Deck Construction in Brookfield, WI

Deck construction in Brookfield, WI from T and J All In Remodeling on Georges Avenue: wood, composite and PVC decks set on footings below frost, with a flashed, through-bolted ledger, code-height guards and the City or Town permit filed for you.

Footings below frost  ·  Brookfield permit handled  ·  One written price

4.9 ★

60+ Google reviews

A+

BBB Accredited

30+

Years combined experience

Brookfield at a glance

What Does a Brookfield Deck Need to Pass Code?

Footings below frost, a ledger that keeps water out of the house, and guards wherever the deck stands more than 24 inches up. Brookfield winters drive those details more than the choice of board.

Footings

48 in deep

Footings go beneath the frost line so the frame cannot lift, typically 48 inches below grade in Wisconsin.

Guards

Over 24 in

Any open side more than 24 inches above grade gets a guard, at least 36 inches tall.

Permit

Filed for you

Brookfield expects a permit for a new deck, and T and J draws the plan and submits it.

Our Brookfield scope

Which Deck Projects Does T and J Take On in Brookfield?

A Brookfield deck is built bottom-up on one fixed price: concrete below frost, posts and beams, a flashed ledger, joists spaced to the board maker’s chart, then boards, guards and stairs.

Custom Deck Build

New build

Custom deck construction

Attached or freestanding decks planned around the door height, the slope of the yard and how you use it, from a grill landing to a full outdoor room. Flashing goes behind a through-bolted ledger so rainwater stays out of the rim joist.

Types

Attached, freestanding

Framing

Pressure-treated, code-sized

Decking

Wood, composite, PVC

Deck Construction

Second story

Raised and walkout-level decks

Upper-floor and walkout decks stand on tall, braced posts, with a guard on every open side above 24 inches. The area below can stay open, store equipment or stay dry under an under-deck ceiling.

Height

Walkout and upper floors

Guards

36 in minimum

Below

Storage or dry patio

deck construction near waukesha wi

Access

Deck stairs and lighting

Stairs get uniform risers, a graspable rail and a landing on long runs. Step and post-cap lights are wired while the frame is open, so they sit flush when the deck is done.

Stairs

Even risers, landings

Handrail

Graspable, continuous

Lighting

Step and post lights

Composite deck with black metal railing overlooking a wooded backyard

Replacement

Deck replacement and resurfacing

A sound frame can take new boards and railings. Rot at the footings, posts or ledger, or a frame never built to code, means tearing out and rebuilding rather than resurfacing over the problem.

Check

Footings, posts, ledger

Resurface

New boards and railings

Rebuild

Removed and reframed

Home Remodeling Waukesha Area & Custom Decks

Railings

Railing and guard installation

Guard posts are through-bolted to the frame so they hold against people leaning on them, in wood, powder-coated aluminum, stainless cable or glass panels.

Styles

Wood, aluminum, cable, glass

Posts

Through-bolted

Height

36 in minimum

Front porch with new steps and railings on a bungalow

Entry

Porch steps and landings

Cracked concrete stoops and worn front steps are rebuilt as framed wood or composite steps with a door landing and rails on both sides, set on footings like a deck.

Replace

Stoops and front steps

Build

Landings and railings

Base

Footings below frost

Finished work

Completed T and J Deck Builds

Every deck shown passed its footing, framing and final inspections.

Elevated deck

Raised deck with metal guards, lit in the evening

Attached deck

Broad stair run off a rear deck

Deck stairs

Lighted treads on deck stairs

Wood deck

Stained boards with black metal guards

Lakefront

Low lakeside deck

Siding, porches and other exterior projects are in the gallery.

What it costs

How Much Does a Deck Cost in Brookfield?

A Brookfield deck is priced after a site visit on its size, height, board material, railing and stair count. Height moves the price most, because anything over 24 inches needs guards and usually stairs, and every footing still goes below frost.

