Custom wood and composite decks for Merton homes, where a Village of Merton or Town of Merton address decides the permit path, and lakefront lots near North Lake or Okauchee Lake add a shoreland step.
Village or town, filed right · Site evaluation handled · Fixed written price
4.9 ★
60 Google reviews
A+
BBB Accredited
30+
Years combined experience
Two Mertons, two offices
Merton is split between a village and a surrounding town that share a name but not a permit process. A village deck follows the ordinary building permit; a town deck needs a county site evaluation first.
Address
Village or town
The Village of Merton and the Town of Merton are separate governments, and which one your address sits in decides how a deck gets permitted here.
Evaluation
Town lots only
On a Town of Merton address, Waukesha County requires a preliminary site evaluation before a deck permit is issued.
Shoreland
Near the lakes
Merton sits among North Lake, Lake Keesus and the Bark River, so a lot within 1,000 feet of the water carries extra review.
Merton deck scope
A village lot and a town lot both get built the same way once ground is broken: footings set below frost, posts and beams raised, the ledger flashed and bolted to the house, joists cut to fit the decking. The only thing that changes on a town address is what happens before the first shovel goes in, the county site evaluation.

New build
How the lot actually gets used decides the shape, whether that means a compact grilling platform behind a village bungalow or a full outdoor room on acreage with space to spare; door height and yard grade get worked in either way, attached or freestanding.
Types
Attached, freestanding
Framing
Pressure-treated, code-sized
Decking
Wood, composite, PVC

Second story
Walkout basements, common in Merton’s newer subdivisions, put the door a full storey above grade, which means tall braced posts holding up the deck and a guard running any side that clears 24 inches. Underneath stays open for storage or becomes a dry patio.
Height
Walkout and upper floors
Guards
36 in minimum
Below
Storage or dry patio

Access
A long stair run, common where an elevated Merton deck steps down a sloped subdivision yard, gets even risers, a landing partway if the drop is tall, and a handrail sized to actually grip. Step and post-cap lights go in with the framing, not after.
Stairs
Even risers, landings
Handrail
Graspable, continuous
Lighting
Step and post lights

Replacement
A frame in good shape, footings, posts, ledger all sound, just needs new boards and rails on top. Plenty of Merton’s older lake cottage decks are not in that shape: guard heights and footings from decades ago do not meet current code, and a full rebuild is the more honest path.
Check
Footings, posts, ledger
Resurface
New boards and railings
Rebuild
Full tear-out and new frame

Railings
Glass-panel, cable, aluminum and wood railings all go up through-bolted to resist a leaning load. On a lot near North Lake or Okauchee Lake, it is the slimmer metal and cable styles that keep the water view open.
Styles
Wood, aluminum, cable, glass
Posts
Through-bolted
Height
36 in minimum

