k+
A refresh inside the existing footprint through to a rebuild that adds a proper lake-side bath.
Out of service
1–5 weeks
Work here is usually scheduled outside the summer, because that is when the house is busiest.
The lake door
Everything comes through it
A bathroom sited between the water and the living space saves the rest of the house from sand and wet feet all summer.
Our Okauchee scope
T And J rebuilds every part of an Okauchee bathroom: lake-side and beach-entry baths, showers and pans, vanities, tile, extract, lighting and accessible fit-outs.
Lake side
The bathroom by the lake door wants a floor that will not be slippery when somebody walks in wet, a drain that copes with sand rather than blocking on it, and a shower you can rinse in without undressing. Everything in it is chosen for wet traffic rather than for a quiet morning routine.
Floor
Rated for wet, barefoot traffic
Drain
Accessible, sand does not block it
Shower
Rinse-down rather than a full enclosure
Storage
A lake house needs somewhere for twelve wet towels, not a single ring on the back of the door. Open shelving dries faster than a closed cupboard, hooks at two heights suit adults and children, and a ventilated cupboard for swimsuits keeps damp fabric out of bedrooms.
Towels
Open shelving, not a closed press
Hooks
Two heights, plenty of them
Swimsuits
Ventilated, drained storage
Privacy
A lake house is glass on the water side, and the bathroom is the one room that cannot be. Obscured or reeded glazing, a high transom, or a window set above head height all bring in daylight without putting anybody on display from a pontoon boat.
Obscured
Reeded or acid-etched glazing
Height
Transom or above-eye-level glass
Outlook
Daylight without the audience
Full rebuild
Stripping an Okauchee bathroom to studs shows a house extended in stages: framing at two depths, floor levels that meet at a threshold, and a bathroom that was a porch corner when the place was still a summer cottage.
Reach
Studs and subfloor
Systems
Supply, waste, vent, power
Sign-off
Rough-in before board
Seasonal
Where a lake house is closed up for part of the year, the bathroom is the room that suffers. Supply lines are kept out of exterior walls, a drain-down point is fitted where the house genuinely gets shut, and traps are specified so they do not dry out and let sewer gas back in.
Lines
Kept off exterior walls
Drain-down
A single point that empties the run
Traps
Specified against drying out
Fit-out
A bathroom that dries twelve towels a day needs extract sized for that, not for one shower a morning. Lighting is wet-rated over the pan, and fittings are chosen to survive being used with wet hands all summer.
Extract
Sized for towels, not one shower
Lighting
Wet-rated over the pan
Circuits
GFCI, on its own permit
Finished work
Bathrooms designed, permitted and built by T And J around Okauchee Lake and the roads leading down to it.
Lake-side bath
Bathroom built between the lake door and the living space
Rinse shower
Rinse-down shower fitted for wet feet straight off the water
Towel wall
Open shelving and hooks at two heights replacing a single towel ring
Suits stored
Ventilated, drained cupboard fitted for wet swimsuits
Privacy glazed
Reeded glazing fitted to bring daylight in without the audience
Levels resolved
Floor levels from staged additions brought to one plane
Drain-down fitted
Single drain-down point added for a house closed up over winter
Extract sized
Fan sized for a room that dries towels rather than for one shower
Further Okauchee bathrooms, each membraned, tested and signed off before tile.
What it costs
An Okauchee bathroom remodel costs $12,000 to $45,000 and up. A lake-side bath built where the wet traffic actually arrives usually saves more in flooring and decoration elsewhere in the house than it costs.
7 to 10 days
$12k–$18k
Most Okauchee jobs
About a month
$20k–$32k
3 to 5 weeks plus review
$45k and up
Price your Okauchee bathroom
Enter the room size and finish level, then bring the figure to a free measure at the house.
Surfaces and vanities
On a lake house the deciding property is grip underfoot when somebody walks in wet and barefoot, not how the tile photographs.
Slip-rated and easy to sweep sand off. The floor of choice by the lake door.
More grout lines means more grip. Good inside a rinse-down area.
Fewer joints and quick to clean, but only where it is textured.
Handsome and genuinely dangerous with wet feet on it. Not used here.
Warm underfoot, no grout, and forgiving of constant wet traffic.
Never sealed, unbothered by sun cream and lake water.
Wet towels dry on it. A closed press just keeps them damp.
Daylight from the water side without a view in from a passing boat.
Surfaces and storage compared for Okauchee lake-side bathrooms
| Surface | Grip with wet feet | Copes with sand | Upkeep | Best for in Okauchee |
|---|---|---|---|---|
| Textured porcelain slip-rated | High | Sweeps clean | Seal grout once | The lake-side floor |
| Small-format mosaic 1–2 in | High | More joints to clean | Seal grout once | Inside a rinse area |
| Large-format porcelain smooth face | Low when wet | Easy to clean | Seal grout once | Dry areas only |
| Polished stone marble, granite | Hazardous | Scratches under grit | Reseal regularly | Not used here |
| Solid surface acrylic | Moderate, warm | Wipes clean | Wipe down only | Rinse-down enclosures |
| Open shelving ventilated | n/a | n/a | Wipe down | Wet towels |
| Closed press cupboard | n/a | n/a | Airs poorly | Not for damp towels |
| Reeded glazing obscured | n/a | n/a | Wipe down | Windows facing the water |
Bathroom sizes
What matters here is where the bathroom sits relative to the water, more than how many square feet it has.
Between the water and the living space. Rinse shower, hooks, hard floor.
The everyday bathroom. Takes a tub or a membraned walk-in.