Under 24 in

Ground-Level Deck

Low platform

Most requested

24 in and up

Raised Deck

With guards

Walkout or upper floor

Second-Story Deck

Tall posts

Price your deck first

Start with the per-square-foot deck pricing guide, then confirm the number at a site visit.

Decking materials

Should a Brookfield Deck Be Wood or Composite?

Composite or PVC suits most Brookfield owners who want low upkeep, and pressure-treated or cedar suits a tighter budget. The frame below is treated lumber either way, so the choice is about the boards and railing.

Pressure-Treated Pine

Southern yellow pine treated for ground contact, the budget pick for stain or paint.

Cedar

Western red cedar, prized for its color and smell, resealed every year or two.

Capped Composite

Wood-grain look, never stained.

PVC Decking

All-plastic boards that will not absorb water, good under trees or on north sides.

Wood Balusters

Square spindles matched to a stained wood deck.

Aluminum Railing

Factory-finished aluminum posts and pickets, no repainting.

Cable Railing

Stainless cables that barely block the view.

Hidden Fasteners

Edge clips that hold boards without face screws.

Decking compared

Decking

Upkeep

Look

Watch for

Best fit

Pressure-treated pine

Restain about every three years

Paintable or stainable wood

Cracks and splinters if left unsealed

Budget-focused decks

Cedar

Clean and seal regularly

Warm natural grain

Dents more easily underfoot

Natural wood look

Capped composite

Wash seasonally, no staining

Many colors and grain patterns

Runs warm on a south-facing deck

Low-maintenance decks

PVC decking

Wash seasonally, no staining

Lighter weight, consistent color

Higher material cost

Wet or shaded yards

Most composite and PVC boards call for 12-inch joist spacing on diagonals or 16 inches straight, so the frame is laid out to the manufacturer’s span table.

Yards and lots

Which Deck Design Fits a Brookfield Yard?

It depends on how far the door sits above the yard. Brookfield is about 40.5 percent 1940s to 1960s ranches and 41.5 percent 1970 to 1999 homes, so low ranch decks and full-height walkout decks often share a street.

Ranch-Level Deck

Behind most 1940s to 1960s ranches the door is near grade, so the deck stays low and often below the 24-inch guard line.

Walkout Lot Deck

Behind 1970s to 1990s Brookfield colonials, the lower level often opens to the yard, which puts the main-floor deck a full story up with guards, stairs and a flashed ledger.

Rear Dining Deck

Off the kitchen slider, big enough for a dining table with clearance on all sides.

Multi-Level Deck

Two linked levels stepping down a sloped yard, often dining above and lounging below.

Freestanding Deck

Built apart from the house where grade or a patio makes a ledger impractical.

Brookfield permits and code

Is a Permit Required for a Deck in Brookfield?

Yes. The City of Brookfield requires a building permit for a new deck, plus an electrical permit when lighting or outlets are added; Inspection Services is at (262) 796-6646. Footing and framing inspections are booked by T and J.

Wisconsin offers no blanket exemption for small or low decks, and the Uniform Dwelling Code, SPS 320 to 325, Appendix B, sets the prescriptive rules. Footings bear below the frost line or at least 48 inches down, whichever is deeper; guards over 24 inches are at least 36 inches tall with balusters that stop a 4 3/8-inch sphere; and stairs with more than three risers get a handrail.

Permit

New attached deck

Plan review, footing check, final.

Permit

New freestanding deck

Required in most municipalities.

Permit

Rebuilding the deck frame

Footings, posts or ledger replaced.

Inspected

Stairs and guards

36-inch minimum above 24 inches.

Check locally

Resurfacing a sound frame

Confirm with the City or Town.

Usually none

Staining, sealing and cleaning

Upkeep only.

The build

From Site Visit to Final Inspection: Building a Brookfield Deck

A deck is treated as a structure, so it gets plan review and inspections: footings are checked before concrete, and the frame before boards go on.

No-cost site visit  ·  Permit pulled for you  ·  Nothing paid to start

Week 0

Site visit and measurements

John checks the yard’s slope, the door threshold height and the rim where a ledger would fasten, and marks setbacks and buried lines.

