Wood and composite deck builds for wooded Kettle Moraine yards in the Village of Wales: footings that dodge the septic system, a flashed ledger, code-height guards, and the permit filed ahead of the Wednesday review window.
Footings clear of septic · $40 village permit filed · Fixed written price
4.9 ★
60 Google reviews
A+
BBB Accredited
30+
Years combined experience
One office hour a week
In the Village of Wales a deck permit is reviewed at a single Wednesday office hour, so the footings, the septic layout and the fee schedule all get settled on paper before anyone touches a shovel.
Footings
Below frost, past septic
Deck footings still go below the Wisconsin frost line, and on a Wales lot they are also laid out clear of the septic tank and drainfield.
Guards
Above 24 inches
Any deck surface more than 24 inches above grade needs a guard under Wisconsin’s building code, at least 36 inches high with closely spaced balusters.
Permit
$40, filed for you
The Village of Wales charges a flat forty dollar fee for a new deck permit, and T And J prepares and files it for you.
Deck work, start to finish
Every deck starts the same way whatever the yard looks like: footings dug below frost and clear of the septic system, posts and beams set, a ledger bolted and flashed at the house, then joists, decking, railings and stairs, all under one fixed price from the same crew.

New build
Attached or freestanding, each deck is planned to the door height, the slope of a wooded Wales lot and where the septic tank and drainfield sit, from a small grilling platform to a full outdoor room. The ledger is through-bolted behind flashing so water never reaches the house framing.
Types
Attached, freestanding
Framing
Pressure-treated, code-sized
Decking
Wood, composite, PVC

Second story
Wales has plenty of split-entry and raised-ranch houses from the 1970s where the lower level walks out to the yard, so the deck off the main floor sits a full storey up on braced posts, with a guard on every open side above 24 inches.
Height
Split-entry and raised ranch
Guards
36 in minimum
Below
Storage or dry patio

Access
Stairs are built with even risers, a continuous graspable handrail and a landing wherever the run is long, and on a sloping Wales lot that often means more risers than the plan first shows. Step and post-cap lights are wired in during framing.
Stairs
Even risers, landings
Handrail
Graspable, continuous
Lighting
Step and post lights

Replacement
When the frame is sound, fresh boards and railings simply go over it. When footings sit too shallow, the ledger has rotted, or the septic lines were never mapped before the last deck went in, the structure comes off and gets rebuilt properly instead of resurfaced over a hidden problem.
Check
Footings, posts, ledger
Resurface
New boards and railings
Rebuild
Full tear-out and new frame

Railings
Wood, aluminum, cable and glass-panel railings go on with through-bolted posts so they hold against a leaning crowd. Slim balusters keep the view of the trees open while still meeting guard height.
Styles
Wood, aluminum, cable, glass
Posts
Through-bolted
Height
36 in minimum

