T And J All In Remodeling finishes basements across the Village of Lannon, from masonry lower levels on the old Stone City streets to poured basements in newer homes. Teli and John Karampetsos file every village permit before work starts, schedule the build around the 90 day permit window and fix one written price.
Permit filed before day one · Scheduled to the 90 days · No deposit
4.9 ★
59 Google reviews
A+
BBB Accredited
30+
Years combined experience
Permit calendar
Lannon prints its deadlines on the permit itself, so a basement here is planned against the calendar as much as the budget. The three figures below come from the village permit forms and from T And J’s own pricing and cost guide.
Permit life
90 days
Every Lannon permit expires 90 days from its date unless the form notes otherwise, and fees are not refunded. T And J files once the build is ready to start.
Build time
6–10 wks
T And J’s cost guide puts an 800 to 1,000 sq ft basement at six to ten weeks from approval to final, which fits the permit window. Fuller build-outs run ten to twelve.
Budget band
$20k–$60k+
An open recreation room starts near $20,000. Plumbing, a bedroom egress cut through older masonry, or a full suite carries the figure to $60,000 and beyond.
Second living room
Most Lannon houses are modest in size, so the basement is often where a family finds its second living room, guest room or bathroom. Each space below goes in the same order: water checked, walls insulated and framed, systems roughed in and inspected, then finishes, all by one in-house crew.
Whole level
In a Lannon house the finish starts with what the foundation is made of. Stone and block walls get closed-cell spray foam that follows their uneven face, while poured walls take rigid foam board. Studs stand clear of the concrete, new circuits feed the lighting, and drywall, trim and flooring close the room. The furnace and water meter stay reachable.
Foundation
Spray foam on stone, board on poured
Overhead
Drywall, or lift-out tiles at valves
Slab
Plank, carpet or tile once dry
Gathering space
In a compact village house the basement is often the only room big enough for a sectional, a big screen or a pool table. Speaker, HDMI and network lines go in before drywall, recessed lights sit on dimmers, the equipment gets its own circuit, and a pool table is placed by measuring cue room first.
Cabling
Speaker, HDMI, network drops
Lights
Recessed LEDs on dimmers
Space
Table and seating measured first
Guest room
A lower-level bedroom needs an egress window with a clear opening of at least 20 by 24 inches and a well, or a door outside, plus interconnected smoke and CO alarms. In a Lannon masonry foundation the cut is a real piece of work, and a home still on private septic needs a Waukesha County site evaluation first.
Opening
Foundation cut, window and well set
Alarms
Smoke and CO, interlinked
Septic homes
County evaluation before bedroom permit
Plumbing
Lannon wastewater flows to the treatment plant managed by the Village of Sussex, and the height of your sewer lateral where it leaves the house decides the drain plan. A lateral below the slab means saw-cutting the floor and tying in by gravity; one above it means an ejector pit or up-flush unit. Showers are membraned and the fan ducts outdoors.
Drains
Gravity tie-in or ejector
Shower
Membrane behind every tile
Exhaust
Fan ducted to outside
Hosting
A bar costs least where supply and drain are already close, so its spot is chosen with the plumbing, not the furniture. In houses that switched from a private well to village water, John notes where the new service and meter came in before choosing it. Cabinets, quartz or granite tops and under-cabinet lights follow.
Water
Supply and drain kept close
Power
Fridge and ice maker circuit
Counters
Quartz or granite slab
Utility
Shelving, closets and a clean utility room make the finished rooms easier to live in. Where an older stair is steep or tight overhead, treads, rail and lighting are rebuilt to code. In homes that moved to village water, a retired well tank can free up floor, and the furnace, water heater and panel keep their clearance.
Built-ins
Closets, shelves, under-stair storage
Stairway
Treads, rail and lighting
Utilities
Clearances left open
Finished jobs
Each picture here is a finished T And J job from somewhere in Waukesha County, photographed once the work was done. The addresses vary; the crew and the build sequence do not.
Theater
Recliner rows beneath a dark painted ceiling
Billiards
Pool table set with full cue clearance
Stone wall
Stacked stone feature wall lit by sconces
Bar
Galley bar in light wood with dark tops
Screen room
Projection screen, recliners, recessed lights overhead
The online gallery holds further basements, plus bathrooms and kitchens, from T And J jobs.
