Custom decks built to the village’s own 48 inch footing rule, with SAFEbuilt booked a day ahead for every inspection and the permit filed by T And J before a post goes in.

48 in. footings · Booked with SAFEbuilt · Fixed written price

4.9 ★

60 Google reviews

A+

BBB Accredited

30+

Years combined experience

Village deck rule

Menomonee Falls Deck Requirements: Footings, Plans, Inspections

A deck in the Village of Menomonee Falls answers to a written footing rule, a plan reviewed at the village’s Engineering and Development Department, and inspections carried out by its contracted inspector rather than village staff.

Footing rule

48 in. minimum

The village’s own deck handout requires footings 48 inches below finished grade for any deck attached to the house or any detached deck that serves as an exit.

Near the river

Within 200 ft.

Land disturbed within 200 feet of the Menomonee River can trigger the village’s separate erosion control permit, on top of the deck permit itself.

Inspections

By SAFEbuilt

Footing, framing and final inspections on a Falls deck are carried out by the village’s contracted inspector, SAFEbuilt, on at least 24 hours notice.

Deck work here

T And J Deck Construction in Menomonee Falls

Every deck starts the same way in Menomonee Falls: footings to the village’s 48 inch depth, posts and beams, a ledger bolted through flashing at the house, joists sized to the span, then decking, rails and stairs. One in-house crew carries the whole job under a single fixed price, with SAFEbuilt booked at each stage.

Custom Deck Build

New build

Decks off raised doors

Many Falls houses are split-levels with the back door a half flight above the yard, so the deck is sized to that landing rather than squeezed at ground level. The ledger bolts through a flashed rim into the house framing, whether the deck stands off the kitchen or the family room walkout below it.

Types

Attached, freestanding

Framing

Treated, code-sized

Decking

Wood, composite, PVC

Deck Construction

Raised doors

Elevated Decks Off Split-Levels

A deck off a raised rear door or a walkout family room stands on tall braced posts, and any open side above 24 inches carries a guard built to the same height the village checks at final. Under the deck, the space can stay open, hold storage, or close in as a dry patio.

Height

Raised doors, walkouts

Guards

36 in. minimum

Below

Storage or dry patio

deck construction near waukesha wi

Access

Stairs down to the yard

Stairs off a raised door are laid out with even risers, a handrail you can grip, and a landing where the run is long enough to need one. Lighting cable is pulled during framing, so step and post-cap lights sit flush once the boards go down.

Stairs

Even risers, landing

Handrail

Continuous, graspable

Lighting

Step and post-cap lights

Composite deck with black metal railing overlooking a wooded backyard

Replacement

Resurfacing a Boom-Era Deck

A deck built during the 1958 to 1963 annexation boom is now well past its original service life, and a sound frame can often carry new boards and rails as they are. Where footings sit above frost, the ledger was never flashed, or posts have rotted, the old structure comes off and a new one goes up on proper footings before anything new is installed.

Check

Footings, ledger, posts

Resurface

New boards, same frame

Rebuild

Full tear-out, new footings

Home Remodeling Waukesha Area & Custom Decks

Railings

Guards Built to Code

Wood, aluminum, cable and glass railings go on through-bolted posts so a lean does not work them loose. Slim balusters keep a view across the yard open while still meeting guard height.

Choices

Wood, aluminum, cable, glass

Posts

Through-bolted

Height

36 in. minimum

Front porch with new steps and railings on a bungalow

Entry

Steps for Older Falls Homes

Cracked stoops on the village’s older streets near the river are replaced with framed wood or composite steps, a landing at the door and rails on both sides, carried on footings just like a deck.

Replace

Cracked concrete stoops

Build

Landing, rails both sides

Base

Footings to 48 in.

Finished work

Completed T And J Decks in Waukesha County

These decks were photographed once complete, each one permitted at the village and inspected from the footings up.

Elevated deck

Metal-railed deck lit after dark

Attached deck

Broad stairs off a rear deck

Deck stairs

Treads with built-in lighting

Wood deck

Black rail over a stained deck

Lakefront

Low deck set above the water

Siding and porch work from other Menomonee Falls projects sits in the T And J gallery.

What it costs

What Goes Into a Menomonee Falls Deck Price?

A Falls deck is quoted after the site visit, and most builds finish in under two weeks once the permit clears. Height decides most of the price, since anything over 24 inches needs guards and usually a stair run, and every footing still goes to the village’s 48 inch depth.