Entry
Crumbling concrete stoops on the older houses near the village center are replaced with framed wood or composite steps, a landing at the door and railings on both sides, built on footings below frost.
Replace
Stoops and front steps
Build
Landings and railings
Base
Footings below frost
Recent builds
A look at decks already finished, permitted and signed off before the last board went down, village address or town.
Elevated deck
Elevated deck, metal railing, lit at dusk
Attached deck
Broad stairs down from a rear deck
Deck stairs
Stair treads fitted with step lights
Wood deck
Stained deck with black metal rail
Lakefront
Low deck overlooking a quiet lake
Siding and porch work from other Merton-area jobs sits alongside these decks in the gallery.
Sizing the budget
Height decides more of a Merton deck’s price than anything else, because it sets whether guards and a longer stair run enter the picture at all. Size, the decking you choose, railing style and stair count add from there, the same as anywhere in Wisconsin. A town lot carries one more step ahead of all of it: the site evaluation.
Under 24 in
Common near the village
Most requested
24 in and up
On subdivision walkouts
Walkout or upper floor
Lake cottage decks
Know the range first
Run your deck’s rough dimensions through the current Wisconsin per-square-foot numbers before the walkthrough, not after.
Decking materials
What holds up a Merton deck for years comes down to two choices. The frame is pressure-treated lumber on every job here, village lot or septic acreage alike; it is the walking surface on top where wood and composite genuinely part ways on upkeep.
The budget choice, stainable or paintable.
Warm natural grain that needs regular sealing.
Wood-grain boards with no staining.
Light, moisture-proof boards for shaded or wet yards.
A traditional look that pairs with a stained deck.
Aluminum posts and balusters, powder-coated so they never need paint.
Thin stainless cables that keep the lake view open.
Fastening clips keep the board face free of screws.
Decking compared
Decking
Upkeep
Look
Watch for
Good for
Pressure-treated pine
Clean and restain every few years
Paintable or stainable wood
Checking and splintering if not sealed
Village bungalow budgets
Cedar
Clean and seal regularly
Warm natural grain
Softer surface dents more easily
Acreage lot decks
Capped composite
Wash seasonally, no staining
Wood-grain patterns, many colors
Surface heats up in full sun
Rental or lake homes
PVC decking
Wash seasonally, no staining
Lighter weight, consistent color
Higher material cost
Wooded lots near lakes
Composite and PVC boards flex differently than wood, so the joists underneath sit closer together than a wood-decked frame typically calls for, per the maker’s own span chart.
Merton lot types
Merton runs from an older village core, through ranches and colonials on well-and-septic acreage, to 1920s lake cottages built for summer and subdivisions raised on former farmland between the 1960s and 1990s. Each one puts the deck in a different place relative to the door and the grade.
Older houses near the village center sit on smaller lots, so the deck is usually a compact rear platform off the kitchen door, sized for a table rather than an outdoor room.
On the ranches and colonials that sit on larger well-and-septic parcels, the deck often runs the width of the house, with room for the long driveway to matter for material delivery.
A 1920s cottage converted to year-round living often carries a deck built long before current guard and footing rules applied.
On the 1960s to 1990s subdivisions built on former farmland, the deck sits a full storey up off the walkout level.
On a town lot within 1,000 feet of North Lake, Okauchee Lake or the Bark River, the deck sits in shoreland jurisdiction and the layout is checked against it early.
Two jurisdictions, one evaluation
Yes. The Village of Merton lists decks among the work that needs a building permit, filed with its building inspector. On a Town of Merton address, Waukesha County requires a preliminary site evaluation first, and the permit follows once that clears.
A deck does not get a pass just because it is small: nothing in Wisconsin code sets a size below which the permit gets skipped. What changes by address is the extra step. A Town of Merton parcel goes through the county’s Category A site evaluation, the same track used for a shed, a pool or an outbuilding, well short of the fuller review an addition triggers. That check looks at the deck against the property’s private septic system, not at the deck’s design. Once it clears, the same statewide rules take over everywhere: solid ground below the frost line, and a guard wherever the surface clears 24 inches.
Permit
Village attached deck
Filed with the village inspector.
Permit
Town attached deck
Site evaluation required first.
Evaluation
New freestanding or shoreland deck
County Category A evaluation.
Inspected
Stairs and guards
Any guard over 24 inches must reach 36 in.
Check locally
New boards on a sound frame
Rules vary by address
Usually none
Staining, sealing and cleaning
Maintenance only.
How it happens
A deck is a small structure, but in Merton it still goes through a real approval process, and which one depends on the address. The site visit sorts that out before any design work begins.
Free site visit · Jurisdiction confirmed · Fixed written price
Week 0
John measures the yard, checks the ledger attachment and door heights, and confirms whether the address is village or town.
Free, at your house
Design
Stairs, decking and railing get chosen at this stage, and what comes out of it is a drawing plus a single written number.
No deposit to start
Approval
The permit is filed, or the county evaluation is filed first on a town lot, and materials are ordered.
Handled by T And J
Build
Footing holes go in and get inspected first, then posts, beams and a flashed ledger complete the frame.
In-house crew
Finish
Final inspection happens once decking, guards and stairs are complete, and then Teli and John walk the finished deck with you.
Owner sign-off
4.9
4.9 average from 60 Google reviews of T And J remodeling projects across Waukesha County and southeastern Wisconsin.
Where we work
From its Brookfield yard, T And J reaches Merton and the wider Lake Country area, building decks on both village lots and open acreage.
Hartland, Sussex and Lannon, where the same village-or-town permit question comes up on plenty of addresses.
Nashotah, Delafield, Okauchee and Oconomowoc, where lakefront lots bring the same shoreland review into play.
Pewaukee and Brookfield, close to the Georges Avenue yard where every Merton job is loaded out.
Visit or call
985 Georges Avenue in Brookfield is T And J’s shop, sitting on the I-94 corridor between Milwaukee and Lake Country. For a Merton deck, John comes out to you instead.
T And J All In Remodeling
Monday to Friday
8:00 AM to 5:00 PM
Saturday
8:00 AM to 5:00 PM
Sunday
Closed
Water emergencies
24/7
Deck FAQ
Ask about your Village or Town address at (262) 352-9525.
Size, height, the decking you pick, the railing style and how many stairs are involved all move the number, no differently than they would anywhere else in the state. T And J measures your Merton lot and returns one fixed figure in writing.
A Town of Merton address needs the county’s preliminary site evaluation before the permit issues; that step is Category A, shared with pools and sheds, not the deeper review an addition gets. A Village of Merton address skips straight to the ordinary permit.
Frost is the reason footings go deep at all: ground that heaves in winter will lift a deck that is not anchored below it. Wisconsin municipalities commonly set that line at 48 inches. John confirms what Merton’s inspector expects at the actual visit.
Once a deck surface sits higher than 24 inches off the ground, Wisconsin code calls for a guard along every open edge, built to at least 36 inches, with a graspable handrail wherever there is a stair run.
Buying composite costs more up front than pressure-treated lumber, but the payback is skipping the stain-and-seal cycle for good. On a 1920s lake cottage kept as a getaway, or any rural property where getting back out to a deck every couple of summers is a hassle, that math usually favors composite.
Digging footings into frozen ground is the real obstacle, which is why most Merton decks go up between spring and fall. None of that stops the paperwork: design work, and on a town lot the county site evaluation, can both move forward through the winter months.
A sound frame, meaning the footings, posts, beams and ledger all check out, just needs new boards and railings laid on top. That is not the case for plenty of Merton’s 1920s lake cottages, where those parts predate today’s guard and footing rules and a rebuild is the honest answer.
Each spring, hose off the boards and clear away anything piled against them, fallen leaves or a lingering snowbank either one. Check every railing and stair tread on the same visit. A wood deck near one of Merton’s lakes also wants restaining on a set cycle.
More services
Get started
At the walkthrough, John measures your yard and door heights, checks the ledger attachment, sorts out whether the address is village or town, and hands you one number in writing. No deposit, nothing owed for the visit itself.
John replies the same working day.
No deposit · No obligation · Details stay with T And J
Request Your Free Consultation
Three short steps. John replies within 24 hours.
No deposit · No obligation · Your details stay private
T&J All In RemodelingTeli and John quote every job themselves and build it start to finish — no subcontractors, no rotating crews. Tell us what you’re planning and we’ll bring a written, itemised estimate.
Quoted and built by the owners — no subcontractors. We’ll bring a written, itemised estimate.
“The team is reliable, honest, and operates with integrity.”
Maiyer Thao · Google