House-driven costs
Square footage sets the starting figure, and what goes into the space moves it. In Lannon the bigger swings often come from the house itself: a stone or block foundation that needs moisture work, an egress opening cut through masonry, or a bathroom where the sewer lateral sits above the slab. T And J writes one fixed price after the walkthrough.
Entry level
From $20k
Most chosen
Finish with plumbing
$20k–$60k
Egress, bath and more
$60k+
Start with your square footage
Run your basement’s square footage through the per-square-foot guide, then bring that figure to the Lannon walkthrough so John can add what the foundation needs.
Stone, block, poured
A basement wall here may be laid stone, concrete block or poured concrete, and each one handles damp differently. Materials are picked for how they cope with water and vapor first, then for comfort.
Board that sits flat on poured walls and never absorbs water.
Follows the rough face of stone and block and seals rim joists.
Used beside showers, bar sinks and the washer.
Panels lift out wherever valves, cleanouts or junctions sit above.
A waterproof core for family rooms and play space.
Indifferent to water, so it goes in baths and bars.
Soft in guest rooms and theaters, laid only over a dry slab.
Galvanized or composite wells sized for a cut through masonry or concrete.
Floors compared below grade
Floor type
Water resistance
Comfort
Suits
Vinyl plank
Waterproof core
Firm, fairly warm
Living and play rooms
Porcelain
Water does no harm
Cool without heat
Bath, bar, laundry
Carpet on pad
Ruined by flooding
Soft, warm
Guest rooms, theaters
Engineered wood
Limited; dry slab only
Real wood warmth
Dry, vapor-controlled rooms
Sealed concrete
Very high
Hard, cool
Gym, workshop, storage
Solid hardwood is not laid below grade. Every slab gets a moisture reading first, and if the number is high, a subfloor system or vapor barrier separates it from the finished floor.
Quarry village homes
Lannon was incorporated in 1930 as a quarry village on the Niagara Escarpment, and its houses record that history. Joseph Hadfield’s 1890 plat produced the worker homes known as Stone City, mid-century ranches and capes filled in later streets, and newer houses sit toward the village edge. Each era hands a basement project a different starting point.
Houses from the 1890 Hadfield plat on streets such as Lake, Vine, State and Bay, built for quarry workers. Masonry walls and limited headroom are common, and moisture is checked first.
Compact mid-century houses. Foundation type varies, so John confirms block or poured, then maps the forced-air trunks and beam that decide where rooms can go.
The lower level sits partly above grade, so windows are larger and daylight easier, though a crawl space or short basement can sit beside it.
Recent houses toward the edge of the village generally have taller poured walls, and John checks for any plumbing rough-in the builder left in the slab.
Lannon had no central sewer in 1990, and village water reached more than 170 properties only in 2021. Older basements can still hold retired well equipment or rerouted service lines, so every line is traced before a layout is drawn.
Permit terms
A permit, issued before anything happens on site. The Village of Lannon uses separate building, electrical, plumbing and HVAC permit forms, and those forms state that triple fees are due when work starts before the permit is issued.
The village appoints its building inspector, and the Village Clerk at the village hall on West Main Street handles permit paperwork. Lannon’s permit forms add a 10 percent administrative fee to every permit, state that a permit expires 90 days from its date unless noted otherwise, and make permits non-refundable and non-transferable. Inspections need at least 24 hours’ notice, and failing to call for one carries its own fee. Some Lannon mailing addresses fall in the Village of Lisbon or Menomonee Falls, which permit separately, and a home on private septic needs a Waukesha County site evaluation before a bedroom is added. T And J confirms the parcel, files every form and books each inspection.
Permit
New walls, rooms and insulation
Building permit; HVAC form if ducts extend.
Permit
Added circuits, lights and receptacles
Electrical permit on the village form.
Permit
Bathroom, bar or laundry drains
Plumbing permit; drains inspected open.
Permit
Egress cut through the foundation
Covered by the building permit, then inspected.
Triple fee
Any permitted work started early
Stated on every village form.
Usually none
Paint, sealer or new flooring
Finish surfaces only, no systems.
The sequence
Because a Lannon permit lapses 90 days after issue, the schedule is set before filing: layout fixed, windows and fixtures ordered, then the permit, then five build stages with an inspection before each layer is covered. Inspections are requested at least 24 hours ahead as each stage begins.
Free walkthrough · Permit timed right · One written price
Visit
John measures the space, identifies stone, block or poured walls, reads them and the slab for damp, and finds where the sewer lateral and water meter sit.