Low deck

Ground-Level Deck

At the door

Most requested

Off a Raised Door

Raised Deck

With guards

Split-Level or Walkout

Elevated Deck

Tall posts

Estimate before the visit

Run your deck size through the Wisconsin per-square-foot guide, then bring that figure to John.

Decking choices

Wood or Composite for a Menomonee Falls Deck?

The board you walk on and the rail you look through set the upkeep for the life of a Falls deck. Underneath, the frame is pressure-treated lumber either way, so the real choice sits at the surface.

Pressure-Treated Pine

Affordable boards ready for paint or stain.

Cedar

Warm natural grain, resealed on a regular schedule.

Capped Composite

Grain-look boards that skip staining.

PVC Decking

Light, moisture-shedding boards suited to damp or shaded yards.

Wood Balusters

Old-style railing that pairs with a stained deck.

Aluminum Railing

Powder-coated rails and balusters that skip repainting for good.

Cable Railing

Slim stainless cables that leave sightlines open.

Hidden Fasteners

Fasteners set beneath the board, not through its face.

Decking compared

Decking

Upkeep

Look

Watch for

Where it fits

Pressure-treated pine

Restain or reseal every few years

Takes paint or stain

Splinters or checks if left bare

Tight budgets

Cedar

Reseal on a schedule

Warm, natural look

Dents more than composite

Traditional wood look

Capped composite

Rinse off, no staining

Grain patterns, many colors

Gets hot in direct sun

Low-upkeep decks

PVC decking

Rinse off, no staining

Light, steady color

Costs more upfront

Damp or shaded lots

Composite and PVC boards call for tighter joist spacing than most wood decks, so framing follows the board maker’s own span chart.

Falls yards

What Kind of Deck Suits a Menomonee Falls Yard?

Six annexations starting in October 1958 turned Menomonee Falls from about two square miles into roughly thirty-three, and most of that boom-era land holds ranches and split-levels built through the 1960s. The height of the back door on that stock, more than the size of the lot, decides how a deck sits.

Split-Level Walkout

The village’s signature house type puts the kitchen half a flight above a family room that often opens straight to the yard. The deck lands on that upper landing, so guards, a stair run and a flashed ledger carry most of the job.

Boom-Era Ranch

On a 1950s or 60s ranch the back door sits close to grade, so the deck stays low, often under the 24 inch guard line, and reads as part of the lawn.

1990s Subdivision Lot

Newer lots platted after 1990 tend to run deeper, leaving room for a dining deck sized well past the sliding door.

River-Corridor Lot

Older parcels along the Menomonee River sit closer to the water, where footing work can trigger the village’s erosion control review.

Freestanding Deck

Set apart from the house where an existing patio, a steep grade, or a foundation wall makes a ledger connection impractical. No ledger, so the frame stands on its own.

Falls permits and SAFEbuilt

Menomonee Falls Deck Permit: Village Requirements

Yes. The Village of Menomonee Falls issues a building permit for a new deck through its Engineering and Development Department, and the application needs a survey showing the deck against the property lines along with two copies of dimensioned construction plans. T And J prepares both and files them.

The village’s own deck rule is specific: a deck attached to the house, and any detached deck that serves as an exit, needs a footing 48 inches below finished grade. Three inspections follow, footing before the concrete, framing before the boards go down, and a final at completion, each booked with the village’s contracted inspector, SAFEbuilt, on at least 24 hours notice. A permit goes only to a contractor the state has certified as both a Dwelling Contractor and a Qualifier. The deck cannot block access to the electric meter, the zoning department confirms the setback before drawing starts, and a lot on private sewage needs a Waukesha County site evaluation first. Guard and baluster spacing still follow the statewide Uniform Dwelling Code.

Permit

New attached deck

Survey, plans and two inspections.

Permit

New freestanding deck

Same permit, no ledger.

Permit

Rebuilding footings or ledger

New footing depth confirmed first.

Inspected

Guards and stairs

Guards required over 24 in., per statewide code.

Ask first

New boards on a sound frame

Confirmed with SAFEbuilt first.

Usually none

Staining and sealing only

Upkeep only.

The build

How a Menomonee Falls Deck Gets Built

A deck is a small structure, but in Menomonee Falls it still passes through the village’s full review: a survey and plans at the start, then footing, framing and final inspections booked with SAFEbuilt as the crew moves.

Free visit · Village permit filed · No deposit

Week 0

Visit and measurements

John measures the door height, the yard grade and where the ledger can attach, and checks the setback and the meter location.