Away from the wet traffic, so it can be a quieter room entirely.
Used hard by several people at once. Durable specification throughout.
Under 20 square feet. Still needs a floor that copes with wet feet.
Okauchee permits
Yes, once plumbing moves or circuits are added. Okauchee is unincorporated, so permits are filed with the Town of Oconomowoc and inspected by the town.
Lake parcels can also bring shoreland zoning into play where an exterior wall or an opening is altered. T And J checks that before quoting, so the timeline in the price is the real one.
Required
Adding a bathroom by the lake door
Plumbing and framing both inspected.
Required
Relocating a fixture
Plumbing permit and rough-in inspection.
Required
Altering a window on a lake elevation
Shoreland rules checked first.
Required
Adding a circuit or a heated floor
Electrical permit; GFCI required.
Not required
Like-for-like vanity replacement
Services stay where they are.
Not required
New tile on a sound surround
Cosmetic work only.
The build
A full Okauchee bathroom runs three to five weeks plus review, and it is usually scheduled outside the summer because that is when the house is actually being used.
Free visit · Drawings prepared · ETRAKiT filing handled
First visit
The room is measured and the route from the water to the house is walked, because where the wet traffic actually arrives decides which bathroom is worth rebuilding first.
No charge, at your house
Weeks 1 to 2
Floor slip rating, storage, glazing and fittings are chosen for summer use, and the quote issued afterwards is the number the job is built to.
No money down
Review time
The plumbing application goes to the town while fixtures and glass are ordered, with any shoreland question settled alongside.
Handled by T And J
Weeks 1 to 3
The room comes back to studs, floor levels from staged additions are resolved, supply is kept off exterior walls, and rough-in is signed before board.
In-house crew
Last weeks
The bed is sloped, the membrane bonded and held under water for a full day, then tile, storage and fit-out follow and the room is handed back under written warranty.
Warranty in writing
4.9
4.9 average from 59 Google reviews of T And J projects across Waukesha County.
Where we work
Bathrooms around the Lake Country waters and across western Waukesha County, run from the Georges Avenue yard in Brookfield.
Oconomowoc, Nashotah, Chenequa and Merton.
Hartland, Delafield and Pewaukee.
Wales, Dousman and Waukesha.
Visit or call
T And J All In Remodeling is based at 985 Georges Avenue in Brookfield, WI, on the I-94 corridor between Milwaukee and Lake Country. Consultations happen in your kitchen.
T And J All In Remodeling
Monday to Friday
8:00 AM to 5:00 PM
Saturday
8:00 AM to 5:00 PM
Sunday
Closed
Water emergencies
24/7
Common questions
Call (262) 352-9525 to talk through a specific Okauchee bathroom.
Between $12,000 and $45,000. A refresh runs $12,000 to $18,000. A rebuild with a rinse-down shower, a slip-rated floor and proper towel and swimsuit storage runs $20,000 to $32,000. Adding a lake-side bathroom where none exists starts at $45,000. Fixed in writing before demolition.
In most Okauchee houses it pays for itself in what it stops. Sand and lake water going through a living room every day for four months ruins flooring, rugs and furniture far faster than anything else the house endures. A bathroom sited between the water and the living space intercepts all of it, and it is used more heavily than any other room in the house from May to September.
Textured porcelain, and small-format mosaic inside the rinse area where the extra grout lines add grip. What does not work is polished stone or large-format tile with a smooth face: both are genuinely hazardous with wet bare feet, and both hold sand in a way that grinds the finish. The drain is chosen to be lifted and cleared, because sand will find it.
On open shelving and on hooks, not in a closed press. A cupboard full of damp towels stays damp until somebody notices the smell. Open shelving lets air at them, hooks at two heights suit adults and children without a queue, and there should be roughly twice as many as seems reasonable. Swimsuits get their own ventilated, drained spot so they are not dripping through a bedroom.
One to five weeks, and the timing matters more than the duration here. A refresh closes the room for seven to ten working days; a rebuild runs about a month including the full day the pan sits under test. Work is normally scheduled outside the summer, because a lake house with its main bathroom out of action in July is a different problem entirely.
Reeded or acid-etched glazing, a transom above head height, or a window set high in the wall. All three bring the daylight in from the water side without giving anyone on a passing pontoon a view. Clear glass with a blind gets left down all summer and then the room has no daylight at all, which is the outcome worth designing around.
It gets drained, if the house is genuinely shut. Supply lines are kept out of exterior walls where they can freeze, a single drain-down point is fitted so the run empties without crawling under the house, and trap primers or a non-evaporating trap seal stop the traps drying out and letting sewer gas back in. Retrofitting all of that later means opening walls that are already finished.
Oconomowoc, Nashotah, Chenequa and Merton sit around Okauchee, with Hartland, Delafield and Pewaukee east, and Wales, Dousman and Waukesha south. One crew covers all of them from the Brookfield yard.
More services
Get started
The free visit walks the route from the water before anything is drawn, then a written price follows for the Okauchee bathroom as drawn.
Reply the same working day.
No deposit · No obligation · Details stay with T And J
Request Your Free Consultation
Three short steps. John replies within 24 hours.
No deposit · No obligation · Your details stay private
T&J All In Remodeling
Teli and John quote every job themselves and build it start to finish — no subcontractors, no rotating crews. Tell us what you’re planning and we’ll bring a written, itemised estimate.
Quoted and built by the owners — no subcontractors. We’ll bring a written, itemised estimate.
“The team is reliable, honest, and operates with integrity.”
Maiyer Thao · Google