Entry
Cracked concrete stoops and worn front steps are replaced with framed wood or composite steps, a landing at the door and railings on both sides, built on footings set below frost like a deck.
Replace
Stoops and front steps
Build
Landings and railings
Base
Footings below frost
Finished work
Finished decks, photographed once complete. Each one cleared permit review and inspection from footings to final board.
Elevated deck
Raised deck with metal railing, lit at dusk
Attached deck
Wide stairs running down off a rear deck
Deck stairs
Stair treads fitted with built-in step lights
Wood deck
Stained deck paired with a black metal railing
Lakefront
Low deck with a lake view
More exterior work, including siding and railings, sits in the T And J project gallery.
What it costs
Deck cost in Wales follows the same drivers as anywhere in the county: size, height, decking material, railing style and how many stairs it takes to reach the yard. Height decides the most, since anything over 24 inches needs guards, usually stairs, and footings still clear of the septic line below frost.
Under 24 in
Low platform
Most requested
24 in and up
With guards
Walkout or upper floor
Tall posts
Know your range first
Match your deck’s footprint to current Wisconsin per-square-foot numbers, then bring that figure to the free walkthrough.
Decking materials
Decking and railing set the upkeep for the life of the deck. The frame beneath is pressure-treated lumber either way; the real choice is the board you walk on and the railing you see through, especially under Wales tree cover.
Affordable boards ready for stain or paint.
Rich grain and warmth that needs regular sealing.
Wood-look boards that skip the staining.
Light, moisture-proof boards suited to shaded Wales lots.
Traditional railing to pair with a stained deck.
Powder-coated metal that never needs repainting.
Slim stainless cables that keep the tree line in view.
Hidden clips that keep the surface screw-free.
Decking compared
Decking
Upkeep
Look
Watch for
Suits
Pressure-treated pine
Clean and restain every few years
Paintable or stainable wood
Checking and splintering if not sealed
Budget-focused decks
Cedar
Clean and seal regularly
Warm natural grain
Softer surface dents more easily
Natural wood look
Capped composite
Wash seasonally, no staining
Wood-grain patterns, many colors
Less benefit under heavy shade
Low-maintenance decks
PVC decking
Wash seasonally, no staining
Lighter weight, consistent color
Higher material cost
Wet or shaded yards
Composite and PVC boards ask for closer joist spacing than most wood decking, so the frame gets built to whatever span table the board maker publishes.
Wooded, sloping lots
About a third of the homes in the Village of Wales went up during the 1970s building boom, many as split entries and raised ranches on sloping, wooded Kettle Moraine lots with a walkout lower level. Grade at the back of the house, and where the septic system sits, decide more about a Wales deck than square footage does.
Common behind the split entries and raised ranches built through the 1970s, where the lower level opens straight to the yard. Because the deck stands a full level above grade, guards, stairs and a properly flashed ledger carry most of the design.
On the village’s older ranch homes the door sits close to grade, so the deck stays low, often under the 24 inch guard threshold, and reads as part of the lawn.
Right off the kitchen door on a flatter village lot, sized to fit a table with enough room to pull out the chairs.
Two connected levels that step down a sloped Kettle Moraine yard, usually a dining deck above and a lounge below.
Set away from the house where the septic tank, the drainfield or the grade makes a ledger attachment impractical. With no ledger, the frame stands on its own.
Wales permits, village or town
Yes. Inside the Village of Wales, the Building Inspector reviews deck permits at a single office hour, Wednesdays from 11 am to noon, and charges a flat forty dollar fee. A property outside the village boundary permits instead through the Town of Genesee.
Wisconsin sets no statewide exception for small or low decks, so Wales expects a permit on nearly every new build. Footings must reach undisturbed soil beneath frost, never less than 48 inches under finished grade, whichever runs deeper, and on a village lot they also stay clear of the septic tank and drainfield. Once a deck climbs past 24 inches above grade, guards standing at least 36 inches are required, with balusters spaced no wider than four and three-eighths inches apart, and a stairway of more than three steps calls for a graspable rail. Break ground before the permit is issued and the village doubles what you owe.
Permit
New attached deck
Filed at the office hour.
Permit
New freestanding deck
Also required in Wales.
Permit
Rebuilding the deck frame
New footings, posts or ledger.
Inspected
Stairs and guards
Needed past 24 in, railed to 36 in.
Village confirms
New boards on a sound frame
Confirmed at the walkthrough.
Usually none
Staining, sealing and cleaning
Maintenance only.
How it happens
A deck is a small structure, but in Wales it still goes through the village’s full review: footing inspection before concrete, then a frame check before the decking closes it up.
Free site visit · $40 permit filed · No deposit to start
Week 0
John measures the yard, the door heights and the grade, checks where the ledger can attach, and notes the septic layout and any setbacks.
Free, at your house
Design
Size, stairs, decking and railing are chosen, and the deck is drawn and priced as one written figure.
No deposit to start
Approval
The plan goes in for the Wednesday review and the lumber, decking and railing are ordered.
Handled by T And J
Build
Footing holes are dug clear of the septic lines and inspected, the posts go in plumb with beams set on top, and the ledger gets flashed.
In-house crew
Finish
Boards, guards and stairs go on, the final inspection passes, and Teli and John walk you through the finished deck.
Owner sign-off
4.9
4.9 average from 60 Google reviews of T And J remodeling projects across Waukesha County and southeastern Wisconsin.
Around the village
T And J’s deck crew runs out of its Brookfield yard into Wales and the wooded communities around it, covering everything from Kettle Moraine walkouts to village lots on well and septic.
Delafield, Hartland, Nashotah and Merton, where wooded, sloping lots make septic-aware footing layout as important as frost depth.
Oconomowoc and Okauchee, where lakefront decks are planned around the view and open railings.
Waukesha and Brookfield, where T And J’s crew and yard keep travel time off the build.
Visit or call
T And J All In Remodeling is based at 985 Georges Avenue in Brookfield, WI, reached from Wales out Highway 18. Consultations happen at your house.
T And J All In Remodeling
Monday to Friday
8:00 AM to 5:00 PM
Saturday
8:00 AM to 5:00 PM
Sunday
Closed
Water emergencies
24/7
Deck FAQ
Ask about your Wales yard at (262) 352-9525.
Deck cost in Wales follows size, height, decking material, railing style and how many stairs the yard requires, plus the village’s flat forty dollar permit fee. T And J measures the site and quotes one fixed figure before work starts.
Yes. Inside the Village of Wales a deck needs a building permit reviewed at the Wednesday office hour; outside the village line, the Town of Genesee issues it instead. T And J files either one.
Below the Wisconsin frost line, commonly 48 inches under finished grade, and clear of any septic tank or drainfield on the lot. The village confirms the exact depth at review.
Wisconsin’s building code calls for a guard on any open side of a deck surface more than 24 inches above grade, at least 36 inches tall, with a handrail on longer stair runs.
Composite and PVC cost more upfront than pressure-treated lumber, yet skip the recurring stain-and-seal cycle altogether, which counts for more under Wales’s shade-heavy tree cover where boards dry out slowly. Pressure-treated lumber still makes sense when the budget is tight or finishing the deck yourself is part of the plan.
Digging footings and pouring concrete gets far harder once a wooded Wales lot freezes solid, so crews build from thaw through late fall instead. Design work and the Wednesday permit review both happen through the winter months, so the crew can break ground the moment the frost lets go.
Sound footings, posts, beams and a solid ledger mean fresh decking and railings can be layered straight over what is already there. T And J opens the structure up to check first; rot at the ledger, or footings that never reached proper depth, means a full rebuild rather than a resurface.
Give the boards a rinse once the snow clears each year, do not let fall leaves pile against them through a wooded Wales lot’s drop, and walk every railing and stair tread each season. Wood surfaces still want restaining every few years to hold up.
More services
Get started
John visits the yard, measures the site and the door heights, checks where the deck can attach clear of the septic system, and sends back a single written number. No deposit, and no charge for the visit.
John replies the same working day.
No deposit · No obligation · Details stay with T And J
Request Your Free Consultation
Three short steps. John replies within 24 hours.
No deposit · No obligation · Your details stay private
T&J All In RemodelingTeli and John quote every job themselves and build it start to finish — no subcontractors, no rotating crews. Tell us what you’re planning and we’ll bring a written, itemised estimate.
Quoted and built by the owners — no subcontractors. We’ll bring a written, itemised estimate.
“The team is reliable, honest, and operates with integrity.”
Maiyer Thao · Google