Free, at your house

Design

Layout, materials, fixed price

Board choice, railing style and stair count are settled together, and John writes the whole job up as a single price.

No deposit to start

Approval

Permit and materials

The survey and construction plans head to the village while lumber, boards and rail stock get ordered.

Filed by T And J

Build

Footings, framing, inspections

Holes are dug and passed at footing inspection, posts and beams follow, the ledger gets its flashing, and the frame comes together stage by stage.

In-house crew

Finish

Decking, rails, walkthrough

Boards, guards and stairs go on, SAFEbuilt signs off at final, and Teli and John walk the finished deck with you.

Owner sign-off

Google reviews

4.9

★★★★★

4.9 average from 60 Google reviews of T And J remodeling projects across Waukesha County and southeastern Wisconsin.

Nearby villages

Deck Building Near Menomonee Falls and Milwaukee County

T And J runs decks from the Brookfield shop across Waukesha County and into Milwaukee County, working the same split-level and boom-era lots that surround Menomonee Falls.

Sussex and Lannon

Sussex and Lannon share the same 1950s and 60s subdivision layouts, with Menomonee Park’s old quarry lake sitting on the line between Lannon and the Falls.

Brookfield and Pewaukee

Brookfield, Pewaukee and Waukesha, closer to the Georges Avenue shop where the crew starts every working day.

Milwaukee County

Wauwatosa, Milwaukee and West Allis, where older city lots often call for a deck closer to the house.

Visit or call

Where Is T And J Located?

T And J All In Remodeling is based at 985 Georges Avenue in Brookfield, WI, just south of the Falls off I-94. Deck consultations happen at your house.

T And J All In Remodeling

985 Georges Avenue
Brookfield, WI 53045

Monday to Friday

8:00 AM to 5:00 PM

Saturday

8:00 AM to 5:00 PM

Sunday

Closed

Water emergencies

24/7

Deck FAQ

Menomonee Falls Deck Permit and Footing FAQ

Ask about your own yard at (262) 352-9525.

How much does a deck cost in Menomonee Falls?

A Falls deck is quoted after John sees the yard, since height, size, railing and stairs all move the number. Most builds finish in under two weeks once the village permit clears, and the per-square-foot guide gives a starting range to plan around.

Yes. The Village of Menomonee Falls requires a building permit for a new deck, reviewed by its Engineering and Development Department. T And J prepares the survey and plans, files them, and books every inspection.

Three visits: footing before the concrete, framing before the boards go on, and a final at completion. Each one is booked with SAFEbuilt, the village’s contracted inspector, at least 24 hours ahead.

Possibly. The village asks for a separate erosion control permit wherever land disturbance sits within 200 feet of the Menomonee River, whatever the size of the project. John checks the parcel against that line before quoting a riverside deck.

Often, yes. The village’s signature split-level puts the back door a half flight above the yard, so the deck lands on tall, braced posts rather than at ground level. Guards over 24 inches, a stair run to the lawn and a ledger bolted through flashing carry most of the design.

It can be. The village’s own deck rule says the structure cannot block access to the electric meter pedestal, so its position on the wall is checked before the layout is drawn, not after.

If the property runs on private sewage rather than the village system, the village asks for a Preliminary Site Evaluation from Waukesha County before it will issue the deck permit. T And J confirms which applies at the first visit.

Sometimes. A deck from the 1958 to 1963 annexation boom can be sixty years old, and if the footings, posts and ledger are still sound, new boards and rails go on as they are. Where any of those has failed, the frame is rebuilt before anything new goes down.

Get started

Book a Free Deck Consultation in Menomonee Falls

John visits the yard, checks the door height and the setback, and sends one fixed written price for the village permit and the build. No deposit, and the visit costs nothing.

Send Your Menomonee Falls Deck Details

John replies the same day.

No deposit  ·  No obligation  ·  Details stay with T And J

Request Your Free Consultation

Three short steps. John replies within 24 hours.

No deposit  ·  No obligation  ·  Your details stay private

T&J All In Remodeling
Free In-Home Estimate

The honest way to
remodel your Kitchen!

Teli and John quote every job themselves and build it start to finish — no subcontractors, no rotating crews. Tell us what you’re planning and we’ll bring a written, itemised estimate.

Quoted and built by the owners — no subcontractors. We’ll bring a written, itemised estimate.

4.9 60 Google reviews · BBB A+ · Licensed & insured
Recent work01 / 04
4.9Google Rating

“The team is reliable, honest, and operates with integrity.”

Maiyer Thao · Google
Kitchen · Waukesha County