No charge
Weeks 1–2
John draws the layout with you, then sends one written price covering every room and finish.
Nothing paid upfront
Before filing
Windows and fixtures are ordered first, then T And J files the village building, electrical, plumbing and HVAC forms so the 90 days start when work can.
Filed by T And J
Build
Foam and studs go up, then wiring, drains and ducts, and the village inspector signs each stage before anything is closed in.
One in-house crew
Handover
Drywall, paint, trim, floors and fixtures go in, the final inspection is booked inside the permit window, and Teli or John walks the rooms with you.
Checked by an owner
4.9
4.9 average from 59 Google reviews of T And J remodeling projects across Waukesha County and southeastern Wisconsin.
Northeast county
From the Brookfield shop the crew heads north to Lannon and the villages around it in northeastern Waukesha County, finishing lower levels on the same terms: permit first, one price, one crew.
Sussex to the west and Menomonee Falls to the east. The treatment plant run by the Village of Sussex takes wastewater from all three, and each village sets its own permit rules.
Where many homes rely on private septic, so a basement bedroom there starts with a Waukesha County site evaluation.
Pewaukee, Hartland and Brookfield, each with its own basement page and its own permit office.
Visit or call
T And J works from 985 Georges Avenue in Brookfield, off I-94, and drives north to Lannon for every job. The walkthrough happens in your basement, with the walls and slab in front of you.
T And J All In Remodeling
Monday to Friday
8:00 AM to 5:00 PM
Saturday
8:00 AM to 5:00 PM
Sunday
Closed
Water emergencies
24/7
Permit-first FAQ
For your own house, call John at (262) 352-9525.
Most Lannon basements T And J finishes fall between about $20,000 for an open recreation room and $60,000 or more for a suite with a bedroom, bathroom and bar. Square footage sets the base. Older stone or block walls that need moisture work, and egress openings cut through masonry, are what push a quote higher here.
The village’s permit forms state that triple fees are due when work begins before the permit is issued, on top of the 10 percent administrative fee. Work may also have to be opened back up for inspection. T And J files first and starts only once the permit is in hand.
Often, with planning. T And J’s cost guide puts an 800 to 1,000 square foot basement at six to ten weeks from permit approval to final inspection, and a fuller build-out at ten to twelve. A bathroom adds two to three weeks, so if a scope could run past 90 days, that is settled before the permit is pulled.
Often, but only after an honest look. Houses from the 1890 Hadfield plat were built for quarry workers, and their basements can have stone or masonry walls, limited headroom and damp. John checks all three. If the space can be made dry and tall enough, it is finished; if not, he says so.
More than 170 Lannon properties moved to village water through the 2021 water project, after E. coli and fecal coliform turned up in private wells. Some basements still hold an old pressure tank or treatment unit. John checks what is still connected, and retired equipment can usually come out so the floor goes into the plan.
Yes, and before the walls close. Wisconsin’s Department of Health Services puts high radon in roughly one home in ten statewide, with 4 pCi/L as the level where action is advised. Test kits are sold by Waukesha County Environmental Health. If mitigation follows, its pipe is routed through open framing.
Lannon had no central sewer in 1990; today its wastewater goes to the plant managed by the Village of Sussex. Where your lateral leaves below the slab, new drains tie in by gravity after a saw cut. Where it leaves higher, an ejector pit or up-flush unit lifts waste to it. A house still on septic is checked first.
Not always. Some Lannon addresses sit in the Village of Lisbon or the Village of Menomonee Falls, and each issues its own permits on its own terms. T And J checks the parcel before quoting, so the permit, fees and inspector are the right ones from the start.
More remodeling
Permit-ready start
On the free walkthrough John identifies the wall type, reads it and the slab for damp, confirms the parcel is in the village and sends one written price. No deposit, and no charge for the visit.
Mention the street and roughly when the house was built.
No deposit · No obligation · Details stay with T And J
Request Your Free Consultation
Three short steps. John replies within 24 hours.
No deposit · No obligation · Your details stay private
T&J All In Remodeling
Teli and John quote every job themselves and build it start to finish — no subcontractors, no rotating crews. Tell us what you’re planning and we’ll bring a written, itemised estimate.
Quoted and built by the owners — no subcontractors. We’ll bring a written, itemised estimate.
“The team is reliable, honest, and operates with integrity.”
Maiyer Thao · Google