Free, at your house

Design

Design, boards and one price

Size, stairs, boards and railing are settled, then the deck is drawn and priced as one written number.

No deposit to start

Approval

Permit and materials

The plan goes in for a permit while lumber, boards and railing are ordered.

Submitted for you

Build

Footings, framing and inspection

Footing holes are dug and inspected, then posts, beams, the flashed ledger and joists are set.

Frame inspected open

Finish

Decking, railings and walkthrough

Boards, guards and stair treads are installed, the inspector signs the final, and Teli and John tour the deck with you before handover.

Owner sign-off

T and J on Google Reviews

4.9

★★★★★

Decks, siding and remodels across Waukesha County have earned T and J a 4.9 average from more than 60 Google reviews.

Where we work

Deck Building Across the Brookfield Area

Decks are built here by the crew that loads out from Georges Avenue every morning, so Brookfield jobs lose no time on the road.

Waukesha County

In Brookfield, New Berlin, Pewaukee, Sussex and Waukesha, walkout lots often need raised decks with stairs to the yard.

Milwaukee County

Closer to Milwaukee, in Wauwatosa, West Allis and Greendale, yards are tighter and decks stay compact by the back door.

Lake Country

Around Oconomowoc, Hartland, Delafield and Okauchee, lakefront decks are planned around the view and open guards.

Visit or call

Find T and J on Georges Avenue

T and J All In Remodeling is at 985 Georges Avenue, and every Brookfield deck is priced after John has walked the yard.

T And J All In Remodeling

985 Georges Avenue
Brookfield, WI 53045

Monday to Friday

8:00 AM to 5:00 PM

Saturday

8:00 AM to 5:00 PM

Sunday

Closed

Water emergencies

24/7

Common questions

Brookfield Deck Building Questions

Questions about your yard or an old deck? Call (262) 352-9525.

How much does it cost to build a deck in Wisconsin?

It depends mostly on size, height and boards. A low pressure-treated platform costs far less than a raised composite deck with guards and stairs, and T and J prices each Brookfield deck after measuring the yard.

Below the frost line or 48 inches beneath finished grade, whichever goes deeper, under Wisconsin’s Uniform Dwelling Code, so frost cannot lift the frame.

Usually, if you plan to stay. Composite costs more up front than pressure-treated pine, but skipping the restain-every-few-years cycle tends to close the gap over the life of a Brookfield deck.

Design and permitting can happen over winter, and footings go in while the ground can still be dug. Once frost sets deep, excavation and concrete get harder, so most Brookfield decks are framed spring through fall.

Yes, when the footings, posts, beams and ledger are sound. Rot at the ledger or footings that were never set below frost means a rebuild, because new boards on a failing frame only hide the problem.

Wash it each spring, clear leaves and snow piles off the boards, and keep gutters from spilling onto it. Wood decks also need a fresh coat of stain or sealer every few years; composite and PVC only need washing.

Get started

Get a Free Brookfield Deck Site Visit

John walks the yard, measures door heights and slope, checks where the deck can attach and follows up with one fixed written price, at no charge and with no deposit.

Send Your Deck Details

John replies the same working day.

No deposit  ·  No obligation  ·  Details stay with T and J

Request Your Free Consultation

Three short steps. John replies within 24 hours.

No deposit  ·  No obligation  ·  Your details stay private

T&J All In Remodeling
Free In-Home Estimate

The honest way to
remodel your Kitchen!

Teli and John quote every job themselves and build it start to finish — no subcontractors, no rotating crews. Tell us what you’re planning and we’ll bring a written, itemised estimate.

Quoted and built by the owners — no subcontractors. We’ll bring a written, itemised estimate.

4.9 60+ Google reviews · BBB A+ · Licensed & insured
Recent work01 / 04
4.9Google Rating

“The team is reliable, honest, and operates with integrity.”

Maiyer Thao · Google
Kitchen · Waukesha County